Home / Browse projects / Pune, Maharashtra / JAGANNATH HERITAGE

Registered No litigation declared Residential / Group Housing project

JAGANNATH HERITAGE

By ASCENT LANDMARKS

RG-MH-65796 · RERA P52100052896 · Last updated on MahaRERA portal: 3 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 50%
16 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

JAGANNATH HERITAGE is a Residential / Group Housing project by ASCENT LANDMARKS in Pune, Maharashtra, registered with MahaRERA as P52100052896 on 5 Oct 2023. Possession is promised by 31 Mar 2027. 8 of the 24 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameJAGANNATH HERITAGE
  • TypeResidential / Group Housing
  • Location
    • SADASHIV PETH PUNE
    • NAVI PETH
    • Peth
    • Haveli
    • Pune
    • 411030
  • Pincode411030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052896
  • ReraGenie IDRG-MH-65796

Builder

  • NameASCENT LANDMARKS
  • Entity typePartnership
  • GSTIN27ABYFA7102N1ZU
  • PartnersABHIJIT ARUN DEOSTHALE, SACHIN GOVIND KELKAR, ASHUTOSH SADASHIV KULKARNI

Key dates

this monthRegisteredOct 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

33%8 of 24 units booked

Figures as on 3 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JAGANNATH HERITAGENA7624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 50%.

JAGANNATH HERITAGE: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed98

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots98
Closed/Covered98

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,050 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jun 2026
LandownerVillageDistrict
ABHIJIT ARUN DEOSTHALEParvatiPune
YASHODHAN ARUN DEOSTHALEParvatiPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3358.4
Proposed, not sanctioned3,355 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD PUNE 411004

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOMKAR ARCHIETECTS
EngineerG A BHILARE CONSULTANTS PVT LTD
Chartered AccountantKPCA & CO CHARTERED ACCOUNTANTS
Chartered AccountantPhule Wagh & Associates LLP
Chartered AccountantGUNWANI & KOLAPKAR
PartnerRole in project
ASCENT LANDMARKS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5.pdf3 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf30 Jun 2026
Building plan approvalFile: Revised plan.pdf26 Jun 2026
Form 1File: Form 1 Architects Certificate Q4.pdf14 Apr 2026
Form 2File: Form 2 Engineers Certificate.pdf14 Apr 2026
Form 3File: Jagannath Heritage Q4 FY 25-26 FORM 3 Chartered Accountant Certificate.pdf14 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf14 Apr 2026
Form 1File: Form 1 Architects Certificate Q3 25-26.pdf20 Jan 2026
Form 2File: Form 2 Engineers Certificate Q3 25-26.pdf20 Jan 2026
Form 3File: FINAL Jagannath Heritage Q3 FY 25-26 FORM 3 Chartered Accountant Certificate (1).pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of inventory.pdf20 Jan 2026
Form 1File: Form 1 Architects Certificate Q2.pdf17 Oct 2025
Form 2File: Form 2 Engineers Certificate Q2.pdf17 Oct 2025
Form 3File: FINAL Jagannath Heritage Q2 FY25-26 FORM 3 Chartered Accountant Certificate.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q2.pdf17 Oct 2025
Form 1File: Form 1 Architects Certificate Q1 FY 2025-26.pdf21 Jul 2025
Form 2File: Form 2 Engineers Certificate.pdf21 Jul 2025
Form 3File: FINAL Jagannath Heritage Q1 FY25-26 FORM 3 Chartered Accountant Certificate (1).pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked unsold inventory.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Q4 24-25.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL Jagannath Heritage Q4 FY24-25 FORM 3 Chartered Accountant Certificate.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q4 24-25.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL Jagannath Heritage Q3 FY24-25 FORM 3 Chartered Accountant Certificate.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Cerftificate.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory data scan.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Quarter 1 scan.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Q4.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Quater 4.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory scanned q4.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Quater 4 scanned.pdf18 Apr 2024
Layout approvalFile: plan 1.pdf29 Mar 2024
Building plan approvalFile: plan 2.pdf29 Mar 2024
Copy of Layout Approval (in case of layout)File: plan 1.pdf29 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 2.pdf29 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Mar 2024
Declaration about Commencement CertificateFile: Declaration about CC Format D.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 scanned q3.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 scanned q3.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate scan q3.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory scan q3.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised.pdf15 Sep 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrances Financial.pdf14 Sep 2023
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrances Financial.pdf14 Sep 2023
CERSAI detailsFile: Undertaking CERSAI.pdf14 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2).pdf14 Sep 2023
Building plan approvalFile: sanction plan 0002.pdf8 Sep 2023
Layout approvalFile: sanction plan 0001.pdf8 Sep 2023
PAN CardFile: PAN Card.pdf8 Sep 2023
Copy of the legal title reportFile: Legal Title Report.pdf8 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrance financial 08092023.pdf8 Sep 2023
Details of encumbrances concerned to FinanceFile: encumbrance legal 08092023.pdf8 Sep 2023
Details of encumbrances concerned to LegalFile: Encumbrance financial 08092023.pdf8 Sep 2023
Details of encumbrances concerned to LegalFile: encumbrance legal 08092023.pdf8 Sep 2023
Copy of Layout Approval (in case of layout)File: sanction plan 0001.pdf8 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: sanction plan 0002.pdf8 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC compressed.pdf8 Sep 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf8 Sep 2023
Declaration in FORM BFile: form b promoter.pdf8 Sep 2023
CERSAI detailsFile: CERSAI Declaration.pdf8 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE AAD 08092023.pdf8 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE ASK 08092023.pdf8 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure SGK.pdf8 Sep 2023
Proforma of Agreement for saleFile: RERA Agreement Draft.pdf8 Sep 2023
Proforma of Allotment letterFile: allotment letter 08092023.pdf8 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration.pdf8 Sep 2023
Deviation Report with respect to Allotment letterFile: deviation report allotment letter 08092023.pdf8 Sep 2023
Deviation Report with respect to model copy of AgreementFile: deviation report afs 08092023.pdf8 Sep 2023

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAGANNATH HERITAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVI PETH13,700+ in Pune

2 kmJAGANNATH HERITAGECompleted 193Lapsed / revoked 123Other 204Dot size: filed unitsN

Filed coordinates, straight-line distance. 520 registered projects within 2 km.

Builder: ASCENT LANDMARKS

ASCENT LANDMARKS has 1 registration on MahaRERA, including JAGANNATH HERITAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if JAGANNATH HERITAGE is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAGANNATH HERITAGE?

The registered promoter entity is ASCENT LANDMARKS, a partnership as per the filing. Its GSTIN 27ABYFA7102N1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAGANNATH HERITAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAGANNATH HERITAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAGANNATH HERITAGE?

The professionals named in the filing: Architect: OMKAR ARCHIETECTS; Engineer: G A BHILARE CONSULTANTS PVT LTD; Chartered Accountant: KPCA & CO CHARTERED ACCOUNTANTS; Chartered Accountant: Phule Wagh & Associates LLP; Chartered Accountant: GUNWANI & KOLAPKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAGANNATH HERITAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAGANNATH HERITAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAGANNATH HERITAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.