Red flags

  • Litigation declared, 1 case
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 10%
1Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

JADE PARK 1 is a Others project by SHREEPATI RISE ESTATE LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078808 on 13 Jan 2025. Possession is promised by 31 Dec 2029. 1 complaint is on record with the regulator.

At a glance

Project

  • NameJADE PARK 1
  • TypeOthers
  • Location
    • Ansari Lane
    • At Swami Vivekanand Road
    • Andheri
    • Mumbai Suburban
    • 400056
  • Pincode400056
  • RERA no.P51800078808
  • ReraGenie IDRG-MH-23496

Builder

  • NameSHREEPATI RISE ESTATE LLP
  • Entity typeOthers
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jan 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA1916000
Wing ANA2016000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 10%.

Wing B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing A11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered87
BuildingClosed/CoveredTotal
Wing B4242
Wing A4545

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,386 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
VIDYA VINAY VIVEK CHS LTDMumbai CityMumbai City
MAN CHANDAK REALTY LLPChemburMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI69583.78
Proposed, not sanctioned12,092 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndusind House 425 Dadashaeb Bhadkamkar Marg Mumbai-400004

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantV J SHAH & CO
PartnerRole in project
SHREEPATI RISE ESTATE LLP-

Litigation declared1

CaseCourtStatus
3283/2023Dindoshi CourtPending

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12500445royce anthony misquittaSHREEPATI RISE ESTATE LLP10/02/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1-Architect Certificate.pdf22 Jun 2026
Form 2File: Form 2 Jade Park 1-31032026.pdf22 Jun 2026
Form 3File: SRLLP RERA JADE PARK 1-Form 3 A to B- 31032026.pdf22 Jun 2026
Disclosure of Sold and Booked InventoryFile: JadePark 1 - sold unsold 31032026.pdf22 Jun 2026
Form 1File: FORM-1-A to B Architect Certificate-31122025.pdf2 May 2026
Form 2File: FORM 2 - SRLLP RERA JADE PARK 1 - A to B- 31122025.pdf2 May 2026
Form 3File: FORM 3 - SRLLP RERA JADE PARK 1 - A to B- 31122025 - Final.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: JadePark 1 - sold unsold 31122025.pdf2 May 2026
Form 5 (FY 2024-2025)File: JADDE PARK-1-FORM-5-24 - 25 (1).pdf6 Jan 2026
Form 1File: Form 1-30092025.pdf27 Nov 2025
Form 2File: Form 2 - Jade Park 1 - 30092025.pdf27 Nov 2025
Form 3File: Form 3 - Jade Park 1 - 30092025.pdf27 Nov 2025
Disclosure of Sold and Booked InventoryFile: JadePark 1 - sold unsold 30092025.pdf27 Nov 2025
Form 1File: Architect Certificate Jade Park 1 - 30 06 2025.pdf18 Aug 2025
Form 2File: Form 2 Jade Park 1 - 30062025.pdf18 Aug 2025
Form 3File: Form 3 - Jade Park 1 - 30062025.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: JadePark 1 - sold unsold 30062025.pdf18 Aug 2025
Form 1File: Jade Park 1 - Form 3.pdf12 Jun 2025
Form 2File: jade park 1 - Form 2 - 31032025.pdf12 Jun 2025
Form 3File: Jade Park 1 - Form 3.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Jade Park 1-Sold unsold.pdf12 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JADE PARK A and B-16042025.pdf10 May 2025
Copy of the legal title reportFile: 101-151-TC.pdf27 Dec 2024
Copy of the legal title reportFile: 152-200-TC.pdf27 Dec 2024
Copy of the legal title reportFile: 201-250-TC.pdf27 Dec 2024
Copy of the legal title reportFile: 251-297-TC.pdf27 Dec 2024
Other - LegalFile: Legal-jade park-1.pdf27 Dec 2024
Building plan approvalFile: Section Wing Ato B sheet no 24.pdf13 Dec 2024
Building plan approvalFile: Wing B 1.pdf13 Dec 2024
Building plan approvalFile: Wing B.pdf13 Dec 2024
Building plan approvalFile: Area Diagram Cal- a to b.pdf13 Dec 2024
Building plan approvalFile: Wing A 3.pdf13 Dec 2024
Building plan approvalFile: Wing A 2.pdf13 Dec 2024
Building plan approvalFile: Wing A 1.pdf13 Dec 2024
Building plan approvalFile: Wing A.pdf13 Dec 2024
Building plan approvalFile: Basement 4.pdf13 Dec 2024
Building plan approvalFile: Basement 3.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Wing A 2.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Basement 3.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Basement 4.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Wing A.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Wing A 1.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Wing A 3.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Area Diagram Cal- a to b.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Wing B.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Wing B 1.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Section Wing Ato B sheet no 24.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-07012025-compressed.pdf6 Dec 2024
Other - LegalFile: PRC card_11zon.pdf6 Dec 2024
Proforma of Agreement for saleFile: RERA AFS RERA upload version PV.pdf6 Dec 2024
Proforma of Allotment letterFile: Protected Version-Allotment Letter Jade Park 1-05122024.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 wing AB.pdf5 Dec 2024
Other - TechnicalFile: ANNEXURE-A JADE PARK 1.pdf5 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report-AFS-Jade Park 1.pdf5 Dec 2024
Declaration in FORM BFile: Form B-Jade Park 1.pdf3 Dec 2024
Building plan approvalFile: Basement 2.pdf26 Nov 2024
Building plan approvalFile: Basement 1.pdf26 Nov 2024
Building plan approvalFile: Parking Floors-Common.pdf26 Nov 2024
Details of encumbrances concerned to FinanceFile: Finance-Encumbrances - Jade Park 1-merged.pdf26 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Parking Floors-Common.pdf26 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Basement 1.pdf26 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Basement 2.pdf26 Nov 2024
Details of encumbrances concerned to LegalFile: Finance-Encumbrances - Jade Park 1-merged.pdf26 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Jade Park1-Disclosure-finance-merged.pdf26 Nov 2024
Building plan approvalFile: LOI-Vile Parle.pdf25 Nov 2024
Layout approvalFile: Common Layout A and B.pdf25 Nov 2024
PAN CardFile: shreepati rise pan card.pdf25 Nov 2024
Copy of the legal title reportFile: RERA Title Report-21112024.pdf25 Nov 2024
Copy of the legal title reportFile: 1-50-TC.pdf25 Nov 2024
Copy of the legal title reportFile: 51-100-TC.pdf25 Nov 2024
Copy of Layout Approval (in case of layout)File: Common Layout A and B.pdf25 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: LOI-Vile Parle.pdf25 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Abhishek T Doshi Disclosure.pdf25 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Bhavesh M Mehta Disclosure.pdf25 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Jayesh T Kothari Disclosure.pdf25 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Mahendra L Mehta Disclosure.pdf25 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RRC VILE PARLE RISE.pdf25 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Kumarpal Gandhi SBIIL.pdf25 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Rajan Shirvastav SBIIL.pdf25 Nov 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JADE PARK 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near At Swami Vivekanand Road6,700+ in Mumbai Suburban

Builder: SHREEPATI RISE ESTATE LLP

SHREEPATI RISE ESTATE LLP has 3 registrations on MahaRERA, including INSIGNIA and JADE PARK. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if JADE PARK 1 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JADE PARK 1?

The registered promoter entity is SHREEPATI RISE ESTATE LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JADE PARK 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JADE PARK 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JADE PARK 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JADE PARK 1?

The professionals named in the filing: Chartered Accountant: V J SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JADE PARK 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JADE PARK 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JADE PARK 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.