Home / Browse projects / Thane, Maharashtra / ISHWAR BLOSSOM
ISHWAR BLOSSOM
RG-MH-46283 · RERA P51700049361 · Last updated on MahaRERA portal: 17 Mar 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 18 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ISHWAR BLOSSOM is a Residential / Group Housing project by ISHWAR LIFESPACE in Thane, Maharashtra, registered with MahaRERA as P51700049361 on 7 Feb 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 18 months from the original filing. 4 of the 23 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameISHWAR BLOSSOM
- TypeResidential / Group Housing
- Location
- PLOT NO. 88
- CTS NO. 3786 AT SURYODAYA CO-OP SOCIETY
- KANSAI SECTION
- Ambarnath(M Cl)
- Ambarnath
- Thane
- 421501
- Pincode421501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700049361
- ReraGenie IDRG-MH-46283
Builder
- NameISHWAR LIFESPACE
- Entity typePartnership
- PartnersHARESH BHAJANLAL MATTA, PRADEEP NATHU CHAVAN, JAGDISH RAMA BANJAN, SHAMSUNDAR DATTATRAY KULTHE, SURESH DHANRAJ DHAMEJA
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Feb 2023
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 17 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ISHWAR BLOSSOM | NA | 7 | 7 | 23 | 0 | 23 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
ISHWAR BLOSSOM: 72% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed47
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SANJEEVANI CHANDRASHEKHAR DESHPANDE | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ISHWAR BLOSSOM | NA | Rs 3.60 cr | Rs 3.20 cr |
| - | NA | Rs 30.00 lakh | Rs 10.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRAMOD KAMBLE |
| Engineer | PRAMOD KAMBLE |
| Chartered Accountant | CHANCHLANI & ASSOCIATES |
| Chartered Accountant | VRP ASSOCIATIES |
| Partner | Role in project |
|---|---|
| ISHWAR LIFESPACE | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project is under construction & we have completed more than 75% work on the project. Despite our concerted efforts, we have encountered unforeseen challenges, namely a scarcity of essential construction materials and a shortage of skilled labor. there is a slight delay in finishing activities of the project. Under the above circumstance, we humbly request your honour to kindly grant extension of Project. The revised proposed date of completion as 30/12/2025 for our Project - “ISHWAR BLOSSOM” bearing Registration No. P51700049361
Reason as filed by the promoterThe project is under construction & we have completed more than 90% work on the project. Despite our concerted efforts, we have encountered unforeseen challenges, namely a scarcity of essential construction materials and a shortage of skilled labor. there is a slight delay in finishing activities of the project. Under the above circumstance, we humbly request your honour to kindly grant extension of Project. The revised proposed date of completion as 30/06/2026 for our Project - “ISHWAR BLOSSOM” bearing Registration No. P51700049361
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC.pdf | 17 Mar 2026 |
| Withdrawal Update Form 1File: arc blossom.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: Blossom Engineers Certificate Q3.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 SIGN.pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Signed Final FORM 3-.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Ishwar lifespace (blossom) SIGNED.pdf | 30 Sep 2025 |
| Declaration in FORM BFile: Form B 500.pdf | 26 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24 1.pdf | 26 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (Form 1)Ishwar Blossom.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate blossom.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Blossom.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R1 SIGN 311224 160425.pdf | 16 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf | 21 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: blossom architect cert 311224.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: blossom engineer cert 311224.pdf | 20 Jan 2025 |
| Declaration in FORM BFile: affidavit blossom.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate300924.pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 300924.pdf | 17 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: signed Form 5 IL Blossom.pdf | 29 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLOSSOM ARCHITECT Q1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Blossom Engineer Certificate.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Blossom Engineer's Certificate-31-3-23.pdf | 24 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ishwar Blossom Architect's Certificate.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Ishwar Blossom.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate blossom.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A IL BLOSSOM.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Ishwar Blossom Q2 Sold Unsold.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED CA CERTIFICATE 31-3-23.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED CA CERTIFICATE 30-6-23.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED CA CERTIFICATE 30-9-23.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Blossom 30-09-23.pdf | 14 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30-06-23.pdf | 14 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Blossom 30-09-23.pdf | 14 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_11zon.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Registration.pdf | 4 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Blossom 30-6-23.pdf | 4 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 31-03-23.pdf | 4 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng 31-03-23.pdf | 4 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng 30-06-23.pdf | 4 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 2 Sep 2023 |
| Copy of the legal title reportFile: Ownership Declaration.pdf | 28 Jan 2023 |
| Other - LegalFile: Power Of attorney part 1_11zon.pdf | 28 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance.pdf | 27 Jan 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance.pdf | 27 Jan 2023 |
| CERSAI detailsFile: Cersai Declaration.pdf | 27 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Haresh Matta.pdf | 27 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Jagdish Banjan.pdf | 27 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Pradeep Chavan.pdf | 27 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Shamsunder.pdf | 27 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Suresh Dhameja.pdf | 27 Jan 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 27 Jan 2023 |
| Proforma of Allotment letterFile: Allotment Deviation.pdf | 27 Jan 2023 |
| Layout approvalFile: MYSCAN_20100101_0015 BLOSSOMS.pdf | 19 Jan 2023 |
| Building plan approvalFile: MYSCAN_20100101_0015 BLOSSOMS.pdf | 19 Jan 2023 |
| Copy of the legal title reportFile: Legal Title.pdf | 19 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20100101_0015 BLOSSOMS.pdf | 19 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20100101_0015 BLOSSOMS.pdf | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED CA CERTIFICATE.pdf | 19 Jan 2023 |
| Proforma of Agreement for saleFile: Agreement Deviation.pdf | 19 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration-Ishwar Blossom.pdf | 22 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Agreement Deviation.pdf | 22 Dec 2022 |
| Declaration in FORM BFile: JAGDISH RAMA BANJAN AFFIDAVIT.pdf | 18 Nov 2022 |
| PAN CardFile: Pan Card.pdf | 12 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: SELF DECLARATION.pdf | 12 Nov 2022 |
| Details of encumbrances concerned to LegalFile: SELF DECLARATION.pdf | 12 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Ishwar Blossoms- Commencement Certificate.pdf | 12 Nov 2022 |
| Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE.pdf | 12 Nov 2022 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE ISHWAR LIFESPAPACE_11zon.pdf | 12 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Allotment Deviation.pdf | 12 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
Keep ISHWAR BLOSSOM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KANSAI SECTION7,600+ in Thane
Filed coordinates, straight-line distance. 202 registered projects within 2 km.
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
KRUSHNA VIHAR - PHASE I
KRUSHAN DHAM BUILDERS & DEVELOPERS
VISHWAJEET MYSPACE
GULABRAO BABURAO KARANJULE PATIL
KHATRI SPARSH
KHATRI REALTY
Tulsi Galaxy
Manas Associates
WALEKAR HOMES
WALEKAR & SON'S DEVELOPERS
See every Thane project, with the district possession charts
Builder: ISHWAR LIFESPACE
ISHWAR LIFESPACE has 2 registrations on MahaRERA, including ISHWAR KALYAN DHAM and ISHWAR BLOSSOM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if ISHWAR BLOSSOM is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ISHWAR BLOSSOM?
The registered promoter entity is ISHWAR LIFESPACE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ISHWAR BLOSSOM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ISHWAR BLOSSOM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ISHWAR BLOSSOM?
The professionals named in the filing: Architect: PRAMOD KAMBLE; Engineer: PRAMOD KAMBLE; Chartered Accountant: CHANCHLANI & ASSOCIATES; Chartered Accountant: VRP ASSOCIATIES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ISHWAR BLOSSOM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback