Home / Browse projects / Thane, Maharashtra / jewel heights

Registration lapsed No litigation declared Residential / Group Housing project

jewel heights

By Jewel Builders and Infraprojects Ltd

RG-MH-42537 · RERA P51700016400 · Last updated on MahaRERA portal: 24 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
37 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

jewel heights is a Residential / Group Housing project by Jewel Builders and Infraprojects Ltd in Thane, Maharashtra, registered with MahaRERA as P51700016400 on 10 May 2018. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • Namejewel heights
  • TypeResidential / Group Housing
  • Location
    • sonivali eranjad road
    • sonivali village
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700016400
  • ReraGenie IDRG-MH-42537

Builder

  • NameJewel Builders and Infraprojects Ltd
  • Entity typeCompany
  • Managing DirectorJairaj Hiranand Kalyani
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

34 months past promisethis monthRegisteredMay 2018PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 May 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA70000
Building no 2NA150000
BUILDING NO 3NA120000
BUILDING NO 4NA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

37 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

Building 182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building no 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed334

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots334
Open Space334
BuildingOpen SpaceTotal
Building 12424
Building no 2100100
BUILDING NO 3100100
BUILDING NO 4110110

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,285 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15024.0
Proposed, not sanctioned11,024 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchULHASNAGAR-421002 ,FURNITURE BAZAR

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Jewel Builders and Infraprojects Ltd-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602468Jewel Builders and Infraprojects LtdMr Bhola Murli Gupta and Mrs Manisha Bhola Gupta27/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 May 2018
  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Dec 2023

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: JEWEL HEIGHTS RERA REPORT SIGNED.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: JEWEL HEIGHTS RERA AUDIT FY 22-23.pdf7 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BLDG 1 2 OC.pdf7 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc tower 1 shops.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CERTIFICATE 20022023.pdf1 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: jpg2pdf.pdf1 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HEIGHTS BLDG 4.pdf1 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: heights bldg 3.pdf1 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Heights form 5.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: heights.pdf20 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Jewel Heights 19-20.pdf22 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FINAL Form 5 RERA Certificate Signed.pdf31 Dec 2019
Details of encumbrancesFile: no encum-20180504152230.pdf4 May 2018
Declaration in FORM BFile: Form B plot 2-20180504174342.pdf4 May 2018
Certificates of CA (Form 3)File: plot 2 CA cert-20180504152140-ilovepdf-compressed.pdf4 May 2018
Building plan approvalFile: iod 1-20180501215147.pdf1 May 2018
Building plan approvalFile: iod 2-20180501215116.pdf1 May 2018
Building plan approvalFile: iod 3-20180501215057.pdf1 May 2018
Building plan approvalFile: iod 4-20180501215027.pdf1 May 2018
Building plan approvalFile: iod 5-20180501214953.pdf1 May 2018
Building plan approvalFile: iod 6-20180501214927.pdf1 May 2018
Building plan approvalFile: iod 7-20180501214827.pdf1 May 2018
Building plan approvalFile: iod 8-20180501214805.pdf1 May 2018
Copy of the legal title reportFile: 25 1A-20180501214703.pdf1 May 2018
Copy of the legal title reportFile: 25 1B-20180501214639.pdf1 May 2018
Copy of the legal title reportFile: 25 2-20180501214508.pdf1 May 2018
Copy of the legal title reportFile: 67 3 A-20180501214445.pdf1 May 2018
Copy of the legal title reportFile: 67 3B-20180501214420.pdf1 May 2018
Copy of the legal title reportFile: 25 3-20180501214349.pdf1 May 2018
Copy of the legal title reportFile: 67 4-20180501214259.pdf1 May 2018
Building Plan Approval (IOD)File: iod 1-20180501215147.pdf1 May 2018
Building Plan Approval (IOD)File: iod 2-20180501215116.pdf1 May 2018
Building Plan Approval (IOD)File: iod 3-20180501215057.pdf1 May 2018
Building Plan Approval (IOD)File: iod 4-20180501215027.pdf1 May 2018
Building Plan Approval (IOD)File: iod 5-20180501214953.pdf1 May 2018
Building Plan Approval (IOD)File: iod 6-20180501214927.pdf1 May 2018
Building Plan Approval (IOD)File: iod 7-20180501214827.pdf1 May 2018
Building Plan Approval (IOD)File: iod 8-20180501214805.pdf1 May 2018
Commencement Certificates / NA Order for plotted developmentFile: CC plot no 2-20180501215256.pdf1 May 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
jewel ekvirajewel ekvira near satyam heritage sector 10 kopra kharghar navi mumbai52CompletedJul 2016Jul 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep jewel heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near sonivali village7,600+ in Thane

2 kmjewel heightsCompleted 33Lapsed / revoked 7Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 60 registered projects within 2 km.

Builder: Jewel Builders and Infraprojects Ltd

Jewel Builders and Infraprojects Ltd has 5 registrations on MahaRERA, including jewel heaven phase 1 and jewel heights. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that jewel heights shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if jewel heights is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of jewel heights?

The registered promoter entity is Jewel Builders and Infraprojects Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in jewel heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against jewel heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for jewel heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in jewel heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About jewel heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save jewel heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.