Home / Browse projects / Pune, Maharashtra / JAYANT RESIDENCY
JAYANT RESIDENCY
RG-MH-46471 · RERA P52100021468 · Last updated on MahaRERA portal: 6 Jul 2023
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
JAYANT RESIDENCY is a Mixed project by INDRASEN JAYANT KAKADE in Pune, Maharashtra, registered with MahaRERA as P52100021468 on 5 Jul 2019. The registration is recorded completed; possession was promised by 30 Jun 2021. 11 of the 11 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameJAYANT RESIDENCY
- TypeMixed
- Location
- HINGANE ALLI
- NEAR SAI BABA MANDIR
- Hadapsar
- Haveli
- Pune
- 411028
- Pincode411028
- RERA no.P52100021468
- ReraGenie IDRG-MH-46471
Builder
- NameINDRASEN JAYANT KAKADE
- Entity typeIndividual
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Jul 2019
- Promised completion30 Jun 2021
- Revised completionNone
- Buildings1 building record
- Documents filed26 files
Current status
Figures as on 6 Jul 2023, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| JAYANT RESIDENCY | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete across 2 buildings.
JAYANT RESIDENCY100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 6 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed7
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership52
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| IJK CONSTRUCTIONS | Hadapsar | Pune |
| SITABAI BABURAO TUPE | Hadapsar | Pune |
| PANDURANG BABURAO TUPE | Hadapsar | Pune |
| MANGAL PANDURANG TUPE | Hadapsar | Pune |
| PUJA NAVNATH HARPALE | Fursungi | Pune |
| MADHURI HARESHWAR KHENAT | - | Pune |
| TEJSHREE NILESH LONDHE | Hadapsar | Pune |
| VISHAL PANDURANG TUPE | Hadapsar | Pune |
| NIRMALA DATTATRAYA JADHAV | Katraj | Pune |
| DATTATRAY BABAN JADHAV | Katraj | Pune |
| HARSHAL DATTATRAY JADHAV | Katraj | Pune |
| MONALI HARSHAL JADHAV | Katraj | Pune |
| ATISH DATTATRAYA JADHAV | Katraj | Pune |
| ASHWINI ATISH JADHAV | Katraj | Pune |
| CHAITRALI BHARAT KASPATE | Wakad | Pune |
| PANDURANG DAGDU TUPE | Hadapsar | Pune |
| SAVITA PANDURANG TUPE | Hadapsar | Pune |
| PRASAD PANDURANG TUPE | Hadapsar | Pune |
| MONIKA PRASAD TUPE | Hadapsar | Pune |
| YAHWANT PANDURANG TUPE | Hadapsar | Pune |
| ASHWINI YASHWANT TUPE | Hadapsar | Pune |
| AKSHAY PANDURANG TUPE | Hadapsar | Pune |
| SHRIKANT PANDURANG TUPE | Hadapsar | Pune |
| SOMNATH DAGDUE TUPE | Hadapsar | Pune |
| SUVARNA SOMNATH TUPE | Hadapsar | Pune |
| ABHISHEK SOMNATH TUPE | Hadapsar | Pune |
| HIRABAI NARAYAN TUPE | Hadapsar | Pune |
| ROHINI KAILASH POKLE | Dhayari (Part) | Pune |
| JAYSHREE KHATAPE | Hadapsar | Pune |
| RATAN HARIBHAU TUPE | Hadapsar | Pune |
| KANTABAI RATAN MANE | Hadapsar | Pune |
| DINESH RATAN TUPE | Hadapsar | Pune |
| MONALI DINESH TUPE | Hadapsar | Pune |
| GANESH RATAN TUPE | Hadapsar | Pune |
| RUPALI GANESH TUPE ALIAS RUPALI SHRIKANT PANSARE | Hadapsar | Pune |
| MANDHAR RATAN TUPE | Hadapsar | Pune |
| PUJA MANDHAR TUPE ALIAS PUJA YASHWANT SHINDE | Hadapsar | Pune |
| CHANDRAKANT HARIBHAU TUPE | Hadapsar | Pune |
| VIMAL CHANDRAKANT TUPE | Hadapsar | Pune |
| YOGESH CHANDRAKANT TUPE | Hadapsar | Pune |
| VAISHALI YOGESH TUPE | Hadapsar | Pune |
| RUSHIKESH CHANDRAKANT TUPE | Hadapsar | Pune |
| ASHA LAKSHAMAN TUPE | Hadapsar | Pune |
| AJIT LAKSHAMAN TUPE | Fursungi | Pune |
| BHUSHAN LAKSHAMAN TUPE | Fursungi | Pune |
| BEBY SURESH TUPE | Fursungi | Pune |
| RAJESH SURESH TUPE | Hadapsar | Pune |
| SHUBHASH DATTATRAY SHEJWAL | Hadapsar | Pune |
| UTTAM MARUTI KAMTHE | Hadapsar | Pune |
| PRAKASH MARUTI KAMTHE | Hadapsar | Pune |
| HIRAMAN MARUTI KAMTHE | Hadapsar | Pune |
| BALASO /BALASAHEB MARUTI KAMTHE | Hadapsar | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NAVINYA DESIGNERS |
| Engineer | AXIS CONSULTANTS |
| Partner | Role in project |
|---|---|
| INDRASEN JAYANT KAKADE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs due to Covid 19 Pandemic all workers had relocated and there has been shortage of material due to closure of shop on account of COVID 19 pandemic hence extension is required.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Feb 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Feb 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Jul 2023
Documents filed26
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPANCY CERTIFICATE.pdf | 6 Jul 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf | 6 Jul 2023 |
| Layout approvalFile: REVISED DRAWING 1.pdf | 2 Dec 2020 |
| Layout approvalFile: REVISED DRAWING2.pdf | 2 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: REVISED DRAWING 1.pdf | 2 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: REVISED DRAWING2.pdf | 2 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED PERMISSION.pdf | 2 Dec 2020 |
| Details of Restarting of Construction work post lockdownFile: DECLARATION POST LOCKDOWN.pdf | 2 Sep 2020 |
| Proforma of Allotment letterFile: AGREEMENT.pdf | 28 Sep 2019 |
| Layout approvalFile: 2.pdf | 31 May 2019 |
| Layout approvalFile: 3.pdf | 31 May 2019 |
| Layout approvalFile: 1.pdf | 31 May 2019 |
| Copy of Layout Approval (in case of layout)File: 2.pdf | 31 May 2019 |
| Copy of Layout Approval (in case of layout)File: 3.pdf | 31 May 2019 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 31 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEW.pdf | 23 May 2019 |
| Details of encumbrancesFile: jpg2pdf.pdf | 22 May 2019 |
| Certificates of CA (Form 3)File: CA CERTI.pdf | 22 May 2019 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 22 May 2019 |
| Copy of the legal title reportFile: LEGAL 2.pdf | 22 Feb 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: NEW.pdf | 22 Feb 2019 |
| Building plan approval or NA orderFile: jpg2pdf.pdf | 21 Feb 2019 |
| Building Plan Approval (IOD)File: jpg2pdf.pdf | 21 Feb 2019 |
| PAN CardFile: jpg2pdf (1).pdf | 19 Feb 2019 |
| Declaration in FORM BFile: DECLARATION IN FORM B.pdf | 19 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: jpg2pdf.pdf | 19 Feb 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 26 filed documents as one ZIP, foldered, with a manifest
Keep JAYANT RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR SAI BABA MANDIR13,700+ in Pune
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: INDRASEN JAYANT KAKADE
INDRASEN JAYANT KAKADE has 2 registrations on MahaRERA, including JAYANT RESIDENCY and JAYANT EMPORIUM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if JAYANT RESIDENCY is delayed beyond 30 Jun 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of JAYANT RESIDENCY?
The registered promoter entity is INDRASEN JAYANT KAKADE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in JAYANT RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for JAYANT RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at JAYANT RESIDENCY?
The professionals named in the filing: Architect: NAVINYA DESIGNERS; Engineer: AXIS CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JAYANT RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback