Completed No litigation declared Commercial project

JADE AVENUE COMMERCIAL WING

By JAIRAJHAPPYHOMES

RG-MH-50872 · RERA P51900050274 · Last updated on MahaRERA portal: 10 Nov 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 90%
10 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 169 documents Report an error

JADE AVENUE COMMERCIAL WING is a Commercial project by JAIRAJHAPPYHOMES in Mumbai City, Maharashtra, registered with MahaRERA as P51900050274 on 1 Apr 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 9 months from the original filing. 15 of the 25 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameJADE AVENUE COMMERCIAL WING
  • TypeCommercial
  • Location
    • L N Road
    • B A Road
    • Bhimani Street
    • MATUNGA CENTRAL
    • Mumbai City
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900050274
  • ReraGenie IDRG-MH-50872

Builder

  • NameJAIRAJHAPPYHOMES
  • Entity typePartnership
  • GSTIN27AAGFJ1600B2Z2
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersUMANG DINESH KUWADIA, NARESH BHAVANJI CHHEDA, MUKESH VIJPAR NISHAR, JITESH KANTILAL JAIN
  • Other registrations4 more →
  • Completed4 of 5

Key dates

this monthRegisteredApr 2023First promiseJun 2025Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Apr 2023
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed169 files

Current status

60%15 of 25 units booked
97.9%Work done, per cost certificate

Figures as on 10 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JADE ARENANA10602525

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

JADE ARENA: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor25%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 10 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,237 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Sep 2025
LandownerVillageDistrict
NEW SAVITRI NIVAS CO-OPERATIVE HOUSING SOCIETY LTDMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1060.0
Proposed, not sanctioned1,060 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 Pal Residency Bhandarkar Road Matunga CR
Estimated costRs 29.30 cr
Cost incurredRs 28.68 cr
Work done97.88%
BuildingWingEstimatedIncurred
JADE ARENANARs 28.42 crRs 27.95 cr
-NARs 88.00 lakhRs 72.70 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM D Changani of B N Shah And Associates
ArchitectB N Shah And Associates
EngineerS N APTE & Co
Chartered AccountantGirish L Shethia
PartnerRole in project
JAIRAJHAPPYHOMES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900027994Jun 2025 → Mar 2026

Reason as filed by the promoterWe have received the MHADA NOC for OC and we have commence the OC procedure with BMC; accordingly we request for the extension for the above reasons.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed169

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 169 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC Pg1.pdf10 Nov 2025
Occupational CertificateFile: OC Pg2.pdf10 Nov 2025
Occupational CertificateFile: OC Pg3.pdf10 Nov 2025
Occupational CertificateFile: OC Pg4.pdf10 Nov 2025
Occupational CertificateFile: OC Pg5.pdf10 Nov 2025
Occupational CertificateFile: OC Pg6.pdf10 Nov 2025
Occupational CertificateFile: OC Pg7.pdf10 Nov 2025
Occupational CertificateFile: OC Pg8.pdf10 Nov 2025
Occupational CertificateFile: OC Pg9.pdf10 Nov 2025
Occupational CertificateFile: OC Pg10.pdf10 Nov 2025
Occupational CertificateFile: OC Pg11.pdf10 Nov 2025
Occupational CertificateFile: OC Pg12.pdf10 Nov 2025
Occupational CertificateFile: OC Pg13.pdf10 Nov 2025
Occupational CertificateFile: OC Pg14.pdf10 Nov 2025
Occupational CertificateFile: OC Pg15.pdf10 Nov 2025
Occupational CertificateFile: OC Pg16.pdf10 Nov 2025
Occupational CertificateFile: OC Pg17.pdf10 Nov 2025
Occupational CertificateFile: OC Pg18.pdf10 Nov 2025
Occupational CertificateFile: OC Pg19.pdf10 Nov 2025
Occupational CertificateFile: OC Pg20.pdf10 Nov 2025
Occupational CertificateFile: OC Pg21.pdf10 Nov 2025
Occupational CertificateFile: OC Pg22.pdf10 Nov 2025
Occupational CertificateFile: OC Pg23.pdf10 Nov 2025
Occupational CertificateFile: OC Pg24.pdf10 Nov 2025
Occupational CertificateFile: OC Pg25.pdf10 Nov 2025
Withdrawal Update Form 1File: JAC Arct Form 1 for 31032024.pdf20 Sep 2025
Withdrawal Update Form 2File: Engineer Certificate - Jade Avenue Commercial - 30-06-2025.pdf20 Sep 2025
Withdrawal Update Form 3File: JHH JAC Form3 30062025.pdf20 Sep 2025
Occupational CertificateFile: 2480405_Part OC_signed.pdf20 Sep 2025
Form 1File: Jade Avenue Commercial Architect Certificate 31032025.pdf12 Sep 2025
Form 2File: Jade Avenue Commercial Engineer Certificate 31032025.pdf12 Sep 2025
Form 3File: JHH JAC Form3 31032025.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Jade Avenue Commercial SoldUnsold Inventory 31032025.pdf12 Sep 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Jade Arena Name Reservation Letter - HH Copy.pdf28 May 2025
Form 1File: JA Commercial Architect Certificate 31122024.pdf28 May 2025
Form 2File: JA Commercial Engineer Certificate 31122024.pdf28 May 2025
Form 3File: JHH JAC FORM3 31122024.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: Jade Aveue Commercial Sold-unsold Inventory 31122024.pdf28 May 2025
Building plan approvalFile: Jade Avenue Comm 1st and 2nd Floor.pdf27 May 2025
Building plan approvalFile: Jade Avenue Comm 3rd Floor.pdf27 May 2025
Building plan approvalFile: Jade Avenue Comm Basement 1 and 2.pdf27 May 2025
Building plan approvalFile: Jade Avenue Comm Ground Floor.pdf27 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Jade Avenue Comm 1st and 2nd Floor.pdf27 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Jade Avenue Comm 3rd Floor.pdf27 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Jade Avenue Comm Basement 1 and 2.pdf27 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Jade Avenue Comm Ground Floor.pdf27 May 2025
Other - TechnicalFile: Jade Avenue Comm 1st and 2nd Floor.pdf27 May 2025
Other - TechnicalFile: Jade Avenue Comm 3rd Floor.pdf27 May 2025
Other - TechnicalFile: Jade Avenue Comm Basement 1 and 2.pdf27 May 2025
Other - TechnicalFile: Jade Avenue Comm Ground Floor.pdf27 May 2025
Other - TechnicalFile: 1st and 2nd Floor.pdf24 May 2025
Other - TechnicalFile: 3rd Floor.pdf24 May 2025
Other - TechnicalFile: Basement 1 and 2.pdf24 May 2025
Other - TechnicalFile: Ground Floor.pdf24 May 2025
Building plan approvalFile: Pg 1.pdf23 May 2025
Building plan approvalFile: Pg 2.pdf23 May 2025
Building plan approvalFile: Pg 3.pdf23 May 2025
Building plan approvalFile: Pg 4.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jade Avenue Commercial Architect Certificate 31032025.pdf23 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jade Avenue Commercial Engineer Certificate 31032025.pdf23 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Pg 1.pdf23 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Pg 2.pdf23 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Pg 3.pdf23 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Pg 4.pdf23 May 2025
Disclosure of sold/ booked inventoryFile: Jade Avenue Commercial SoldUnsold Inventory 31032025.pdf23 May 2025
Declaration in FORM BFile: Decalration Form B JHH.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JA Commercial Architect Certificate 31122024.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JAC FORM3 31122024.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JA Commercial Engineer Certificate 31122024.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Jade Aveue Commercial Sold-unsold Inventory 31122024.pdf25 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Jade Avenue Commercial Quality Assurance Certificate 30092024.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JAC Form3 092024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAC Form 1 June 2024.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JACForm 3062024.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JAC Comm Form 2 for June 2024.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: JAC Comm Soldunsold for 30062024.pdf11 Dec 2024
Other - LegalFile: Jade Arena Memebers Consent for amendment.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: JHH JAC Form5 31032024.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHH JAC Form3 March 2024.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAC Arct Form 1 for 31032024.pdf8 Jul 2024

How this compares with Mumbai City

60%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 9 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JADE AVENUE COMMERCIAL WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MATUNGA CENTRAL780+ in Mumbai City

2 kmJADE AVENUE COMMERCIAL WCompleted 90Lapsed / revoked 65Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 250 registered projects within 2 km.

Builder: JAIRAJHAPPYHOMES

JAIRAJHAPPYHOMES has 5 registrations on MahaRERA, including JADE AVENUE-Residential Wing and JADE GARDENS TOWER A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if JADE AVENUE COMMERCIAL WING is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JADE AVENUE COMMERCIAL WING?

The registered promoter entity is JAIRAJHAPPYHOMES, a partnership as per the filing. Its GSTIN 27AAGFJ1600B2Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JADE AVENUE COMMERCIAL WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JADE AVENUE COMMERCIAL WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JADE AVENUE COMMERCIAL WING?

The professionals named in the filing: Architect: M D Changani of B N Shah And Associates; Architect: B N Shah And Associates; Engineer: S N APTE & Co; Chartered Accountant: Girish L Shethia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JADE AVENUE COMMERCIAL WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JADE AVENUE COMMERCIAL WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JADE AVENUE COMMERCIAL WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.