ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / JAY GANESH DARSHAN CHSL

Registered No litigation declared Residential / Group Housing project

JAY GANESH DARSHAN CHSL

By YADAV BROS CONSTRUCTION

RG-MH-19236 · RERA P51700078315 · Last updated on MahaRERA portal: 21 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
46 of 46Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

JAY GANESH DARSHAN CHSL is a Residential / Group Housing project by YADAV BROS CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700078315 on 4 Dec 2024. Possession is promised by 31 Dec 2026. 0 of the 46 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameJAY GANESH DARSHAN CHSL
  • TypeResidential / Group Housing
  • Location
    • MORIVALI
    • AMBERNATH EAST
    • Ambarnath (R)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700078315
  • ReraGenie IDRG-MH-19236

Builder

  • NameYADAV BROS CONSTRUCTION
  • Entity typePartnership
  • GSTIN27AADFY4692D1ZX
  • PartnersCHANDRAPRAKSH LALCHAND YADAV, SUDHIR SHRINIWAS WAGLE, SURYAPRAKASH LALCHAND YADAV
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

0%0 of 46 units booked

Figures as on 21 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JAY GANESH DARSHAN CHSLNA8746046

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

JAY GANESH DARSHAN CHSL: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Open Space64

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area683 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Mar 2026
LandownerVillageDistrict
SAKHAHARI BALAJI JADHAVAmbarnath (R)Thane
JAY GANESH DARSHAN CHSLAmbarnath (R)Thane

Approvals and building plan

Sanctioning authorityAmbernath Municipal Council
Permissible FSI1959.42
Proposed, not sanctioned1,858 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 4 AND 5 PANVELKAR PRIDE OPP SITAI SADAN SAI SECTION STATION ROAD THANE MAHARASHTRA 421501

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrasad Garad
EngineerAtul Kudtarkar & Associates
Chartered AccountantAmrrita Jagnaani
PartnerRole in project
YADAV BROS CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1 dec .pdf21 Feb 2026
Form 2File: FORM 2.pdf21 Feb 2026
Form 3File: FORM 3.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD unsold.pdf21 Feb 2026
Form 1File: ARCHITECT 30-9-25.pdf6 Nov 2025
Form 2File: form 2 q3 JAI GANESH DARSHAN.pdf6 Nov 2025
Form 3File: Jai ganesh darshan 30-9-25.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: JAY GANESH DARSHAN SOLD UNSOLD.pdf6 Nov 2025
Form 1File: form 1 q1 2025.pdf28 Oct 2025
Form 2File: form 2 q 12025.pdf28 Oct 2025
Form 3File: form 3 .pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: JAY GANESH DARSHAN SOLD UNSOLD.pdf28 Oct 2025
Form 1File: quarter 4 FORM 1.pdf28 Oct 2025
Form 2File: form 2 4th quarter (4).pdf28 Oct 2025
Form 3File: form 3 jan to march 25.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: JAY GANESH DARSHAN SOLD UNSOLD.pdf28 Oct 2025
Form 1File: quarter 4 FORM 1.pdf28 Oct 2025
Form 2File: form 2 4th quarter (4).pdf28 Oct 2025
Form 3File: form 3 jan to march 25.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: JAY GANESH DARSHAN SOLD UNSOLD.pdf28 Oct 2025
Form 1File: ARCHITECT CERTIFICATE 31 12 24.pdf28 Oct 2025
Form 2File: ENGINEER CERTIFICATE 31 12 24.pdf28 Oct 2025
Form 3File: CA CERT 31 12 24.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: JAY GANESH DARSHAN SOLD UNSOLD.pdf28 Oct 2025
Form 1File: ARCHITECT CERTIFICATE 31 12 24.pdf28 Oct 2025
Form 2File: ENGINEER CERTIFICATE 31 12 24.pdf28 Oct 2025
Form 3File: CA CERT 31 12 24.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: JAY GANESH DARSHAN SOLD UNSOLD.pdf28 Oct 2025
Form 1File: ARCHITECT CERTIFICATE 31 12 24.pdf28 Oct 2025
Form 2File: ENGINEER CERTIFICATE 31 12 24.pdf28 Oct 2025
Form 3File: CA CERT 31 12 24.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: JAY GANESH DARSHAN SOLD UNSOLD.pdf28 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: quarter 4 signature (1).pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jai ganesh darshan.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 4th quarter (4).pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (30).pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (30).pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 3rd quarter (3).pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: yadav bros construction (6).pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 3rd quarter (3).pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: yadav bros construction (6).pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sign .pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sign .pdf31 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sign .pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sign .pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sign .pdf31 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sign .pdf31 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format B(1).pdf28 Nov 2024
CERSAI detailsFile: cersai.pdf27 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A and B.pdf27 Nov 2024
Other - FinanceFile: architecture letter for inventory clarification.pdf25 Nov 2024
Other - FinanceFile: self declaration - yadav bros.pdf22 Nov 2024
Details of encumbrances concerned to FinanceFile: output (12).pdf21 Nov 2024
Details of encumbrances concerned to LegalFile: output (12).pdf21 Nov 2024
Copy of the legal title reportFile: Yadav Bros Title Report.pdf13 Nov 2024
Proforma of Agreement for saleFile: RERA Draft AGREEMENT FOR SALE.pdf16 Oct 2024
Proforma of Allotment letterFile: allotment new.pdf15 Oct 2024
PAN CardFile: pan card.pdf14 Oct 2024
Other - TechnicalFile: order 50.pdf13 Aug 2024
Building plan approvalFile: 2024-6-24-19-4-47_rotated.pdf24 Jul 2024
Building plan approvalFile: BLUE PRINT GANESH DARSHAN (1)_11zon.pdf24 Jul 2024
Layout approvalFile: 2024-6-10-18-22-0 (2) (1)_11zon.pdf24 Jul 2024
Copy of Layout Approval (in case of layout)File: 2024-6-10-18-22-0 (2) (1)_11zon.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ganesh darshan (1).pdf24 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT GANESH DARSHAN (1)_11zon.pdf24 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 2024-6-24-19-4-47_rotated.pdf24 Jul 2024
Deviation Report with respect to Allotment letterFile: comparison.pdf24 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: ilovepdf_merged (12).pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 rera.pdf29 Jun 2024
Other - FinanceFile: clarification .pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: sp sir_merged.pdf25 Jun 2024
Details of encumbrances concerned to FinanceFile: output (5).pdf24 Jun 2024
Declaration in FORM BFile: company notary (1) (1).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1(1) (1).pdf24 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: cc ganesh darshan.pdf24 Jun 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf24 Jun 2024
Details of encumbrances concerned to LegalFile: output (5).pdf24 Jun 2024
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION IN AFS.pdf24 Jun 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAY GANESH DARSHAN CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBERNATH EAST7,600+ in Thane

2 kmJAY GANESH DARSHAN CHSLCompleted 84Lapsed / revoked 36Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 174 registered projects within 2 km.

Builder: YADAV BROS CONSTRUCTION

Yadav Bros Construction has 5 registrations on MahaRERA, including Kailash Darshan CHS LTD and MUKTAI MAULI CHS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JAY GANESH DARSHAN CHSL is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAY GANESH DARSHAN CHSL?

The registered promoter entity is YADAV BROS CONSTRUCTION, a partnership as per the filing. Its GSTIN 27AADFY4692D1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAY GANESH DARSHAN CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAY GANESH DARSHAN CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAY GANESH DARSHAN CHSL?

The professionals named in the filing: Architect: Prasad Garad; Engineer: Atul Kudtarkar & Associates; Chartered Accountant: Amrrita Jagnaani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAY GANESH DARSHAN CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAY GANESH DARSHAN CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAY GANESH DARSHAN CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.