ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Jhamtani SpaceBiz

Registered No litigation declared Commercial project

Jhamtani SpaceBiz

By JHAMTANI REALTY PRIVATE LIMITED

RG-MH-93719 · RERA P52100054460 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 50.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
18 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Jhamtani SpaceBiz is a Commercial project by JHAMTANI REALTY PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100054460 on 25 Jan 2024. Possession is promised by 31 Dec 2027. 8 of the 26 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameJhamtani SpaceBiz
  • TypeCommercial
  • Location
    • Baner Road
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054460
  • ReraGenie IDRG-MH-93719

Builder

  • NameJHAMTANI REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70200PN2018PTC176558
  • GSTIN27AAECJ2550P1Z7
  • DirectorsANUP PARMANAND JHAMTANI, PARMANAND MELHUMAL JHAMTANI, ANUP PARMANAND JHAMTANI, DAYAL SHYAMLAL JESWANI, ANUP PARMANAND JHAMTANI, DAYAL SHYAMLAL JESWANI, ANUP PARMANAND JHAMTANI, DAYAL SHYAMLAL JESWANI, ANUP PARMANAND JHAMTANI, DAYAL SHYAMLAL JESWANI, ANUP PARMANAND JHAMTANI, DAYAL SHYAMLAL JESWANI
  • DirectorDAYAL SHYAMLAL JESWANI
  • Other registrations12 more →
  • Completed5 of 13
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed117 files

Current status

31%8 of 26 units booked
31.2%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Jhamtani SpaceBizNA352602626

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Jhamtani SpaceBiz: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed714

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots714
Closed/Covered714

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,850 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
M/s. Space RealtyPune (M Corp.)Pune
Laxman V Murkute & family through M/s Space RealtyPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI19372.89
Proposed, not sanctioned19,373 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSurvey No 207/2/1/4A/1, Kaspate Wasti , Fortune Business Center, Pune Maharashtra 411057
Estimated costRs 75.46 cr
Cost incurredRs 23.57 cr
Work done31.24%
BuildingWingEstimatedIncurred
Jhamtani SpaceBizNARs 66.82 crRs 21.45 cr
-NARs 8.63 crRs 2.12 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSankalp Designers
EngineerPRANAV SHANTARAM PATIL
EngineerNARENDRA GOSAVI
Chartered AccountantRavi Talreja and Associates
PartnerRole in project
JHAMTANI REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Spacebiz Form-1.pdf22 Apr 2026
Withdrawal Update Form 2File: Jhamtani Spacebiz Form-2.pdf22 Apr 2026
Withdrawal Update Form 3File: Jhamtani Spacebiz Form-3 Q4 25-26.pdf22 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A Spacebiz.pdf30 Jan 2026
Building plan approvalFile: Plan 1 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 2 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 3 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 4 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 5 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 6 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 7 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 8 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 9 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 10 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 11 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 12 of 13.pdf29 Jan 2026
Building plan approvalFile: Plan 13 of 13.pdf29 Jan 2026
Withdrawal Update Form 1File: Spacebiz Form 1 Q3 25-26.pdf20 Jan 2026
Withdrawal Update Form 2File: Spacebiz Form 2 Q3 25-26.pdf20 Jan 2026
Withdrawal Update Form 3File: JHAMTANI SPACEBIZ FORM 3 Q3.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: JHAMTANI SPACEBIZ FORM5 2024-25.pdf19 Jan 2026
Withdrawal Update Form 1File: Spacebiz Form 1.pdf19 Oct 2025
Withdrawal Update Form 2File: SpaceBiz.pdf19 Oct 2025
Withdrawal Update Form 3File: JHAMTANI SPACEBIZ FORM3 Q2.pdf19 Oct 2025
Withdrawal Update Form 1File: Jhamtani Spacebiz.pdf21 Jul 2025
Withdrawal Update Form 1File: Jhamtani Spacebiz.pdf21 Jul 2025
Withdrawal Update Form 2File: Jhamtani Spacebiz Form 2.pdf21 Jul 2025
Withdrawal Update Form 2File: Jhamtani Spacebiz Form 2.pdf21 Jul 2025
Withdrawal Update Form 3File: Jhamtani Spacebiz Form 3.pdf21 Jul 2025
Withdrawal Update Form 3File: Jhamtani Spacebiz Form 3.pdf21 Jul 2025
Withdrawal Update Form 1File: Jhamtani Spacebiz.pdf20 Jul 2025
Withdrawal Update Form 2File: Jhamtani Spacebiz Form 2.pdf20 Jul 2025
Withdrawal Update Form 3File: Jhamtani Spacebiz Form 3.pdf20 Jul 2025
Form 1File: Jhamtani SpaceBiz.pdf15 Jul 2025
Form 2File: Jhamtani SpaceBiz.pdf15 Jul 2025
Form 3File: Jhamtani Spacebiz Form 3.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: 9) Jhamtani Spacebiz.pdf15 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jhamtani SpaceBiz.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jhamtani Spacebiz Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jhamtani SpaceBiz.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 9) Jhamtani Spacebiz.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JHAMTANI SPACEBIZ.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Jhamtani SpaceBiz.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JHAMTANI SPACEBIZ.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHAMTANI SPACEBIZ FORM 3 Q3 2425.pdf17 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SPACEBIZ FORM 5 2023-24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jhamtani SpaceBiz.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHAMTANI SPACEBIZ.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JHAMTANI SPACEBIZ.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Jhamtani SpaceBiz.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: JHAMTANI SPACEBIZ (2).pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jhamtani Spacebiz.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JHAMTANI SPACEBIZ.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHAMTANI SPACEBIZ.pdf15 Jul 2024
Building plan approvalFile: avi002.pdf12 Jun 2024
Building plan approvalFile: avi003.pdf12 Jun 2024
Building plan approvalFile: avi004.pdf12 Jun 2024
Building plan approvalFile: avi005.pdf12 Jun 2024
Building plan approvalFile: avi006.pdf12 Jun 2024
Building plan approvalFile: avi007.pdf12 Jun 2024
Building plan approvalFile: avi008.pdf12 Jun 2024
Building plan approvalFile: avi009.pdf12 Jun 2024
Building plan approvalFile: avi010.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: avi002.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: avi003.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: avi004.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: avi005.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: avi006.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: avi007.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: avi008.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: avi009.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: avi010.pdf12 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Jhamtani SpaceBiz.pdf24 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 001124 010424.pdf29 Apr 2024
Layout approvalFile: SpaceBiz Revised Sanction 1042024.pdf26 Apr 2024
Building plan approvalFile: SpaceBiz Revised Sanction 1042024.pdf26 Apr 2024
Copy of Layout Approval (in case of layout)File: SpaceBiz Revised Sanction 1042024.pdf26 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: SpaceBiz Revised Sanction 1042024.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPECEBIZ.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: spacebiz.pdf20 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ACE AURUM III TOWER 01SURVEY NO 45 HISSA NO 1 OF 1 RAVET28CompletedDec 2024Apr 2024

How this compares with Pune

31%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jhamtani SpaceBiz on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

2 kmJhamtani SpaceBizCompleted 70Lapsed / revoked 25Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 196 registered projects within 2 km.

Builder: JHAMTANI REALTY PRIVATE LIMITED

JHAMTANI REALTY PRIVATE LIMITED has 13 registrations on MahaRERA, including ACE AURUM III TOWER 04 and ACE AURUM III TOWER 05. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Jhamtani SpaceBiz is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jhamtani SpaceBiz?

The registered promoter entity is JHAMTANI REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70200PN2018PTC176558 and GSTIN 27AAECJ2550P1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jhamtani SpaceBiz?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jhamtani SpaceBiz?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jhamtani SpaceBiz?

The professionals named in the filing: Architect: Sankalp Designers; Engineer: PRANAV SHANTARAM PATIL; Engineer: NARENDRA GOSAVI; Chartered Accountant: Ravi Talreja and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jhamtani SpaceBiz?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jhamtani SpaceBiz. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jhamtani SpaceBiz to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.