Jangid Annexe

By Jangid Home pvt Ltd

RG-MH-26383 · RERA P51800008642 · Last updated on MahaRERA portal: 11 Oct 2021

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date
  • 26 complaints at MahaRERA
  • Completion date moved by 66 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 25%
26Complaints at MahaRERAon this registration
Jump to the 25 documents Report an error

Jangid Annexe is a Commercial project by Jangid Home pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008642 on 19 Aug 2017. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 66 months from the original filing. 26 complaints are on record with the regulator.

At a glance

Project

  • NameJangid Annexe
  • TypeCommercial
  • Location
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008642
  • ReraGenie IDRG-MH-26383

Builder

  • NameJangid Home pvt Ltd
  • Entity typeCompany
  • Managing DirectorOmprakash L Jangid
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

28 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed25 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Jangid AnnexeNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Oct 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 25%.

Jangid Annexe: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Oct 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Open Space35

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,479 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7008.07
Proposed, not sanctioned1,608 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMira Bhayander Road, Mira Road East

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtharva Consultants
EngineerDesai And Associates
PartnerRole in project
Jangid Home pvt Ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800008678Dec 2018 → Dec 2023

Reason as filed by the promoterThe project is registered as “JANGID ANNEXE” vide Registration Number P51800008642 and the end date of the said project as per MahaRERA Registration is 30/12/2019. 2. Due to various reasons which were beyond the control of the “Promoter/Developer” the various approvals from competent authorities got delayed and the end date as per MahaRERA expired. 3. We were timely informed about various reasons for the delay and we are well informed about the progress of the project. 4. The new end date proposed by “Promoter/Developer” for completion of the project is 31 st December 2023. We are told that “P

EXT51800001881Dec 2018 → Dec 2019

Reason as filed by the promoterScarcity of Material & Funds

Complaints filed with MahaRERA26

Case no.ComplainantRespondentFiled
CC006000000054954Durgavati Sabhajeet YadavJangid Homes Pvt Ltd15/06/2018
CC12400218Anil Ganesh PatelJangid Home pvt Ltd24/09/2024
CC12400217Gangji Devji GajoraJangid Home pvt Ltd24/09/2024
CC12400216Kapil Bhawanji PatelJangid Home pvt Ltd24/09/2024
CC12400215Dilip Devraj PatelJangid Home pvt Ltd24/09/2024
CC12400214Ramesh Haribhai RavariyaJangid Home pvt Ltd24/09/2024
CC12400309Ramesh Ganesh VaviyaJangid Home pvt Ltd02/10/2024
CC12400425Navin Jivraj VaviyaJangid Home pvt Ltd16/10/2024
CC12400258Dimple Jagdish ChaudhariJangid Home pvt Ltd28/09/2024
CC12400307Govind kesha GamiJangid Home pvt Ltd02/10/2024
CC12400308Gautam Kishin PunjabiJangid Home pvt Ltd02/10/2024
CC12400361Nayna Kapil PatelJangid Home pvt Ltd07/10/2024
CC12400360premilaben Ramesh VaviyaJangid Home pvt Ltd07/10/2024
CC12400408Nikunj Ambalal PatelJangid Home pvt Ltd14/10/2024
CC12400433Bhavesh Ambalal PatelJangid Home pvt Ltd16/10/2024
CC12400440Nikunj Ambalal PatelJangid Home pvt Ltd17/10/2024
CC12400431Diwaliben Ambalal PatelJangid Home pvt Ltd16/10/2024
CC12400466Nikunj Ambalal PatelJangid Home pvt Ltd19/10/2024
CC12503738Naina Ganesh RavariyaJangid Home pvt Ltd24/10/2025
CC12504061Ramji Mala ChamariyaJangid Home pvt Ltd18/11/2025
CC12504062VIKAS V DEORAJangid Home pvt Ltd18/11/2025
CC12504081Harilal Devraj DubariaJangid Home pvt Ltd19/11/2025
CC12504079Ramji Mala ChamariyaJangid Home pvt Ltd19/11/2025
CC12504083Dhanji Mala ChamariyaJangid Home pvt Ltd19/11/2025
CC12504082Rajesh Arunkumar RungtaJangid Home pvt Ltd19/11/2025
CC12504088NARSHI DEVJI PATELJangid Home pvt Ltd19/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed25

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: JHPL_Annexe- Form 2A Jun19.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: JHPL_Annexe- Form 2A Sep19.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: JHPL_Annexe- Form 2A Dec19.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: JHPL_Annexe- Form 2A Mar20.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: JHPL_Annexe- Form 2A Jun20.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: JHPL_Annexe- Form 2A Sep20.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: JHPL_Annexe- Form 2A Dec20.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: JHPL_Annexe- Form 2A Mar21.pdf11 Oct 2021
Certificates of CA (Form 5)File: JHPL.PDF14 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: Scan1.PDF4 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: Scan10002.PDF5 Apr 2018
Building plan approvalFile: Annex CC march 18.PDF30 Mar 2018
Building Plan Approval (IOD)File: Annex CC march 18.PDF30 Mar 2018
Building plan approvalFile: Tabela CC 2016_optimized.pdf30 Jul 2017
Layout approvalFile: JHPL LYOUT.PDF30 Jul 2017
PAN CardFile: JHPL PAN.PDF30 Jul 2017
Copy of the legal title reportFile: Jangid Annexe - Title Certificate - 12-10-15_optimized.pdf30 Jul 2017
Details of encumbrancesFile: JHPL - annexe non emu.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: JHPL LYOUT.PDF30 Jul 2017
Building Plan Approval (IOD)File: Tabela CC 2016_optimized.pdf30 Jul 2017
Declaration in FORM BFile: Annexe form B.PDF30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JHPL- Architect certificate _optimized.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cer JHPL.PDF30 Jul 2017
Certificates of CA (Form 3)File: JHPL Ca.PDF30 Jul 2017
Proforma of Allotment letterFile: Annexe Agree.PDF30 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 66 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jangid Annexe on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmJangid AnnexeCompleted 89Lapsed / revoked 40Abeyance 1Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 228 registered projects within 2 km.

Builder: Jangid Home pvt Ltd

Jangid Home pvt Ltd has 2 registrations on MahaRERA, including Jangid Annexe and JANGID MEADOWS. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Jangid Annexe shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Jangid Annexe is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jangid Annexe?

The registered promoter entity is Jangid Home pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jangid Annexe?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Jangid Annexe?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Jangid Annexe?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jangid Annexe?

The professionals named in the filing: Architect: Atharva Consultants; Engineer: Desai And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jangid Annexe?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jangid Annexe. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jangid Annexe to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.