Registered No litigation declared Residential / Group Housing project

JAGJEET ENCLAVE

By JAGJEET SHRUSTI REALTORS

RG-MH-03298 · RERA P51700020846 · Last updated on MahaRERA portal: 6 Feb 2026

Source: official MahaRERA filing

Red flags

  • 14 complaints at MahaRERA
  • Completion date moved by 31 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 31 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 97%
17 of 160Units unsoldnot recorded sold or booked
14Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

JAGJEET ENCLAVE is a Residential / Group Housing project by JAGJEET SHRUSTI REALTORS in Thane, Maharashtra, registered with MahaRERA as P51700020846 on 15 May 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 31 months from the original filing. 143 of the 160 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 14 complaints are on record with the regulator.

At a glance

Project

  • NameJAGJEET ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • DIVA SHIL ROAD
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • RERA no.P51700020846
  • ReraGenie IDRG-MH-03298

Builder

  • NameJAGJEET SHRUSTI REALTORS
  • Entity typePartnership
  • Partnersmohan shivram gowda, rohit vasudeo rao, amol ashok mandlik

Key dates

this monthRegisteredMay 2019First promiseMay 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 4 May 2024)
  • Buildings1 building record
  • Documents filed125 files

Current status

89%143 of 160 units booked
96.1%Work done, per cost certificate

Figures as on 6 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JAGJEET ENCLAVENA21201600160

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.

JAGJEET ENCLAVE: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 6 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Open Space55

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,032 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI4427.98
Proposed, not sanctioned4,428 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHANE
Estimated costRs 31.50 cr
Cost incurredRs 30.26 cr
Work done96.07%
BuildingWingEstimatedIncurred
JAGJEET ENCLAVENARs 25.50 crRs 24.40 cr
-NARs 6.00 crRs 5.86 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARYAN CONSULTANTS
EngineerSS CONS
Chartered AccountantKISAN & CO
Chartered AccountantE S SAWANT AND ASSOCIATES
PartnerRole in project
JAGJEET SHRUSTI REALTORS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019749May 2024 → May 2025

Reason as filed by the promoterDue to shortage of labour, financial problems ,and slow market position, we could not complete at time. we are request to extend our time for 1 year i.e. 04-05-2025

EXT51700028382May 2024 → Dec 2026

Reason as filed by the promoterDue to certain circumstances, we are unable to complete our project. Therefore, we request an extension until 31st December 2026

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC12503944Sagar Sudam BhorJAGJEET SHRUSTI REALTORS10/11/2025
CC12503947Rahul Sudam BhorJAGJEET SHRUSTI REALTORS10/11/2025
CC12504090Rahul Subhash KanseJAGJEET SHRUSTI REALTORS20/11/2025
CC12504093Pandurang Ganpat ShindeJAGJEET SHRUSTI REALTORS20/11/2025
CC12504098Anish Tejdhar UpadhyayJAGJEET SHRUSTI REALTORS20/11/2025
CC12504099Sharda Namdev ShindeJAGJEET SHRUSTI REALTORS20/11/2025
CC12504128ISHWAR DIPAK ICHAKEJAGJEET SHRUSTI REALTORS23/11/2025
CC12504315Sumit Baban BhojeJAGJEET SHRUSTI REALTORS06/12/2025
CC12600050Sanjay Maruti LokareJAGJEET SHRUSTI REALTORS04/01/2026
CC12600145Sagar Atamaram ChavanJAGJEET SHRUSTI REALTORS09/01/2026
CC12600146Kishor Sharnappa WagheJAGJEET SHRUSTI REALTORS09/01/2026
CC12504723suraj chandrakant parabJAGJEET SHRUSTI REALTORS31/12/2025
CC12600049Hemant Shantaram JadhavJAGJEET SHRUSTI REALTORS04/01/2026
CC12600144Prashant Prakash VaneJAGJEET SHRUSTI REALTORS09/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 May 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 1File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 1File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 1File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 1File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 1File: arc qpr3.pdf6 Feb 2026
Withdrawal Update Form 1File: arc qpr3.pdf6 Feb 2026
Withdrawal Update Form 1File: arc qpr3.pdf6 Feb 2026
Withdrawal Update Form 1File: arc qpr3.pdf6 Feb 2026
Withdrawal Update Form 1File: arc qpr3.pdf6 Feb 2026
Withdrawal Update Form 1File: arc qpr3.pdf6 Feb 2026
Withdrawal Update Form 2File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 2File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 2File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 2File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 2File: Mar 25.pdf6 Feb 2026
Withdrawal Update Form 2File: rcc qpr 3.pdf6 Feb 2026
Withdrawal Update Form 2File: rcc qpr 3.pdf6 Feb 2026
Withdrawal Update Form 2File: rcc qpr 3.pdf6 Feb 2026
Withdrawal Update Form 2File: rcc qpr 3.pdf6 Feb 2026
Withdrawal Update Form 2File: rcc qpr 3.pdf6 Feb 2026
Withdrawal Update Form 2File: rcc qpr 3.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 03.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 03.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 03.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 03.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 03.pdf6 Feb 2026
Withdrawal Update Form 3File: ca qpr3.pdf6 Feb 2026
Withdrawal Update Form 3File: ca qpr3.pdf6 Feb 2026
Withdrawal Update Form 3File: ca qpr3.pdf6 Feb 2026
Withdrawal Update Form 3File: ca qpr3.pdf6 Feb 2026
Withdrawal Update Form 3File: ca qpr3.pdf6 Feb 2026
Withdrawal Update Form 3File: ca qpr3.pdf6 Feb 2026
Withdrawal Update Form 1File: Mar 25.pdf17 Jan 2026
Withdrawal Update Form 1File: Mar 25.pdf17 Jan 2026
Withdrawal Update Form 2File: Mar 25.pdf17 Jan 2026
Withdrawal Update Form 2File: Mar 25.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 03.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 03.pdf17 Jan 2026
Withdrawal Update Form 1File: Mar 25.pdf6 Nov 2025
Withdrawal Update Form 2File: Mar 25.pdf6 Nov 2025
Withdrawal Update Form 3File: Form 03.pdf6 Nov 2025
Withdrawal Update Form 1File: Mar 25.pdf26 Jun 2025
Withdrawal Update Form 2File: Mar 25.pdf26 Jun 2025
Withdrawal Update Form 3File: Form 03.pdf26 Jun 2025
Declaration in FORM BFile: Declartion supported_page-0001.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 2020-21.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Jun-24.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Sep-24.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Dec-24.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 March 25.pdf19 May 2025
Certificates of CA (Form 3)File: 6 Jun 24.pdf19 May 2025
Certificates of CA (Form 3)File: 7 Sep 24.pdf19 May 2025
Certificates of CA (Form 3)File: 8 Dec 24.pdf19 May 2025
Certificates of CA (Form 3)File: 9 March 25.pdf19 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 2021-22.pdf19 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 25.pdf19 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 24.pdf19 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sep 24.pdf19 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Jun 24.pdf19 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 2022-23.pdf19 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY.pdf19 May 2025
Other - TechnicalFile: Architects Certifcate of work of updation details.pdf19 May 2025
Other - TechnicalFile: Form 2A.pdf19 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for sec uredunsecured finance availed fortheDrot ect.pdf19 May 2025
Declaration about Commencement CertificateFile: CC_DECLARATION.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A_19-20.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A_20-21.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A_21-22.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A_22-23.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A_23-24.pdf21 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5_19-20.pdf21 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM5_20-21.pdf21 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5_21-22.pdf21 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5_22-23.pdf21 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM5_23-24.pdf21 May 2024
CERSAI detailsFile: CERSAI_Search_Report_200306191099_For_Asset_Based_Search_09_05_2024_14_14_28_395.pdf9 May 2024
Copy of the legal title reportFile: title report latest.pdf8 May 2024
Details of encumbrancesFile: encumbrance finance.pdf8 May 2024
Details of encumbrancesFile: encumbrance legal.pdf8 May 2024

How this compares with Thane

89%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 31 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAGJEET ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DIVA SHIL ROAD7,600+ in Thane

Builder: JAGJEET SHRUSTI REALTORS

JAGJEET SHRUSTI REALTORS has 1 registration on MahaRERA, including JAGJEET ENCLAVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JAGJEET ENCLAVE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAGJEET ENCLAVE?

The registered promoter entity is JAGJEET SHRUSTI REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAGJEET ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JAGJEET ENCLAVE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JAGJEET ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAGJEET ENCLAVE?

The professionals named in the filing: Architect: ARYAN CONSULTANTS; Engineer: SS CONS; Chartered Accountant: KISAN & CO; Chartered Accountant: E S SAWANT AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAGJEET ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAGJEET ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAGJEET ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.