Home / Browse projects / Raigarh, Maharashtra / Jindal Avenue

Completed No litigation declared Residential / Group Housing project

Jindal Avenue

By Jindal Builders and Developers

RG-MH-95576 · RERA P52000031962 · Last updated on MahaRERA portal: 11 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Jindal Avenue is a Residential / Group Housing project by Jindal Builders and Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000031962 on 29 Nov 2021. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameJindal Avenue
  • TypeResidential / Group Housing
  • Location
    • S NO 796/A
    • B
    • C
    • PANVEL
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000031962
  • ReraGenie IDRG-MH-95576

Builder

  • NameJindal Builders and Developers
  • Entity typePartnership
  • PartnersSagar Sachin Agarwal, AKASH SACHIN AGARWAL, SACHIN OMPRAKASH AGARWAL
  • Other registrations6 more →
  • Completed3 of 7
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2021PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Nov 2021
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JINDAL AVENUENA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

JINDAL AVENUE: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,319 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14335.17
Proposed, not sanctioned14,335 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchQUEEN NECKLACE SHOPPING,PLOT NO 1 PALM BEACH RD SEC 18 SANPDA NAVI MUMBAI 400705

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOSEVEN ASSOCIATES
EngineerYATEESH TARE
Chartered AccountantVALLABH JOSHI
PartnerRole in project
Jindal Builders and Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jul 2024

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Jindal Avenue Soc registration Certificate.pdf11 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 796 FY 23 24_compressed.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 796 FY 23 24_compressed.pdf10 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC CERT 796_240217_105754.pdf5 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 796.pdf5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 796 Q4 FY 23 24_compressed.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 796 Q4 FY 23 24_compressed.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jindal Avenue.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Jindal Avenue.pdf10 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Jindal Avenue.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 23 24 796_compressed.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 796 21 12 23 compressed.pdf10 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 796 Fy 23 24 Q3_compressed.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 796 Q2 FY 23 24_compressed.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 796 Q2 FY 23 24_compressed.pdf2 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 796 Q2 FY 23 24_compressed.pdf2 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Jindal Avenue Fy 22 23.pdf19 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 796 29 06 23_compressed.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 796 30 06 23_compressed.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: 796 Sold Unsold 300623_compressed.pdf11 Jul 2023
Layout approvalFile: Approved Layout _1_compressed (1).pdf5 Jul 2023
Copy of Layout Approval (in case of layout)File: Approved Layout _1_compressed (1).pdf5 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf5 Jul 2023
Declaration about Commencement CertificateFile: Adobe Scan Jun 15, 2023 (1).pdf5 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 796 290623_compressed.pdf5 Jul 2023
Disclosure of sold/ booked inventoryFile: Circular 29.pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 796 31 12 2021_11zon.pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 796 31 03 2022_11zon.pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 796 30 06 2022_11zon.pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 796 30 09 2022_11zon.pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 796 31 12 2022_11zon.pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 12-Jun-2023_11zon.pdf5 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 796.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 796 Form 1 060423.pdf8 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 796 Form 2 06 04 23.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certi 796.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: JBD 796 Form 5_compressed.pdf13 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: JBD 796 Form 5_compressed.pdf22 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JBD Form 1 (5 7 22)_compressed.pdf29 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JA Form 2(16 7 22)_compressed.pdf29 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Jindal Avenue Form -2A.pdf16 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JBD Akurli.pdf6 Jan 2022
Layout approvalFile: 796 Layout Plan.pdf22 Nov 2021
Building plan approvalFile: Sanction PLan C Wing.pdf22 Nov 2021
Building plan approvalFile: Plan.pdf22 Nov 2021
Copy of the legal title reportFile: Legal Title Report_compressed.pdf22 Nov 2021
Details of encumbrancesFile: Letter 796.pdf22 Nov 2021
Copy of Layout Approval (in case of layout)File: 796 Layout Plan.pdf22 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanction PLan C Wing.pdf22 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf22 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: S no 796 CC_compressed.pdf22 Nov 2021
Declaration about Commencement CertificateFile: Declaration about CC.pdf22 Nov 2021
Declaration in FORM BFile: Form B_compressed.pdf22 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf22 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Certificate RCC_compressed.pdf22 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certi 796_compressed.pdf22 Nov 2021
Proforma of Allotment letterFile: Agg draft.pdf22 Nov 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Jindal LegacyP52000054929Sai Nagar, Raigarh189Feb 2024Certificate SignedMar 2027Jan 1970
Jindal ImperiaP52000053510Kasbe, Raigarh133Nov 2023Certificate SignedMar 2027Jan 1970
Jindal EnclaveP52000054516Kasbe, Raigarh153Jan 2024Certificate SignedMar 2027Jan 1970

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jindal Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

2 kmJindal AvenueCompleted 173Lapsed / revoked 62Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 389 registered projects within 2 km.

Builder: Jindal Builders and Developers

Jindal Builders and Developers has 7 registrations on MahaRERA, including JINDAL RESIDENCY and Sakasi Park III. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Jindal Avenue is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jindal Avenue?

The registered promoter entity is Jindal Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jindal Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jindal Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jindal Avenue?

The professionals named in the filing: Architect: OSEVEN ASSOCIATES; Engineer: YATEESH TARE; Chartered Accountant: VALLABH JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jindal Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jindal Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jindal Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.