Home / Browse projects / Pune, Maharashtra / Janaranjani A at Nanded City

Completed No litigation declared Residential / Group Housing project

Janaranjani A at Nanded City

By Nanded City Development & Construction Co. Ltd.

RG-MH-91517 · RERA P52100015719 · Last updated on MahaRERA portal: 25 Aug 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 19 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 20 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2019Possession promisedregistration recorded completed
72 of 99Construction stages doneacross 9 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

Janaranjani A at Nanded City is a Residential / Group Housing project by Nanded City Development & Construction Co. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100015719 on 19 Mar 2018. The registration is recorded completed; possession was promised by 31 Aug 2019.

At a glance

Project

  • NameJanaranjani A at Nanded City
  • TypeResidential / Group Housing
  • Location
    • Nanded City Main Road
    • Nanded City
    • Nanded
    • Haveli
    • Pune
    • 411068
  • Pincode411068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100015719
  • ReraGenie IDRG-MH-91517

Builder

  • NameNanded City Development & Construction Co. Ltd.
  • Entity typeCompany
  • GSTIN27AACCN2613H1ZQ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorSatish Dattatray Magar
  • Other registrations20 more →
  • Completed12 of 21
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects22 →

Key dates

this monthRegisteredMar 2018PromisedAug 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Mar 2018
  • Promised completion31 Aug 2019
  • Revised completionNone
  • Buildings9 building records
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA50000
BNA50000
CNA50000
DNA50000
ENA50000
FNA50000
GNA50000
HNA50000
INA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 25 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

72 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Installation of Lifts, at 95%.

A81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
C81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
D81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
E81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
F81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
G81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
H81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
I81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities26

As on 25 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes98%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Prepaid meters for waterYes0%
Town level 24x7 Centralized Security System with CCTV CoverageYes100%
Town level community health care facilityYes0%
Town level community marketYes100%
Town level exclusive Fire Fighting StationYes100%
Town level Gardens and ParksYes100%
Town level playgrounds excluding school playgroundsYes0%
Town level Primary and High Schools ICSE and CBSE BoardYes100%
Town level public assembly facilities like AmphitheatreYes100%
Town level restricted facilities like swimming pool Tennis Courts Gymnasium Skating rink Badminton CYes100%
Town Level Roads Jogging Cycling Tracks Footpath as per Proposed Land Use PlanYes86%

Parking filed1013

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,013
Open Space1,013
BuildingOpen SpaceTotal
A113113
B112112
C113113
D112112
E113113
F112112
G113113
H112112
I113113

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,157 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI23936.4
Proposed, not sanctioned23,936 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch13 Sholapur Bazar Road Off East Street Poolgate Pune 411001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch Prakash Deshmukh
ArchitectArch Malay Deshmukh
EngineerMr Achyut Watve
Chartered AccountantD R Barve & Co
Chartered AccountantSDB & Company
PartnerRole in project
Nanded City Development & Construction Co. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Aug 2019

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf25 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf21 Jun 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf29 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Annual Report on Statement of Accounts.pdf2 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - March 2020.pdf2 Jan 2021
Certificates of CA (Form 5)File: Form 5 - Annual Report on Statement of Accounts.pdf28 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf31 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building A.pdf27 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building B.pdf27 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building C.pdf27 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building D.pdf27 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building E.pdf27 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building F.pdf27 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building G.pdf27 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building H.pdf27 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building I.pdf27 Aug 2019
Proforma of Allotment letterFile: Janranjani NRD 5A - Agreement.pdf19 Nov 2018
Certificates of CA (Form 5)File: Form 5 - Annual Report on Statement of Accounts.pdf1 Oct 2018
PAN CardFile: PAN Card- NCDCCL.pdf7 Mar 2018
Copy of the legal title reportFile: SEARCH REPORT NRD-5A.pdf7 Mar 2018
Details of encumbrancesFile: Encumbrance Certificate.pdf7 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Commecment Certificate NRD 5A.pdf7 Mar 2018
Declaration in FORM BFile: Affidavit.pdf7 Mar 2018
Certificates of CA (Form 3)File: CA Certificate.pdf7 Mar 2018
Proforma of Allotment letterFile: Allotment Letter and Agreement.pdf7 Mar 2018
Layout approvalFile: Janaranjani A Layput Plan.pdf6 Mar 2018
Building plan approvalFile: Janaranjani A Building Plan 1.pdf6 Mar 2018
Building plan approvalFile: Janaranjani A Building Plan 2.pdf6 Mar 2018
Copy of Layout Approval (in case of layout)File: Janaranjani A Layput Plan.pdf6 Mar 2018
Building Plan Approval (IOD)File: Janaranjani A Building Plan 1.pdf6 Mar 2018
Building Plan Approval (IOD)File: Janaranjani A Building Plan 2.pdf6 Mar 2018

Promoter's earlier projects22

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

19 delivered on promise3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Aalaap - I at Nanded CityP52100055134Nanded Phata, Pune936Mar 2024OngoingDec 2027Not due yet
Destination Center - IIP52100079788Nanded Phata, Pune56Mar 2025OngoingDec 2026Not due yet
Bahaar at Nanded CityP52100049984Nanded Phata, Pune608Mar 2023OngoingDec 2026Not due yet
Janaranjani - D Phase II at Nanded CityP52100047078Nanded Phata, Pune-Sep 2022CompletedDec 2025Apr 2025
Sur at Nanded CityP52100032686Nanded Phata, Pune-Jan 2022CompletedAug 2025Apr 2025
Rhythm III at Nanded CityP52100028650Nanded Phata, Pune121Mar 2021Certificate SignedSep 2024Feb 2024
Rhythm II at Nanded CityP52100028623Nanded Phata, Pune87Mar 2021Certificate SignedSep 2024Feb 2024
Rhythm I at Nanded CityP52100028606Nanded Phata, Pune79Mar 2021Certificate SignedSep 2024Feb 2024
Kalashree at Nanded CityP52100021483Nanded Phata, Pune-Jul 2019Certificate SignedMay 2023Dec 2022
Bageshree at Nanded CityP52100021465Nanded Phata, Pune-Jul 2019Certificate SignedMay 2023Dec 2022
Pancham Phase II at Nanded CityNanded City Sinhagad Road Pune 411068496-CompletedApr 2021Jan 2021
Janaranjani 5B at Nanded CityNanded City Sinhagad Road Pune 411068540-CompletedNov 2020Jun 2020
Pancham Phase I at Nanded CityNanded City Sinhagad Road Pune 411068496-CompletedOct 2019Apr 2019
Janaranjani 5A at Nanded CityNanded City Sinhagad Road Pune 411068540-CompletedAug 2019Aug 2019
Sargam at Nanded CityNanded City Sinhagad Road Pune 4110681,736-CompletedMar 2019Jul 2018
Madhuvanti at Nanded CityNanded City Sinhagad Road Pune 4110681,012-CompletedAug 2016Mar 2016
Mangal Bhairav at Nanded CityNanded City Sinhagad Road Pune 4110681,672-CompletedDec 2015Oct 2015
Sarang at Nanded CityNanded City Sinhagad Road Pune 4110681,144-CompletedNov 2015Oct 2015
Asawari at Nanded CityNanded City Sinhagad Road Pune 4110681,936-CompletedOct 2015Aug 2015
Shubhkalyan at Nanded CityNanded City Sinhagad Road Pune 411068528-CompletedSep 2015Mar 2015
Lalit at Nanded CityNanded City Sinhagad Road Pune 411068792-CompletedApr 2015Dec 2014
Destination Center I at Nanded CityNanded City Sinhagad Road Pune 411068272-CompletedApr 2015Mar 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Janaranjani A at Nanded City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nanded City13,700+ in Pune

2 kmJanaranjani A at Nanded Completed 25Lapsed / revoked 19Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: Nanded City Development & Construction Co. Ltd.

Nanded City Development & Construction Co. Ltd. has 21 registrations on MahaRERA, including Sargam at Nanded City and Pancham Phase I at Nanded City. Its filings disclose 22 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Janaranjani A at Nanded City is delayed beyond 31 Aug 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Janaranjani A at Nanded City?

The registered promoter entity is Nanded City Development & Construction Co. Ltd., a company as per the filing. Its GSTIN 27AACCN2613H1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Janaranjani A at Nanded City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Janaranjani A at Nanded City?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Janaranjani A at Nanded City?

The professionals named in the filing: Architect: Arch Prakash Deshmukh; Architect: Arch Malay Deshmukh; Engineer: Mr Achyut Watve; Chartered Accountant: D R Barve & Co; Chartered Accountant: SDB & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Janaranjani A at Nanded City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Janaranjani A at Nanded City. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Janaranjani A at Nanded City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.