Registered No litigation declared Residential / Group Housing project

JAY VITTHAL COMPLEX 1

By OM CIVIL CONSTRUCTIONS

RG-MH-23221 · RERA P52000078326 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
44 of 66Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

JAY VITTHAL COMPLEX 1 is a Residential / Group Housing project by OM CIVIL CONSTRUCTIONS in Raigarh, Maharashtra, registered with MahaRERA as P52000078326 on 4 Dec 2024. Possession is promised by 31 Dec 2028. 22 of the 66 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameJAY VITTHAL COMPLEX 1
  • TypeResidential / Group Housing
  • Location
    • PLOT NO I-4-283 SECTOR 03 PUSHPAK NODE DAPOLI PANVEL
    • DAPOLI
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000078326
  • ReraGenie IDRG-MH-23221

Builder

  • NameOM CIVIL CONSTRUCTIONS
  • Entity typeOthers
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredDec 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed60 files

Current status

33%22 of 66 units booked
56.7%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA6018018
A WINGNA77341448

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

B WING46%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A WING46%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed59

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots59
Closed/Covered34
Open Space25
BuildingClosed/CoveredOpen SpaceTotal
B WING141024
A WING201535

Land and ownership10

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,140 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Sep 2025
LandownerVillageDistrict
RAJESH GANGARAM JITEKARDapoliRaigarh
SANTOSH GANGARAM JITEKARDapoliRaigarh
RAMESH GANGARAM JITEKARDapoliRaigarh
PARSHURAM GANGARAM JITEKARDapoliRaigarh
JWALA JANARDAN JITEKARDapoliRaigarh
JITENDRA JANARDAN JITEKARDapoliRaigarh
KUNDA JANARDAN JITEKARDapoliRaigarh
SURENDRA JANARDAN JITEKARDapoliRaigarh
KANCHAN SUNIL MHATREDapoliRaigarh
SUVARNA JANARDAN JITEKARDapoliRaigarh

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI3658.43
Proposed, not sanctioned3,657 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 14/15, AKHURATH,CHS,MUMBAI
Estimated costRs 9.00 cr
Cost incurredRs 5.10 cr
Work done56.67%
BuildingWingEstimatedIncurred
B WINGNARs 4.25 crRs 2.55 cr
A WINGNARs 4.25 crRs 2.55 cr
-NARs 50.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHEMANT P DHAVALE
EngineerSTRUCON CONSULTING ENGINEERS
Chartered AccountantROHIT KISAN MADANE
PartnerRole in project
OM CIVIL CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 SECTOR 03 PUSHPAK DECEMBER-25.pdf30 Jun 2026
Withdrawal Update Form 1File: FORM 1 JAY VITTHAL COMPLEX 1 MARCH 2026.pdf30 Jun 2026
Withdrawal Update Form 2File: 283-3 P4 FORM 2 (DECEMBER 2025).pdf30 Jun 2026
Withdrawal Update Form 2File: Jay Vitthal Complex 1 Form 2 March 26.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 JAY VITTHAL COMPLEX 1.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 March 26 JAY VITTHAL 1.pdf30 Jun 2026
Withdrawal Update Form 1File: FORM 1 SEPT 2025 - Jay Vitthal Complex 1.pdf27 Nov 2025
Withdrawal Update Form 2File: 283-3 P2 FORM-2 ( Sept-2025 ).pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 SEPT 2025 JAY VITTHAL COMPLEX 1.pdf27 Nov 2025
Form 1File: Form 1 SECTOR 03 PUSHPAK MARCH-25.pdf8 Sep 2025
Form 2File: 283-3 P1 FORM -2 ( MARCH-2025 ).pdf8 Sep 2025
Form 3File: Form 3 March 2025_Final.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure - March 2025.pdf8 Sep 2025
Withdrawal Update Form 1File: FORM 1 JAY VITTHAL COMPLEX 1 SECTOR 03 PUSHPAK JUN-25.pdf8 Sep 2025
Withdrawal Update Form 2File: 283-3 P2 FORM-2 ( JUN-2025 ).pdf8 Sep 2025
Withdrawal Update Form 3File: Form 3 JUNE 2025_PORTAL GENRATED.pdf8 Sep 2025
Form 1File: FORM 1 JAY VITTHAL COMPLEX 1 DEC 2024.pdf5 Sep 2025
Form 2File: 283-3 P FORM-2 ( DEC-2024 ).pdf5 Sep 2025
Form 3File: Form 3 Dec 24_1.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure - Dec 2024.pdf5 Sep 2025
Other - TechnicalFile: anex A order 50.pdf29 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: DESCLOSER FINANCE.pdf28 Nov 2024
Details of encumbrances concerned to FinanceFile: DESCLOSER FINANCE.pdf26 Nov 2024
Details of encumbrances concerned to LegalFile: DESCLOSER FINANCE.pdf26 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FARMAT B.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 jay vitthal.pdf21 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf21 Nov 2024
Other - FinanceFile: DECLERATION PRO FROM 3.pdf21 Nov 2024
Other - FinanceFile: ENCOM FINANCE.pdf21 Nov 2024
Other - FinanceFile: decleration owner for OC jay vitthal.pdf21 Nov 2024
Other - FinanceFile: DESCLOSER FINANCE.pdf21 Nov 2024
Details of encumbrances concerned to FinanceFile: ENCMB LEGAL.pdf14 Nov 2024
Details of encumbrances concerned to LegalFile: ENCMB LEGAL.pdf14 Nov 2024
Other - FinanceFile: decleration owner for OC jay vitthal.pdf14 Nov 2024
Other - FinanceFile: ENCOM FINANCE.pdf14 Nov 2024
Copy of the legal title reportFile: TITIELS.pdf29 Oct 2024
Other - TechnicalFile: decleration owner for OC jay vitthal.pdf29 Oct 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (1).pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2.pdf21 Oct 2024
Building plan approvalFile: PLAN COPY.pdf20 Oct 2024
Layout approvalFile: PLAN COPY.pdf20 Oct 2024
PAN CardFile: adhar nagesh survashe.pdf20 Oct 2024
Details of encumbrances concerned to FinanceFile: encombuniens finance.pdf20 Oct 2024
Copy of Layout Approval (in case of layout)File: PLAN COPY.pdf20 Oct 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf20 Oct 2024
Declaration in FORM BFile: from B promoter.pdf20 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf20 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY.pdf20 Oct 2024
Other - LegalFile: lease 283.pdf20 Oct 2024
Other - LegalFile: TRIPARTY AGREEMENT 283.pdf20 Oct 2024
Other - LegalFile: DEVELOPMENT AGREEMENT.pdf20 Oct 2024
Other - LegalFile: POA BUILDER 283_compressed.pdf20 Oct 2024
Declaration about Commencement CertificateFile: Declaration about COMMENCENT certificate FORMAT D.pdf20 Oct 2024
CERSAI detailsFile: cersai Declaration For the Project.pdf20 Oct 2024
Deviation Report with respect to Allotment letterFile: A L 1.pdf20 Oct 2024
Details of encumbrances concerned to LegalFile: encombuniens finance.pdf20 Oct 2024
Deviation Report with respect to model copy of AgreementFile: A F S 1.pdf20 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of Interest Other Real Estate Orga.pdf20 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: encombuniens finance.pdf20 Oct 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
JAY VITTHAL COMPLEXPLOT NO 299 SECTOR 1 PUSHPAK NODE VADGHAR PANVEL 4102061CompletedJan 2022Jan 2022
JAY VITTHAL COMPLEXPLOT NO 299 SECTOR 1 PUSHPAK NODE VADGHAR PANVEL 4102061CompletedJan 2022Jan 2022
UBHA VITHEVARIPLOT NO 97 SECTOR R3 PUSHPAK NODE VADGHAR PANVEL 4102061CompletedOct 2021Aug 2021
RUKHMAI COMPLEXPLOT NO 86C SECTOR R3 PUSHPAK NODE VADGHAR PANVEL 4102061CompletedJan 2021Jan 2021

How this compares with Raigarh

33%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAY VITTHAL COMPLEX 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAPOLI5,900+ in Raigarh

2 kmJAY VITTHAL COMPLEX 1Completed 8Lapsed / revoked 11Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 124 registered projects within 2 km.

Builder: OM CIVIL CONSTRUCTIONS

OM CIVIL CONSTRUCTIONS has 5 registrations on MahaRERA, including RUKHMINI COMPLEX and UBHA VITEVARI. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if JAY VITTHAL COMPLEX 1 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAY VITTHAL COMPLEX 1?

The registered promoter entity is OM CIVIL CONSTRUCTIONS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAY VITTHAL COMPLEX 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAY VITTHAL COMPLEX 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAY VITTHAL COMPLEX 1?

The professionals named in the filing: Architect: HEMANT P DHAVALE; Engineer: STRUCON CONSULTING ENGINEERS; Chartered Accountant: ROHIT KISAN MADANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAY VITTHAL COMPLEX 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAY VITTHAL COMPLEX 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAY VITTHAL COMPLEX 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.