ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Iris Shopping

Completed No litigation declared Commercial project

Iris Shopping

By HIRANANDANI PROPERTIES PRIVATE LIMITED

RG-MH-37577 · RERA P51700019505 · Last updated on MahaRERA portal: 14 Jul 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 19 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 142 documents Report an error

Iris Shopping is a Commercial project by HIRANANDANI PROPERTIES PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700019505 on 6 Feb 2019. The registration is recorded completed; possession was promised by 18 Oct 2024. The completion date has moved by 19 months from the original filing.

At a glance

Project

  • NameIris Shopping
  • TypeCommercial
  • Location
    • Pokhran Road No II
    • Hiranandani Meadows
    • Thane (M Corp.)
    • Thane
    • 400610
  • Pincode400610
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700019505
  • ReraGenie IDRG-MH-37577

Builder

  • NameHIRANANDANI PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsNiranjan L Hiranandani, Surendra L Hiranandani
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2019First promiseMar 2023Revised toOct 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Feb 2019
  • Promised completion18 Oct 2024
  • Revised completionRevised to 18 Oct 2024 (originally 30 Mar 2023)
  • Buildings1 building record
  • Documents filed142 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Iris ShoppingNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Iris Shopping: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed53

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots53
Closed/Covered52
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area480 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2918.23
Proposed, not sanctioned2,868 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGalleria, Hiranandani Gardens, Powai, Mumbai 400076

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs. Sharmistha Mukerjee
EngineerEr. Cyrus Pithawalla
EngineerEr. Sanjib Nag
EngineerPrashant Tarmale
Chartered AccountantKHUSHAL BHEDA & CO
Chartered AccountantS H PATRAWALA & CO
Chartered AccountantUrvashi D. Maharshi
PartnerRole in project
HIRANANDANI PROPERTIES PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700013956Mar 2023 → Mar 2024

Reason as filed by the promoterWe have completed the construction of “Iris Shopping” having RERA registration number P51700019505 (project). We have obtained all the major building related necessary Licenses and NOC’s such as Lift License, CFO NOC, Tree NOC etc. and the same have been submitted to the Thane Municipal Corporation (TMC) . There is no pendency in terms of completion of the building. However, there are certain conditions mentioned in the CC vide V.P No.2003/07 TMC/TDD/143 dated 25-01-2018 which are related to the larger layout and not to the registered project . We have recently obtained favourable orders relat

EXT51700025513Mar 2023 → Oct 2024

Reason as filed by the promoterWe have completed the construction of ‘Iris Shopping’(Project). All the major building related necessary licences & NOCs such as lift licence, CFO NOC, Tree NOC etc. had been obtained before 29/03/2023 & submitted to Thane Municipal Corporation. A condition w.r.t other buildings forming part of the same layout was made part of the CC dt 25/01/2018 of the Project which was not related to the Project. We challenged the condition w.r.t. these buildings by filing Writ Petition No.12773 of 2022 in the Hon’ble High Court at Bombay. The Hon’ble Court by its Order dt 24/02/2023 was pleased to grant th

Litigation declared4

CaseCourtStatus
37/2017High Court of MumbaiDisposed Off
9230/2007High Court of Mumbaipending
22693/2019Supreme court of IndiaPending
92956 /2020High Court of Judicature at BombayPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jan 2025

Documents filed142

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Iris Shopping Form 2A Mar 25.pdf14 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IRIS SHOPPING Dec24.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 IRIS SHOPPING Dec24.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IRIS SHOPPING Dec24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Iris Shopping Inventory Update 09012025c.pdf10 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Iris Shopping Form 4.pdf8 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Iris Shopping OC.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A IRIS SHOPPING FY 24.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Iris Shopping Inventory Update 16102024c.pdf16 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Iris Shopping.pdf14 Oct 2024
Certificates of CA (Form 3)File: Iris Shopping_Form 3.pdf14 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 IRIS SHOPPING.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: IRIS SHOPPING FORM 5.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Iris shopping Inventory Update 24072024C.pdf26 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 IRIS.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IRIS.pdf20 Jul 2024
Certificates of CA (Form 3)File: Form 3 IRIS.pdf20 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Iris shopping.pdf19 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 IRIS SHOPPING Mar24.pdf19 Apr 2024
Certificates of CA (Form 3)File: Form 3 Irish Shopping March 24.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Iris Shopping RERA.pdf3 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Iris Shopping Block-6.pdf19 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRIS SHOPPING.pdf19 Jan 2024
Certificates of CA (Form 3)File: IRIS SHOPPING.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: RERA Iris Shopping Inventory Update as on 31122023.pdf5 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Iris Shopping.pdf12 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRIS SHOPPING FORM2.pdf12 Oct 2023
Certificates of CA (Form 3)File: Irish Shopping Form 3.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: IRIS SHOPPING.pdf29 Aug 2023
Disclosure of sold/ booked inventoryFile: HPPL Iris Shopping INVENTORY UPDATE 17072023.pdf17 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Iris Shopping secured.pdf11 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Iris shopping.pdf11 Jul 2023
Certificates of CA (Form 3)File: form 3 Iris shopping.pdf11 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Block no 6 (Iris Shopping).pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRIS Shopping - FORM-2-310323.pdf6 Apr 2023
Form 2AFile: IRIS Shopping - FORM-2A.pdf6 Apr 2023
Certificates of CA (Form 3)File: Iris Shopping 3 CA certificate 31032023.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.pdf18 Jan 2023
Disclosure of sold/ booked inventoryFile: Iris Shopping Update.pdf11 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Iris Shopping Form 1.pdf7 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRIS Shopping Form 2.pdf5 Jan 2023
Certificates of CA (Form 3)File: Iris Shopping CA.pdf5 Jan 2023
Disclosure of sold/ booked inventoryFile: HPPL RERA - Iris Shopping (7th Oct 2022)-signed.pdf7 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Iris Shopping Form 1.pdf4 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRIS SHOPPING Form 2.pdf4 Oct 2022
Certificates of CA (Form 3)File: Irish Shopping Form 3.pdf4 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Iris Shopping Form V.pdf1 Oct 2022
Annual Audit Report of Statutory CA (Form 5)File: Iris Shopping Form V.pdf19 Sep 2022
Other - FinanceFile: Iris Shopping Form V.pdf19 Sep 2022
Other - FinanceFile: HPPL Encumbrance Details (Iris Shopping ).pdf3 Aug 2022
Details of encumbrancesFile: HPPL Encumbrance Details (2).pdf30 Jul 2022
Disclosure of sold/ booked inventoryFile: HPPL RERA - Iris Shopping-signed.pdf8 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Iris Shopping.pdf5 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRIS SHOPPING.pdf5 Jul 2022
Form 2AFile: IRIS SHOPPING 2A.pdf5 Jul 2022
Certificates of CA (Form 3)File: Iris Shopping CA.pdf5 Jul 2022
Disclosure of sold/ booked inventoryFile: HPPL RERA upload - Iris Shopping.pdf19 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IRIS SHOPPING.pdf8 Apr 2022
Form 2AFile: Form 2A IRIS SHOPPING.pdf8 Apr 2022
Certificates of CA (Form 3)File: Form 3 Irish Shopping.pdf7 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Iris Shopping.pdf6 Apr 2022
Disclosure of sold/ booked inventoryFile: HPPL RERA upload (Iris Shopping).pdf7 Jan 2022
Certificates of CA (Form 3)File: Iris Shopping CA certificate.pdf4 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Iris Shopping.pdf3 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 IRIS SHOPPING.pdf3 Jan 2022
Form 2AFile: FORM 2A Iris Shopping.pdf3 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Iris Shopping.pdf4 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRIS SHOPPING.pdf4 Oct 2021
Form 2AFile: Iris Shopping Form 2A.pdf4 Oct 2021
Certificates of CA (Form 3)File: Iris Shopping CA.pdf4 Oct 2021
Status of ConveyanceFile: Iris Shopping Conveyance Letter.pdf16 Sep 2021
Details of encumbrancesFile: No encumbrance IRIS Shopping.pdf14 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form V Iris Shopping.pdf13 Sep 2021
Disclosure of sold/ booked inventoryFile: MAHA RERA IRIS SHOPPING.pdf1 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Iris Shopping.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRIS SHOPPING form 2.pdf12 Aug 2021
Form 2AFile: FORM 2A Iris shopping.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Iris shopping.pdf12 Aug 2021
Certificates of CA (Form 3)File: Irish Shopping CA.pdf12 Aug 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hiranandani MeadowsGladys Alwares Road Off Pokhran Road No 2 Thane West 400610570CompletedDec 2013Late, Jan 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 19 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Iris Shopping on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hiranandani Meadows7,600+ in Thane

2 kmIris ShoppingCompleted 166Lapsed / revoked 59Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 357 registered projects within 2 km.

Builder: HIRANANDANI PROPERTIES PRIVATE LIMITED

HIRANANDANI PROPERTIES PRIVATE LIMITED has 3 registrations on MahaRERA, including Iris and Amanda Shopping. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Iris Shopping is delayed beyond 18 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Iris Shopping?

The registered promoter entity is HIRANANDANI PROPERTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Iris Shopping?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Iris Shopping?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Iris Shopping?

The professionals named in the filing: Architect: Ms. Sharmistha Mukerjee; Engineer: Er. Cyrus Pithawalla; Engineer: Er. Sanjib Nag; Engineer: Prashant Tarmale; Chartered Accountant: KHUSHAL BHEDA & CO; Chartered Accountant: S H PATRAWALA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Iris Shopping?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Iris Shopping. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Iris Shopping to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.