Home / Browse projects / Mumbai Suburban, Maharashtra / JADE PARK
JADE PARK
RG-MH-23371 · RERA P51800078679 · Last updated on MahaRERA portal: 2 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 9 cases
- Rs 275.00 crore secured on the land, in favour of INDUSIND BANK LIMITED
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
JADE PARK is a Residential / Group Housing project by SHREEPATI RISE ESTATE LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078679 on 1 Jan 2025. Possession is promised by 31 Dec 2029.
At a glance
Project
- NameJADE PARK
- TypeResidential / Group Housing
- Location
- Ansari Lane
- At Swami vivekanand road
- Andheri
- Mumbai Suburban
- 400056
- Pincode400056
- RERA no.P51800078679
- ReraGenie IDRG-MH-23371
Builder
- NameSHREEPATI RISE ESTATE LLP
- Entity typeOthers
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Jan 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings8 building records
- Documents filed77 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing J | NA | 19 | 16 | 0 | 0 | 0 |
| Wing I | NA | 19 | 16 | 0 | 0 | 0 |
| Wing H | NA | 19 | 16 | 0 | 0 | 0 |
| Wing G | NA | 19 | 16 | 0 | 0 | 0 |
| Wing F | NA | 19 | 16 | 0 | 0 | 0 |
| Wing E | NA | 19 | 16 | 0 | 0 | 0 |
| Wing D | NA | 19 | 16 | 0 | 0 | 0 |
| Wing C | NA | 19 | 16 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 2 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Excavation, at 90%.
Wing J0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing I0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing H0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing G0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing F0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing E5%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing D6%
| Activity | Progress |
|---|---|
| Excavation | 70% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C8%
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed569
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing J | 59 | 59 |
| Wing I | 97 | 97 |
| Wing H | 62 | 62 |
| Wing G | 123 | 123 |
| Wing F | 80 | 80 |
| Wing E | 59 | 59 |
| Wing D | 59 | 59 |
| Wing C | 30 | 30 |
Land and ownership7
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| SHREEPATI RISE ESTATE LLP | Mumbai City | Mumbai City |
| PANKAJ PATEL AND DEEPAK PATEL | Mumbai City | Mumbai City |
| MAN CHANDAK REALTY LLP | Mumbai City | Mumbai City |
| NEEL SHEEL PREMISES CHSL | Mumbai City | Mumbai City |
| GABRIEL COUTINHO AND OTHERS | Mumbai City | Mumbai City |
| MAHENDRA L MEHTA AND BHAVESH M MHETA | Mumbai City | Mumbai City |
| GERALD MICHAEL MISQUITTA AND OTHERS | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | B.N. SHAH & ASSOCIATES |
| Engineer | BHAGWAN SHINGALA |
| Chartered Accountant | Virag Shah |
| Chartered Accountant | VJ SHAH AND CO |
| Partner | Role in project |
|---|---|
| SHREEPATI RISE ESTATE LLP | - |
Litigation declared9
| Case | Court | Status |
|---|---|---|
| 86/2022 | Small Cause Court | Pending |
| 345/2022 | Small Cause Court | Pending |
| 1821/2021 | City Civil Court | Pending |
| 15360/2024 | HIGH COURT OF BOMBAY | Pending |
| 1378/2024 | City Civil Court | Pending |
| 3091/2023 | City Civil Court | Pending |
| 1809/2019 | City Civil Court | Pending |
| 1201/2020 | HIGH COURT OF BOMBAY | Pending |
| 2161/2019 | City Civil Court | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: JADE PARK-FORM-5-24 - 25 - Final.pdf | 2 Feb 2026 |
| Form 1File: FORM-1-C to J Architect Certificate- 30092025.pdf | 26 Nov 2025 |
| Form 2File: Form 2 - Jade Park - 30092025.pdf | 26 Nov 2025 |
| Form 3File: Form 3 - Jade Park- 30092025.pdf | 26 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: JadePark - sold unsold 30092025.pdf | 26 Nov 2025 |
| Form 1File: Architect Certificate Jade Park 30 06 2025.pdf | 18 Aug 2025 |
| Form 2File: Form 2 Jade Park - 30062025.pdf | 18 Aug 2025 |
| Form 3File: Form 3 - Jade Park - 30062025.pdf | 18 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: JadePark - sold unsold 30062025.pdf | 18 Aug 2025 |
| Form 1File: JADE PARK 16042025.pdf | 13 Jun 2025 |
| Form 2File: jade park - Form 2 31032025.pdf | 13 Jun 2025 |
| Form 3File: Jade Park Form 3.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 13 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JADE PARK C to J Wing16042025.pdf | 10 May 2025 |
| Copy of the legal title reportFile: 101-151-TC.pdf | 23 Dec 2024 |
| Copy of the legal title reportFile: 152-200-TC.pdf | 23 Dec 2024 |
| Copy of the legal title reportFile: 201-250-TC.pdf | 23 Dec 2024 |
| Copy of the legal title reportFile: 251-297-TC.pdf | 23 Dec 2024 |
| Other - FinanceFile: Final Owner-Mhada with declaration-26122024.pdf | 23 Dec 2024 |
| Other - FinanceFile: Misquitta, Coutinho and Shamilar-landowner declaration.pdf | 23 Dec 2024 |
| Layout approvalFile: Layout 06122024compressed.pdf | 6 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Layout 06122024compressed.pdf | 6 Dec 2024 |
| Proforma of Allotment letterFile: Allotment Letter Jade Park-06122024 - Copy.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-uploaded.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SRLLP RERA JADE PARK C to J13122024.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Wing CT O J-uploaded.pdf | 6 Dec 2024 |
| Other - LegalFile: Shalimar PR Card.pdf | 6 Dec 2024 |
| Other - LegalFile: sheel pr card.pdf | 6 Dec 2024 |
| Other - LegalFile: 1-50_11zon.pdf | 6 Dec 2024 |
| Other - LegalFile: 51-100_11zon.pdf | 6 Dec 2024 |
| Other - LegalFile: 101-153_11zon.pdf | 6 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT-A JADE PARK.pdf | 6 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report - ''Jade Park''.pdf | 6 Dec 2024 |
| Other - TechnicalFile: ANNEXURE-A JADE PARK.pdf | 6 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Jade Park - PV_11zon.pdf | 6 Dec 2024 |
| Proforma of Agreement for saleFile: RERA AFS Phase II Vile Parle RERA upload version-PV.pdf | 6 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Abhishek T Doshi Disclosure.pdf | 6 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Bhavesh M Mehta Disclosure.pdf | 6 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Jayesh T Kothari Disclosure.pdf | 6 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Kumarpal Gandhi SBIIL.pdf | 6 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Mahendra L Mehta Disclosure.pdf | 6 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Rajan Shirvastav SBIIL.pdf | 6 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RRC VILE PARLE RISE.pdf | 6 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Suresh Kolhatkar SBIIL.pdf | 6 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Usha Mehta Disclosure.pdf | 6 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B-Jade Park.pdf | 6 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances ''Jade Park''-merged.pdf | 4 Dec 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances ''Jade Park''-merged.pdf | 4 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: 1 Other - Finance.pdf | 4 Dec 2024 |
| Building plan approvalFile: Wing J.pdf | 3 Dec 2024 |
| Building plan approvalFile: Wing I.pdf | 3 Dec 2024 |
| Building plan approvalFile: Wing H.pdf | 3 Dec 2024 |
| Building plan approvalFile: Wing G.pdf | 3 Dec 2024 |
| Building plan approvalFile: Wing F.pdf | 3 Dec 2024 |
| Building plan approvalFile: Wing D and E.pdf | 3 Dec 2024 |
| Building plan approvalFile: Wing C.pdf | 3 Dec 2024 |
| Building plan approvalFile: Parking Floors-Common.pdf | 3 Dec 2024 |
| Building plan approvalFile: LOI-Vile Parle.pdf | 3 Dec 2024 |
| Building plan approvalFile: Amended approval letter.pdf | 3 Dec 2024 |
| PAN CardFile: shreepati rise pan card.pdf | 3 Dec 2024 |
| Copy of the legal title reportFile: RERA Title Report-21112024.pdf | 3 Dec 2024 |
| Copy of the legal title reportFile: 1-50-TC.pdf | 3 Dec 2024 |
| Copy of the legal title reportFile: 51-100-TC.pdf | 3 Dec 2024 |
| Declaration in FORM BFile: Form B-Jade Park.pdf | 3 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: plinth CC 9916.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing J.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended approval letter.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: LOI-Vile Parle.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Parking Floors-Common.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing C.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing D and E.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing F.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing G.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing H.pdf | 3 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing I.pdf | 3 Dec 2024 |
| Declaration about Commencement CertificateFile: Commencement Certificate Jade Park.pdf | 3 Dec 2024 |
| CERSAI detailsFile: Cersai ''Jade Park''-merged.pdf | 3 Dec 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep JADE PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near At Swami vivekanand road6,700+ in Mumbai Suburban
CHANDAK VANSHAM
CHANDAK REALTORS PRIVATE LIMITED
AJOD ONE
AJOD REALTY LLP
GAUTAM DHAN
NEW INDIA CONSTRUCTIONS
AJMERA SHRINGAAR
H J CORPORATION
Imperial Landmark
Neminath and Disha Realtors
PINAL EVANA
Pinal Realty LLP
See every Mumbai Suburban project, with the district possession charts
Builder: SHREEPATI RISE ESTATE LLP
SHREEPATI RISE ESTATE LLP has 3 registrations on MahaRERA, including INSIGNIA and JADE PARK. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if JADE PARK is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of JADE PARK?
The registered promoter entity is SHREEPATI RISE ESTATE LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in JADE PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for JADE PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at JADE PARK?
The professionals named in the filing: Architect: B.N. SHAH & ASSOCIATES; Engineer: BHAGWAN SHINGALA; Chartered Accountant: Virag Shah; Chartered Accountant: VJ SHAH AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JADE PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback