Home / Browse projects / Pune, Maharashtra / ITREND LIFE PLUS

Registration lapsed No litigation declared Residential / Group Housing project

ITREND LIFE PLUS

By Manas Pearl Ventures

RG-MH-27694 · RERA P52100034723 · Last updated on MahaRERA portal: 20 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

ITREND LIFE PLUS is a Residential / Group Housing project by Manas Pearl Ventures in Pune, Maharashtra, registered with MahaRERA as P52100034723 on 20 Apr 2022. Possession was promised by 25 Mar 2025 and is now 19 months past that date. 2 complaints are on record with the regulator.

At a glance

Project

  • NameITREND LIFE PLUS
  • TypeResidential / Group Housing
  • Location
    • DUTT MANDIR ROAD
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034723
  • ReraGenie IDRG-MH-27694

Builder

  • NameManas Pearl Ventures
  • Entity typePartnership
  • PartnersSahil Sachin Garg, Manish Prakash Jain, Satish Kashmirilal Agarwal, Vineet Krishnakumar Goyal

Key dates

19 months past promisethis monthRegisteredApr 2022PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Apr 2022
  • Promised completion25 Mar 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA120000
B WingNA120000
C WingNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

A Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed219

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots219
Closed/Covered219
BuildingClosed/CoveredTotal
A Wing7373
B Wing7373
C Wing7373

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,735 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI18350.74
Proposed, not sanctioned18,351 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRADHESHAM ESTATE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architect
EngineerHarshal Wani
Chartered AccountantVinod Nikam & Co
Chartered AccountantBhandari SAAJ Associates
PartnerRole in project
Manas Pearl Ventures-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12400187Arun KhareManas Pearl Ventures22/09/2024
CC12400291Manas Pearl VenturesMs Kajal Jain01/10/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Manas perl venture.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certficate.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed (2).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Manas.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (2).pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Manas.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Manas.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate compressed.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Manas.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Summary Manas.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Manas.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Manas.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Manas.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Manas.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certiifcate Manas Final_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Manas Architect certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Life plus Engineer.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Manas Sold Unsold_compressed.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Manas.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certufucate.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (1).pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 LIFE PLUS.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Life Plus.pdf22 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Jun-23.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf30 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf30 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certficate.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Jun-23.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold_compressed.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed (1).pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept-23_compressed.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf3 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Life Plus - engineer certificate.pdf7 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Life Plus.pdf7 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Life Plus CA Certificate_compressed.pdf7 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200259347570_For_Asset_Based_Search_02_02_2023_17_27_41_056.pdf3 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations Vineet Sir.pdf2 Feb 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf30 Jan 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf30 Jan 2023
Proforma of Agreement for saleFile: Agreement to Sale.pdf30 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Account.pdf30 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with Allotment letter.pdf30 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with Agreement-Done.pdf30 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf28 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Managment Signed_compressed.pdf28 Jan 2023
PAN CardFile: PAN CARD.pdf12 Apr 2022
Declaration in FORM BFile: Form B (Revised).pdf12 Apr 2022
Layout approvalFile: HPSC1950- Layout.pdf8 Apr 2022
Building plan approvalFile: HPSC1942_compressed.pdf8 Apr 2022
Building plan approvalFile: HPSC1943_compressed.pdf8 Apr 2022
Building plan approvalFile: HPSC1944_compressed.pdf8 Apr 2022
Building plan approvalFile: HPSC1946_compressed.pdf8 Apr 2022
Building plan approvalFile: HPSC1947_compressed.pdf8 Apr 2022
Building plan approvalFile: HPSC1948- A wing.pdf8 Apr 2022
Copy of Layout Approval (in case of layout)File: HPSC1950- Layout.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC1942_compressed.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC1943_compressed.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC1944_compressed.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC1946_compressed.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC1947_compressed.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC1948- A wing.pdf8 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: S0T1000054_2204072223000 (4)_compressed.pdf8 Apr 2022
Declaration about Commencement CertificateFile: Rera Declaration.pdf8 Apr 2022
CERSAI detailsFile: CERSAI Letter.pdf8 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised Format_Manas Pearl_compressed.pdf8 Apr 2022
Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf8 Apr 2022
Proforma of Allotment letterFile: AGREEMENT.pdf8 Apr 2022
Copy of the legal title reportFile: Title Report_compressed.pdf21 Mar 2022
Details of encumbrancesFile: NE.pdf21 Mar 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ITREND LIFE PLUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmITREND LIFE PLUSCompleted 135Lapsed / revoked 48Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 257 registered projects within 2 km.

Builder: Manas Pearl Ventures

Manas Pearl Ventures has 1 registration on MahaRERA, including ITREND LIFE PLUS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that ITREND LIFE PLUS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ITREND LIFE PLUS is delayed beyond 25 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ITREND LIFE PLUS?

The registered promoter entity is Manas Pearl Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ITREND LIFE PLUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ITREND LIFE PLUS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ITREND LIFE PLUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ITREND LIFE PLUS?

The professionals named in the filing: Architect: Cubix Architect; Engineer: Harshal Wani; Chartered Accountant: Vinod Nikam & Co; Chartered Accountant: Bhandari SAAJ Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ITREND LIFE PLUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ITREND LIFE PLUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ITREND LIFE PLUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.