Home / Browse projects / Thane, Maharashtra / JAI GURUJI TOWER

Registration lapsed No litigation declared Residential / Group Housing project

JAI GURUJI TOWER

By OM SAI CONSTRUCTION AND DEVELOPERS

RG-MH-65549 · RERA P51700012793 · Last updated on MahaRERA portal: 18 Mar 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 8%
3Complaints at MahaRERAon this registration
Jump to the 26 documents Report an error

JAI GURUJI TOWER is a Residential / Group Housing project by OM SAI CONSTRUCTION AND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700012793 on 7 Sep 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 6 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameJAI GURUJI TOWER
  • TypeResidential / Group Housing
  • Location
    • Brave road
    • Gauripada
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700012793
  • ReraGenie IDRG-MH-65549

Builder

  • NameOM SAI CONSTRUCTION AND DEVELOPERS
  • Entity typePartnership
  • PartnerSANTOSH RAMSARAN PANDEY

Key dates

40 months past promisethis monthRegisteredSep 2017First promiseDec 2022Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Sep 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed26 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JAI GURUJI TOWERNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 8%.

JAI GURUJI TOWER: 10% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes75%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes75%
Open ParkingYes0%

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Open Space11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,080 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2207.31
Proposed, not sanctioned2,207 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOLD SUCHAK NIWAS, CTS NO 3203,MURBAD ROAD, KALYAN WEST ,421301

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVARGHESE JOHN
EngineerARUN KHASNIS
PartnerRole in project
OM SAI CONSTRUCTION AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700013937Dec 2022 → Jun 2023

Reason as filed by the promotersome project work and occupation certificate is remaining.

Litigation declared1

CaseCourtStatus
111/2018KALYAN HEARING

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000001703Hiral EnterprisesM/s. Om Sai Construction And Developers03/11/2017
CC006000000089610Hiral enterprisesM/s. Om Sai Construction &Developers05/06/2019
CC006000000193923M/s. Hiral EnterprisesM/s. Om Sai Constructionand Developers06/09/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Mar 2023

Documents filed26

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: lp4.pdf18 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: lp5.pdf18 Mar 2023
Disclosure of sold/ booked inventoryFile: lp1.pdf18 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: lp2.pdf18 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: lp3.pdf18 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: lp6.pdf18 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: lp8.pdf18 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: lp7.pdf18 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: it tax.pdf17 Mar 2023
Disclosure of sold/ booked inventoryFile: booked inventry.pdf17 Mar 2023
OtherFile: Declration.pdf21 Aug 2020
OtherFile: OM SAI DOCUMENT FOR RERA.pdf27 Nov 2017
Layout approvalFile: PLAN LAYOUT 1ST PAGE.pdf30 Aug 2017
Layout approvalFile: PLAN LAYOUT PAGE 2.pdf30 Aug 2017
Building plan approvalFile: FIRST IOD PARAMB.pdf30 Aug 2017
Copy of the legal title reportFile: TITLE REPORT NEW.pdf30 Aug 2017
Details of encumbrancesFile: ENCUMBRANCES.pdf30 Aug 2017
Copy of Layout Approval (in case of layout)File: PLAN LAYOUT 1ST PAGE.pdf30 Aug 2017
Copy of Layout Approval (in case of layout)File: PLAN LAYOUT PAGE 2.pdf30 Aug 2017
Building Plan Approval (IOD)File: FIRST IOD PARAMB.pdf30 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: CHANGED IOD FIRST PAGE.pdf30 Aug 2017
Declaration in FORM BFile: FORM B NEW.pdf30 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITIC CERF NEW.pdf30 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERFICATE NEW.pdf30 Aug 2017
Certificates of CA (Form 3)File: CA CERF PART 2.pdf30 Aug 2017
Proforma of Allotment letterFile: LETTER FOR AGREEMENT AND SALE.pdf30 Aug 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 6 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAI GURUJI TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gauripada7,600+ in Thane

2 kmJAI GURUJI TOWERCompleted 58Lapsed / revoked 54Other 88Dot size: filed unitsN

Filed coordinates, straight-line distance. 200 registered projects within 2 km.

Builder: OM SAI CONSTRUCTION AND DEVELOPERS

OM SAI CONSTRUCTION AND DEVELOPERS has 1 registration on MahaRERA, including JAI GURUJI TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that JAI GURUJI TOWER shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if JAI GURUJI TOWER is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAI GURUJI TOWER?

The registered promoter entity is OM SAI CONSTRUCTION AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAI GURUJI TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JAI GURUJI TOWER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JAI GURUJI TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAI GURUJI TOWER?

The professionals named in the filing: Architect: VARGHESE JOHN; Engineer: ARUN KHASNIS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAI GURUJI TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAI GURUJI TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAI GURUJI TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.