JAGANNATH HERITAGE
RG-MH-65796 · RERA P52100052896 · Last updated on MahaRERA portal: 3 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
JAGANNATH HERITAGE is a Residential / Group Housing project by ASCENT LANDMARKS in Pune, Maharashtra, registered with MahaRERA as P52100052896 on 5 Oct 2023. Possession is promised by 31 Mar 2027. 8 of the 24 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameJAGANNATH HERITAGE
- TypeResidential / Group Housing
- Location
- SADASHIV PETH PUNE
- NAVI PETH
- Peth
- Haveli
- Pune
- 411030
- Pincode411030
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052896
- ReraGenie IDRG-MH-65796
Builder
- NameASCENT LANDMARKS
- Entity typePartnership
- GSTIN27ABYFA7102N1ZU
- PartnersABHIJIT ARUN DEOSTHALE, SACHIN GOVIND KELKAR, ASHUTOSH SADASHIV KULKARNI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2023
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 3 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| JAGANNATH HERITAGE | NA | 7 | 6 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 50%.
JAGANNATH HERITAGE: 54% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed98
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| ABHIJIT ARUN DEOSTHALE | Parvati | Pune |
| YASHODHAN ARUN DEOSTHALE | Parvati | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | OMKAR ARCHIETECTS |
| Engineer | G A BHILARE CONSULTANTS PVT LTD |
| Chartered Accountant | KPCA & CO CHARTERED ACCOUNTANTS |
| Chartered Accountant | Phule Wagh & Associates LLP |
| Chartered Accountant | GUNWANI & KOLAPKAR |
| Partner | Role in project |
|---|---|
| ASCENT LANDMARKS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jun 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Form 5.pdf | 3 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A.pdf | 30 Jun 2026 |
| Building plan approvalFile: Revised plan.pdf | 26 Jun 2026 |
| Form 1File: Form 1 Architects Certificate Q4.pdf | 14 Apr 2026 |
| Form 2File: Form 2 Engineers Certificate.pdf | 14 Apr 2026 |
| Form 3File: Jagannath Heritage Q4 FY 25-26 FORM 3 Chartered Accountant Certificate.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf | 14 Apr 2026 |
| Form 1File: Form 1 Architects Certificate Q3 25-26.pdf | 20 Jan 2026 |
| Form 2File: Form 2 Engineers Certificate Q3 25-26.pdf | 20 Jan 2026 |
| Form 3File: FINAL Jagannath Heritage Q3 FY 25-26 FORM 3 Chartered Accountant Certificate (1).pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of inventory.pdf | 20 Jan 2026 |
| Form 1File: Form 1 Architects Certificate Q2.pdf | 17 Oct 2025 |
| Form 2File: Form 2 Engineers Certificate Q2.pdf | 17 Oct 2025 |
| Form 3File: FINAL Jagannath Heritage Q2 FY25-26 FORM 3 Chartered Accountant Certificate.pdf | 17 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q2.pdf | 17 Oct 2025 |
| Form 1File: Form 1 Architects Certificate Q1 FY 2025-26.pdf | 21 Jul 2025 |
| Form 2File: Form 2 Engineers Certificate.pdf | 21 Jul 2025 |
| Form 3File: FINAL Jagannath Heritage Q1 FY25-26 FORM 3 Chartered Accountant Certificate (1).pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked unsold inventory.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Q4 24-25.pdf | 7 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL Jagannath Heritage Q4 FY24-25 FORM 3 Chartered Accountant Certificate.pdf | 7 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q4 24-25.pdf | 7 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 7 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL Jagannath Heritage Q3 FY24-25 FORM 3 Chartered Accountant Certificate.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Cerftificate.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory data scan.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Quarter 1 scan.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Q4.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Quater 4.pdf | 18 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 18 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory scanned q4.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Quater 4 scanned.pdf | 18 Apr 2024 |
| Layout approvalFile: plan 1.pdf | 29 Mar 2024 |
| Building plan approvalFile: plan 2.pdf | 29 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: plan 1.pdf | 29 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 2.pdf | 29 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 29 Mar 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC Format D.pdf | 29 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 scanned q3.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 scanned q3.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate scan q3.pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory scan q3.pdf | 11 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised.pdf | 15 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrances Financial.pdf | 14 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrances Financial.pdf | 14 Sep 2023 |
| CERSAI detailsFile: Undertaking CERSAI.pdf | 14 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2).pdf | 14 Sep 2023 |
| Building plan approvalFile: sanction plan 0002.pdf | 8 Sep 2023 |
| Layout approvalFile: sanction plan 0001.pdf | 8 Sep 2023 |
| PAN CardFile: PAN Card.pdf | 8 Sep 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 8 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance financial 08092023.pdf | 8 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: encumbrance legal 08092023.pdf | 8 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance financial 08092023.pdf | 8 Sep 2023 |
| Details of encumbrances concerned to LegalFile: encumbrance legal 08092023.pdf | 8 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: sanction plan 0001.pdf | 8 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: sanction plan 0002.pdf | 8 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC compressed.pdf | 8 Sep 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 8 Sep 2023 |
| Declaration in FORM BFile: form b promoter.pdf | 8 Sep 2023 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 8 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 8 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE AAD 08092023.pdf | 8 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE ASK 08092023.pdf | 8 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure SGK.pdf | 8 Sep 2023 |
| Proforma of Agreement for saleFile: RERA Agreement Draft.pdf | 8 Sep 2023 |
| Proforma of Allotment letterFile: allotment letter 08092023.pdf | 8 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration.pdf | 8 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: deviation report allotment letter 08092023.pdf | 8 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation report afs 08092023.pdf | 8 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep JAGANNATH HERITAGE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NAVI PETH13,700+ in Pune
Filed coordinates, straight-line distance. 520 registered projects within 2 km.
NYATI EVANIA
NYATI CONSTRUCTION PRIVATE LIMITED
CENTRALVISTA
NAIKNAVARE DEVELOPERS PVT. LTD.
Guardian Cityscapes Phase-3
Guardian Homes Private Limited
SARASNAGAR
CITY ETHERNAL LLP
PROFITBAY
LAXMI SPACECON LLP
SUN GLORY
Jindal Mittal Graha Nirman Pvt. Ltd.
Builder: ASCENT LANDMARKS
ASCENT LANDMARKS has 1 registration on MahaRERA, including JAGANNATH HERITAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if JAGANNATH HERITAGE is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of JAGANNATH HERITAGE?
The registered promoter entity is ASCENT LANDMARKS, a partnership as per the filing. Its GSTIN 27ABYFA7102N1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in JAGANNATH HERITAGE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for JAGANNATH HERITAGE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at JAGANNATH HERITAGE?
The professionals named in the filing: Architect: OMKAR ARCHIETECTS; Engineer: G A BHILARE CONSULTANTS PVT LTD; Chartered Accountant: KPCA & CO CHARTERED ACCOUNTANTS; Chartered Accountant: Phule Wagh & Associates LLP; Chartered Accountant: GUNWANI & KOLAPKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JAGANNATH HERITAGE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback