Completed No litigation declared Residential / Group Housing project

IRIS A B AND K PHASE III

By JEETENDRA ALIAS RAVI AMARNATH KAPOOR

RG-MH-30677 · RERA P51700031029 · Last updated on MahaRERA portal: 8 May 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
25 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 95%
2Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

IRIS A B AND K PHASE III is a Residential / Group Housing project by JEETENDRA ALIAS RAVI AMARNATH KAPOOR in Thane, Maharashtra, registered with MahaRERA as P51700031029 on 1 Oct 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 2 complaints are on record with the regulator.

At a glance

Project

  • NameIRIS A B AND K PHASE III
  • TypeResidential / Group Housing
  • Location
    • VILLAGE GHODBUNDER
    • TALUKA THANE
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • RERA no.P51700031029
  • ReraGenie IDRG-MH-30677

Builder

  • NameJEETENDRA ALIAS RAVI AMARNATH KAPOOR
  • Entity typeIndividual
  • GSTIN27AAEPK1526B1ZA
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredOct 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Oct 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IRIS A WINGNA180000
IRIS B WINGNA180000
IRIS K WINGNA400000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 95%.

IRIS A WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
IRIS B WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
IRIS K WING95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor95%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 8 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingYes90%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered89
Open Space21
BuildingClosed/CoveredOpen SpaceTotal
IRIS A WING44549
IRIS B WING441054
IRIS K WING167

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area17,051 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2024

Approvals and building plan

Sanctioning authorityMira Bhayander Municipal Corporation
Permissible FSI17050.84
Proposed, not sanctioned17,051 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJUHU MUMBAI 400049

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANISH AND ASSOCIATES
EngineerYOGESH A JADHAV Jadhav
Chartered AccountantPRERANA GHAG & ASSOCIATES
Chartered AccountantESD & Associates LLP
PartnerRole in project
JEETENDRA ALIAS RAVI AMARNATH KAPOOR-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12600218SURESH KUMAR JHAJEETENDRA ALIAS RAVI AMARNATH KAPOOR12/01/2026
CC12600219SURESH KUMAR JHAJEETENDRA ALIAS RAVI AMARNATH KAPOOR12/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Mar 2025

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1 (1).pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Till OC for ABK.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Till OC for ABK_compressed.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Till OC for ABK.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold details ABK wings Jan 25 till OC_compressed.pdf22 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC 26 December 2024.pdf3 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC K wing.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate ABK Oct 24 to Dec 24_compressed.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate ABK Oct 24 to Dec 24_compressed.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate ABK Oct 24 to Dec 24_compressed.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Flat Sold Unsold details ABK Oct 24 to Dec 24_compressed.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ABK till Sep 2024 Engineers cert_.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A B K.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_ABK as on 30 September 24_compressed.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Flat sold unsold details as on 30th Sept 2024 ABK.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ABK till Sep 2024 Engineers cert_.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A B K.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_ABK as on 30 September 24_compressed.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Flat sold unsold details as on 30th Sept 2024 ABK.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A B K.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_ABK as on 30 September 24_compressed.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ABK till Sep 2024 Engineers cert_.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Flat sold unsold details as on 30th Sept 2024 ABK.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ABK Wing CA Certificate as on 30th June 2024 compressed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 3 ABK Wing CA Certificate as on 30th June 2024 compressed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FOR YEAR ENDED MARCH 2024.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: flat sold unsold details A B K as on 30th June 2024 compressed.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A B K 01 07 24.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate A B K 07 08 24.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance cert 2023 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ABK Wing CA Certificate as on 30th June 2024 compressed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 3 ABK Wing CA Certificate as on 30th June 2024 compressed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FOR YEAR ENDED MARCH 2024.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: flat sold unsold details A B K as on 30th June 2024 compressed.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A B K 01 07 24.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate A B K 07 08 24.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance cert 2023 2024.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A B K 01 07 24.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ABK Wing CA Certificate as on 30th June 2024 compressed.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate A B K 07 08 24.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: flat sold unsold details A B K as on 30th June 2024 compressed.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance cert 2023 2024.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 3 ABK Wing CA Certificate as on 30th June 2024 compressed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FOR YEAR ENDED MARCH 2024.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: J K Developers Part OC A B and I.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate till 24th April 2024.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ABK Engnrs Cert Till 31st March 2024_compressed.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: ABK sold unsold list till 31st March 2024_compressed.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ CA Certificate ABK_31st March 2024_compressed.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Combined List of sold unsold and unreg flats compressed.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate RERA CERTIFICATE compressed.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 24.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate ABK Till 31 DEC 2023_compressed.pdf7 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate 2021-2022.pdf2 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate 2022-2023.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 19th Oct 2023.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE 13th Oct 2023.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold_compressed.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3 A B K wings upto 30th Sept 2023.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022 to 2023.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cert 24th Aug 2023.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert 12th Aug 2023.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Unsold 30th June 2023 compressed.pdf6 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate upto 30th June 2023.pdf6 Sep 2023
Other - TechnicalFile: Certificate dated 18th May 2023.pdf30 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A and B wing 3rd Phase dated 18th May 2023 compressed.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate K wing 3rd Phase dated 18th May 2023 compressed.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert dated 15th May 2023.pdf29 May 2023
Disclosure of sold/ booked inventoryFile: Sold Booked details upto 31st March 2023 A B 3rd phase compressed.pdf29 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Rera Certificate ABK upto 31st March 2023 compressed.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ABK 23RD Feb 2023.pdf25 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate dated 31st Jan 2023 wing A B.pdf24 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate dated 31st Jan 2023 K wing.pdf24 Mar 2023
Disclosure of sold/ booked inventoryFile: Sold unsold details as on 31st Jan 23 phase 3.pdf24 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- C A Certificate ABK upto 31st Jan 2023.pdf24 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase III uptil 31st Oct 2022 compressed.pdf18 Feb 2023
Disclosure of sold/ booked inventoryFile: sold unsold details wings A B compressed.pdf24 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for wings A B and K 3rd phase.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Wings ABK 3rd Phase ---.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for ABK Oct 2022 ----.pdf17 Jan 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IRIS A B AND K PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALUKA THANE7,600+ in Thane

Builder: JEETENDRA ALIAS RAVI AMARNATH KAPOOR

JEETENDRA ALIAS RAVI AMARNATH KAPOOR has 3 registrations on MahaRERA, including IRIS MIRA ROAD E and IRIS MIRA ROAD EAST 2ND PHASE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if IRIS A B AND K PHASE III is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IRIS A B AND K PHASE III?

The registered promoter entity is JEETENDRA ALIAS RAVI AMARNATH KAPOOR, an individual as per the filing. Its GSTIN 27AAEPK1526B1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IRIS A B AND K PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against IRIS A B AND K PHASE III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for IRIS A B AND K PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IRIS A B AND K PHASE III?

The professionals named in the filing: Architect: ANISH AND ASSOCIATES; Engineer: YOGESH A JADHAV Jadhav; Chartered Accountant: PRERANA GHAG & ASSOCIATES; Chartered Accountant: ESD & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IRIS A B AND K PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IRIS A B AND K PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IRIS A B AND K PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.