Home / Browse projects / Mumbai Suburban, Maharashtra / Jade Gardens Tower B
Jade Gardens Tower B
RG-MH-78368 · RERA P51800033945 · Last updated on MahaRERA portal: 7 Jul 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Jade Gardens Tower B is a Residential / Group Housing project by JAIRAJHAPPYHOMES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033945 on 14 Mar 2022. The registration is recorded completed; possession was promised by 31 Oct 2025.
At a glance
Project
- NameJade Gardens Tower B
- TypeResidential / Group Housing
- Location
- Off Ramnarayan Narkar Marg
- Pant Nagar Ghatkopar East
- Kurla
- Mumbai Suburban
- 400075
- Pincode400075
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800033945
- ReraGenie IDRG-MH-78368
Builder
- NameJAIRAJHAPPYHOMES
- Entity typePartnership
- GSTIN27AAGFJ1600B2Z2
- PartnersUMANG DINESH KUWADIA, NARESH BHAVANJI CHHEDA, MUKESH VIJPAR NISHAR, JITESH KANTILAL JAIN
- Other registrations4 more →
- Completed4 of 5
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Mar 2022
- Promised completion31 Oct 2025
- Revised completionNone
- Buildings1 building record
- Documents filed59 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Jade Gardens Tower B | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
Jade Gardens Tower B: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities16
As on 7 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Fitness Centre | Yes | 0% |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| JADE GARDENS TOWER B FRIENDS CHSL | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Manoj Daisaria of Daisaria Associates |
| Architect | Ar Jayendra Patel of Spacious Designs Architects Pvt Ltd |
| Engineer | S N Apte & Co |
| Engineer | J W Consultants LLP |
| Chartered Accountant | Vinod S Mehta & Co |
| Chartered Accountant | Girish L Shethia Chartered Accountant |
| Partner | Role in project |
|---|---|
| JAIRAJHAPPYHOMES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Feb 2025
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: JHH-JG-Tower B-2425-Form5.pdf | 7 Jul 2025 |
| Occupational CertificateFile: 20241031 Full OC Letter Tower B JHH copy.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JG Tower B Architect Certificate 31122024.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JGB FORM3 for 31122024.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JG Tower B Engineer Certificate 31122024.pdf | 17 Apr 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Tower B Declaration for Society formation.pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: JG Tower B Soldunsold Inventory 31122024.pdf | 17 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20241031 Full OC Letter Tower B JHH copy.pdf | 27 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: JG Tower B Sold Unsold Inventory 300924.pdf | 24 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JGB Form3 30092024.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jade Gardens Tower B Form 1 Arct Cert for June 2024.pdf | 13 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JGB Form3 30062024.pdf | 13 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JG Tower B Form 2 June 2024.pdf | 13 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Tower B for 30062024.pdf | 13 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate Jade Gardens B Q1 300923.pdf | 23 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate Jade Gardens B Q2 310324.pdf | 23 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: JHH JGB Form5 31032024.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JGB Form3 31032024.pdf | 14 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Tower B for 31032024.pdf | 8 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JG Tower B Form 2 Engg Cert for 31032024.pdf | 8 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Tower B Sold-Unsold for Sept 2023.pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JG Tower B Form 3 for 311223.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JGB Form 3062023.pdf | 16 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: JHH JGB Form 5 FY March 2023.pdf | 23 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Full CC Plot B 04092023.pdf | 18 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower B Form 3 for March 2023.pdf | 10 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jade Gardens Tower B Form 1 Arct Cert for March 2022.pdf | 28 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jade Gardens Tower B Form 1 Arct Cert for June 2022.pdf | 28 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jade Gardens Tower B Form 1 Arct Cert for Sept 2022.pdf | 28 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jade Gardens Tower B Form 3 for Dec 2022.pdf | 24 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower B Form 3 for June.pdf | 18 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: JHH-JG-Tower B-Form5.pdf | 12 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH Tower B Form 3.pdf | 9 Aug 2022 |
| Proforma of Allotment letterFile: Proforma Agreement for Sale Tower B.pdf | 25 Feb 2022 |
| Proforma of Allotment letterFile: Proforma Allotment Letter Tower B.pdf | 25 Feb 2022 |
| Layout approvalFile: Declaration for No Layout Tower B.pdf | 24 Feb 2022 |
| Building plan approvalFile: IOA Letter Dt 13072021 Plot B.pdf | 24 Feb 2022 |
| Building plan approvalFile: Sheet 2.pdf | 24 Feb 2022 |
| Building plan approvalFile: Sheet 3.pdf | 24 Feb 2022 |
| Building plan approvalFile: Sheet 4.pdf | 24 Feb 2022 |
| Building plan approvalFile: Sheet 5.pdf | 24 Feb 2022 |
| Building plan approvalFile: Sheet 6.pdf | 24 Feb 2022 |
| PAN CardFile: JAIRAJ HAPPY HOMES PAN CARD.pdf | 24 Feb 2022 |
| PAN CardFile: JAIRAJ HAPPY HOMES PAN CARD.pdf | 24 Feb 2022 |
| Copy of the legal title reportFile: Title Certificate in Rera Format.pdf | 24 Feb 2022 |
| Details of encumbrancesFile: Self Declaration for Encrumbrances Plot B.pdf | 24 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Declaration for No Layout Tower B.pdf | 24 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA Letter Dt 13072021 Plot B.pdf | 24 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 2.pdf | 24 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 3.pdf | 24 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 4.pdf | 24 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 5.pdf | 24 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 6.pdf | 24 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Tower B.pdf | 24 Feb 2022 |
| Declaration about Commencement CertificateFile: CC Declaration for Plot B.pdf | 24 Feb 2022 |
| Declaration in FORM BFile: Form B Declaration Plot B.pdf | 24 Feb 2022 |
| Declaration in FORM BFile: Co-promoter Form B Declaration of Tower B-compressed.pdf | 24 Feb 2022 |
| CERSAI detailsFile: CERSAI Search Report TOWER B.pdf | 24 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Tower B.pdf | 24 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
Keep Jade Gardens Tower B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pant Nagar Ghatkopar East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 312 registered projects within 2 km.
THE VIEWS
AGNEL DEVELOPERS
THE VIEWS II
AGNEL DEVELOPERS
Drushti Emerald
SAMARTH DRUSHTI DEVELOPERS
East Syde
VL GAJAMUKH DEVELOPERS LLP
ROYAL ALTEZZA
SHRI GANESH DEVELOPERS
Damji Shamji Corporate Square - Wing C
Coronate Constructions
See every Mumbai Suburban project, with the district possession charts
Builder: JAIRAJHAPPYHOMES
JAIRAJHAPPYHOMES has 5 registrations on MahaRERA, including JADE AVENUE-Residential Wing and JADE GARDENS TOWER A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Jade Gardens Tower B is delayed beyond 31 Oct 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Jade Gardens Tower B?
The registered promoter entity is JAIRAJHAPPYHOMES, a partnership as per the filing. Its GSTIN 27AAGFJ1600B2Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Jade Gardens Tower B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Jade Gardens Tower B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Jade Gardens Tower B?
The professionals named in the filing: Architect: Ar Manoj Daisaria of Daisaria Associates; Architect: Ar Jayendra Patel of Spacious Designs Architects Pvt Ltd; Engineer: S N Apte & Co; Engineer: J W Consultants LLP; Chartered Accountant: Vinod S Mehta & Co; Chartered Accountant: Girish L Shethia Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Jade Gardens Tower B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback