Registered No litigation declared Residential / Group Housing project

Jade Solitaire

By National Happy Homes

RG-MH-05256 · RERA P51900051442 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 75%
11 of 15Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

Jade Solitaire is a Residential / Group Housing project by National Happy Homes in Mumbai City, Maharashtra, registered with MahaRERA as P51900051442 on 14 Jun 2023. Possession is promised by 31 Mar 2027. 4 of the 15 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameJade Solitaire
  • TypeResidential / Group Housing
  • Location
    • Hormusji Adenwalla Road
    • Matunga
    • Fnorth-400019
    • Ward FNorth
    • Mumbai City
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900051442
  • ReraGenie IDRG-MH-05256

Builder

  • NameNational Happy Homes
  • Entity typePartnership
  • GSTIN27AAFFN1387E1ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNaresh Bhavanji Chheda, Umang Dinesh Kuwadia, Jitesh Kantilal Jain, Mukesh Vijpar Nishar, Vimi Mukesh Nishar
  • Other registrations4 more →
  • Completed4 of 5

Key dates

this monthRegisteredJun 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

27%4 of 15 units booked
60.7%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Jade SolitaireNA201315015

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

Jade Solitaire: 61% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered51

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area829 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 May 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3428.55
Proposed, not sanctioned3,395 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 Pal Residency Bhandarkar Road Matunga CR Mumbai 400019
Estimated costRs 34.25 cr
Cost incurredRs 20.78 cr
Work done60.67%
BuildingWingEstimatedIncurred
Jade SolitaireNARs 32.80 crRs 20.78 cr
-NARs 1.45 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Centric Studio
ArchitectOne Architectural Consultant
ArchitectGA Designs Architects & Interior Design
EngineerMr Sujit Desai
EngineerS N Apte & Co
Chartered AccountantMr Girish L Shethia
Chartered AccountantVSMP and Co LLP Chartered Accountants
PartnerRole in project
National Happy Homes-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Jade Solitaire Form 1 Architect Certificate for 31 March 2026 (1).pdf12 May 2026
Withdrawal Update Form 2File: Jade Solitaire Form 2 Engineer Certificate for for 31 March 2026 (1).pdf12 May 2026
Withdrawal Update Form 3File: Form-3.pdf12 May 2026
Withdrawal Update Form 1File: Jade Solitaire Architect Certificate for dec 2025.pdf9 Feb 2026
Withdrawal Update Form 2File: Jade Solitaire Engineer Certificate for dec 2025.pdf9 Feb 2026
Withdrawal Update Form 3File: Form3_NHH-JS-2526-Q3.pdf9 Feb 2026
Withdrawal Update Form 1File: Jade Solitaire Architect Certificate 30092025_compressed.pdf12 Dec 2025
Withdrawal Update Form 2File: Jade Solitaire Engineer Certificate 30092025.pdf12 Dec 2025
Withdrawal Update Form 3File: NHH-JS- 2526 Q2 Form3.pdf12 Dec 2025
Withdrawal Update Form 1File: JA Form 1 Arct Cert for 30062025.pdf4 Oct 2025
Withdrawal Update Form 2File: JA Form 2 Engg Cert for June 2025.pdf4 Oct 2025
Withdrawal Update Form 3File: NHH JS 2526 Q1 Form3.pdf4 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 NHH JS 31032025.pdf1 Jul 2025
Form 1File: Jade Solitaire Architect Certificate 31032025.pdf28 May 2025
Form 2File: Jade Solitaire Engineer Certificate 31032025.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: Jade Solitaire SoldUnsold Inventory 31032025.pdf28 May 2025
Form 3File: NHH JS Form3 31032025.pdf28 May 2025
Form 1File: Architect Certificate Jade Solitaire 311224.pdf28 May 2025
Form 2File: Engineer Certificate Jade Solitaire 31122024.pdf28 May 2025
Form 3File: NHH JS Form3 31122024.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: SoldUnsold Inventory Jade Solitaire 311224.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JS Form3 31122024.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jade Solitaire 311224.pdf21 Mar 2025
Disclosure of sold/ booked inventoryFile: SoldUnsold Inventory Jade Solitaire 311224.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JS Form3 092024.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHHJSForm3062024.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: NHH JS Form5 31032024.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: NHH JS Form5 31032024.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAR Arct Form 1 for 31032024.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JS Form 1 Arct Certificate as of 31032024.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate for Jade Solitaire for 31 March 2024.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Area Statement for March 2024.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JS Form 1 Arct Certificate as of 31032024.pdf13 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate for Jade Solitaire for 31 March 2024.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NHH JS Form3 31032024.pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Area Statement for Sep 2023.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JS Form 3 for 31122023.pdf23 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JS Form3 Sept 2023.pdf25 Jan 2024
Declaration in FORM BFile: Form B - Jade Solitaire.pdf1 Jun 2023
Other - TechnicalFile: Self Declaration for Property Details.pdf1 Jun 2023
Other - TechnicalFile: Self Declaration for Fitness Center.pdf1 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200269526526_For_Asset_Based_Search_23_05_2023_21_24_31_982.pdf23 May 2023
Details of encumbrances concerned to FinanceFile: Self Declaration regarding Financial Encumbrances.pdf19 May 2023
Details of encumbrances concerned to LegalFile: Self Declaration regarding Financial Encumbrances.pdf19 May 2023
Deviation Report with respect to model copy of AgreementFile: Revised Deviation Report of AFS.pdf24 Apr 2023
Details of encumbrances concerned to FinanceFile: Self Declaration regarding Legal Encumbrances.pdf21 Apr 2023
Details of encumbrances concerned to LegalFile: Self Declaration regarding Legal Encumbrances.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jade Solitaire Form 3 for Registration.pdf31 Mar 2023
Proforma of Agreement for saleFile: Proforma Agreement for Sale.pdf31 Mar 2023
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf31 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Separate Bank Account.pdf31 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment Letter.pdf31 Mar 2023
Building plan approvalFile: IOD approval letter.pdf29 Mar 2023
Building plan approvalFile: 1.pdf29 Mar 2023
Building plan approvalFile: 2.pdf29 Mar 2023
Building plan approvalFile: 3.pdf29 Mar 2023
Building plan approvalFile: 4.pdf29 Mar 2023
Building plan approvalFile: 5.pdf29 Mar 2023
Building plan approvalFile: 6.pdf29 Mar 2023
Layout approvalFile: Declaration for No Layout.pdf29 Mar 2023
PAN CardFile: NHH Pan Card.pdf29 Mar 2023
Copy of the legal title reportFile: Jade Solitaire Title Certificate with Search Report.pdf29 Mar 2023
Copy of Layout Approval (in case of layout)File: Declaration for No Layout.pdf29 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD approval letter.pdf29 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf29 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf29 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf29 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf29 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf29 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf29 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: 20230323 CC upto Plinth.pdf29 Mar 2023
Declaration about Commencement CertificateFile: Declaration for CC.pdf29 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclousre of Partners other Rera Projects JKJ.pdf29 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclousre of Partners other Rera Projects MVN.pdf29 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclousre of Partners other Rera Projects NBC.pdf29 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclousre of Partners other Rera Projects UDK.pdf29 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclousre of Partners other Rera Projects VMN.pdf29 Mar 2023

How this compares with Mumbai City

27%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jade Solitaire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Matunga780+ in Mumbai City

2 kmJade SolitaireCompleted 88Lapsed / revoked 60Other 83Dot size: filed unitsN

Filed coordinates, straight-line distance. 231 registered projects within 2 km.

Builder: National Happy Homes

National Happy Homes has 5 registrations on MahaRERA, including JADE VEDANT and Kamal Kunj. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Jade Solitaire is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jade Solitaire?

The registered promoter entity is National Happy Homes, a partnership as per the filing. Its GSTIN 27AAFFN1387E1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jade Solitaire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jade Solitaire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jade Solitaire?

The professionals named in the filing: Architect: Design Centric Studio; Architect: One Architectural Consultant; Architect: GA Designs Architects & Interior Design; Engineer: Mr Sujit Desai; Engineer: S N Apte & Co; Chartered Accountant: Mr Girish L Shethia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jade Solitaire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jade Solitaire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jade Solitaire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.