Home / Browse projects / Mumbai Suburban, Maharashtra / IRENE WING B PHASE 1

Registered Litigation declared Residential / Group Housing project

IRENE WING B PHASE 1

By Sheth Creators and Sunvision Private Limited

RG-MH-41657 · RERA P51800047209 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 8 cases
  • 1 complaint at MahaRERA
  • Encumbrance declared on the project land, in favour of SBI Ventures Limited Formerly known as SBICAP Ventures Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 22%
135 of 386Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

IRENE WING B PHASE 1 is a Residential / Group Housing project by Sheth Creators and Sunvision Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047209 on 12 Oct 2022. Possession is promised by 31 Oct 2028. 251 of the 386 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameIRENE WING B PHASE 1
  • TypeResidential / Group Housing
  • Location
    • 18.30 MT.WIDE D.P ROAD
    • NEAR LIBERTY GARDEN MALAD WEST
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047209
  • ReraGenie IDRG-MH-41657

Builder

  • NameSheth Creators and Sunvision Private Limited
  • Entity typeCompany
  • DirectorsJitendra Natwarlal Sheth, Vallabh Natwarlal Sheth, Suraj Menghraj Shroff
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2022PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Oct 2022
  • Promised completion31 Oct 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed128 files

Current status

65%251 of 386 units booked
48.3%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IRENE WING B PHASE 1NA43313860386

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 22%.

IRENE WING B PHASE 1: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure22%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes-
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes-
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes11%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area588 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSBI Ventures Limited Formerly known as SBICAP Ventures Limited
CERSAI search filedYes
Declared on13 Feb 2026

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI22916.24
Proposed, not sanctioned15,997 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD UNIT NO 05 GRD FLOOR VASANT CENTRIA CTS 345 A1 TO 3 345A 5 MAKWANA ROAD MAROL MUMBAI MAHARASHTRA 400059
Estimated costRs 216.67 cr
Cost incurredRs 104.61 cr
Work done48.28%
BuildingWingEstimatedIncurred
IRENE WING B PHASE 1NARs 196.67 crRs 101.58 cr
-NARs 20.00 crRs 3.02 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSkyline Infrabuilt Consultant Pvt. Ltd
ArchitectARUN GURAV
EngineerOMPRAKASH PUROHIT
EngineerJW CONSULTANTS LLP
EngineerSHAILESH DINKAR NAIK
Chartered AccountantM B Agrawal & Co
Chartered AccountantS.M. GUPTA
Chartered AccountantSHANKER AND KAPANI CHARTERED ACCOUNTANTS
PartnerRole in project
Sheth Creators and Sunvision Private Limited-

Litigation declared8

CaseCourtStatus
7190/2016HIGH COURTPENDING
1162/2016CITY CIVIL COURTPENDING
1016/2012HIGH COURTPENDING
274/2016SESSION COURT BORIVALI DIVISIONPENDING
80/2010CHIEF METROPOLITAN MAGISTRATE COURT BORIVALIPENDING
SS/2400513/2010ADD CHIEF METROPOLITAN MAGISTRATE COURTPENDING
331/2018CITY CIVIL COURTPENDING
7190/2016HIGH COURTOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502317Kunal Kishor SaraiyaSheth Creators and Sunvision Private Limited09/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2028

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: IRENE FORM 01 MARCH 2026.pdf6 Jun 2026
Withdrawal Update Form 2File: IRENE FORM 02 MARCH 2026.pdf6 Jun 2026
Withdrawal Update Form 3File: IRENE FORM 03 MARCH 2026.pdf6 Jun 2026
Withdrawal Update Form 1File: IRENE FORM 01 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 1File: IRENE FORM 01 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 2File: IRENE FORM 02 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 2File: IRENE FORM 02 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 3File: IRENE FORM 03 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 3File: IRENE FORM 03 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 1File: Q3_Form1 DEC2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Q3_Form2 DEC2025.pdf17 Feb 2026
Withdrawal Update Form 3File: Q3_Form 3 DEC2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Irene B Form01 June 2025.pdf13 Nov 2025
Withdrawal Update Form 1File: Irene B Form01 June 2025.pdf13 Nov 2025
Withdrawal Update Form 2File: Form 2 SEP-25 TOWER-B.pdf13 Nov 2025
Withdrawal Update Form 2File: Form 2 SEP-25 TOWER-B.pdf13 Nov 2025
Withdrawal Update Form 3File: FORM 03 CORRECTED 30 SEP 2025.pdf13 Nov 2025
Withdrawal Update Form 3File: Form 3 30 06 2025 Corrected.pdf13 Nov 2025
Withdrawal Update Form 1File: Irene B Form01 June 2025.pdf17 Oct 2025
Withdrawal Update Form 1File: Irene B Form01 June 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 SEP-25 TOWER-B.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 SEP-25 TOWER-B.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 SEP 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 SEP 2025.pdf17 Oct 2025
Withdrawal Update Form 1File: Irene B Form01 June 2025.pdf14 Oct 2025
Withdrawal Update Form 1File: Irene B Form01 June 2025.pdf14 Oct 2025
Withdrawal Update Form 1File: Irene B Form01 June 2025.pdf14 Oct 2025
Withdrawal Update Form 2File: Irene B Form 2 June 2025.pdf14 Oct 2025
Withdrawal Update Form 2File: Irene B Form 2 June 2025.pdf14 Oct 2025
Withdrawal Update Form 2File: Irene B Form 2 June 2025.pdf14 Oct 2025
Withdrawal Update Form 3File: RERA Certificate -Tower- B_Irene Malad Project.pdf14 Oct 2025
Withdrawal Update Form 3File: RERA Certificate -Tower- B_Irene Malad Project.pdf14 Oct 2025
Withdrawal Update Form 3File: RERA Certificate -Tower- B_Irene Malad Project.pdf14 Oct 2025
Form 1File: Form 1 Tower - B 31 Dec 2022.pdf20 Aug 2025
Form 2File: Form 2 Tower B December 2022.pdf20 Aug 2025
Form 3File: Form 3 Dec 2022.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory Dec 2022.pdf20 Aug 2025
Form 1File: FORM 1 TOWER B JUNE 2023.pdf20 Aug 2025
Form 2File: FORM 2 TOWER B JUNE 2023.pdf20 Aug 2025
Form 3File: Form 3 Tower B 30 June 2023.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory June 2023.pdf20 Aug 2025
Form 1File: Form -1 TOWER -B 30 DEC-2023.pdf20 Aug 2025
Form 2File: Form 2 Tower B 31 December 2023.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory Dec 2023.pdf20 Aug 2025
Form 3File: Form 3 Tower-B As on 31 Dec-23-.pdf20 Aug 2025
Form 1File: Form 1 TOWER -B 30 March 2024.pdf20 Aug 2025
Form 2File: Form 2 Tower B 30 March 2024.pdf20 Aug 2025
Form 3File: Form 3 Tower-B As on 30 Mar-24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory March 2024.pdf20 Aug 2025
Form 1File: Form 1 TOWER -B 30 June 2024.pdf20 Aug 2025
Form 2File: Form 2 Tower B 30 June 2024.pdf20 Aug 2025
Form 3File: Form 3 Tower-B As on 30 June-24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory June 2024.pdf20 Aug 2025
Form 1File: Form 1 Tower B 30 Sept 2024.pdf20 Aug 2025
Form 2File: Form 2 Tower B 30 Sept 2024.pdf20 Aug 2025
Form 3File: Form 3 Tower-B As on 30 Sep-24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory Sept 2024.pdf20 Aug 2025
Form 1File: IRENE TOWER -B- 30 Sep 2023.pdf20 Aug 2025
Form 2File: Form 2 Tower B 30 Sept 2023.pdf20 Aug 2025
Form 3File: Form 3 Irene tower 3 30 Sept 2023.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory Sept 2023.pdf20 Aug 2025
Form 1File: Form 1 Tower B 30 Dec 2024.pdf20 Aug 2025
Form 2File: Form 2 Tower B 31 Dec 2024.pdf20 Aug 2025
Form 3File: Form 3 Irene Towe B 31 December 2024.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory Dec 2024.pdf20 Aug 2025
Form 1File: Form 1 Tower B 30 March 2025.pdf20 Aug 2025
Form 2File: Irene Form 2 March 2025.pdf20 Aug 2025
Form 3File: Form 3 Tower-B As on 30 Mar-25-.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold Inventory March 2025.pdf20 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 TOWER B JUNE 2023.pdf18 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 TOWER B JUNE 2023.pdf18 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TOWER B JUNE 2023.pdf18 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Tower B.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Tower B.pdf4 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 14 Irene Tower-B As on Sept-22 (1) (1).pdf2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Irene Tower - B.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate -Irene Dec-22 - Tower-B.pdf10 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 15 Irene Tower-B As on Dec-22.pdf10 Feb 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT COMMNETS 07 10 2022 LOW.pdf9 Oct 2022
Other - LegalFile: AGREEMENT FOR SALE IRENE TOWER B 09 10 2022.pdf9 Oct 2022

How this compares with Mumbai Suburban

65%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IRENE WING B PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR LIBERTY GARDEN MALAD WEST6,700+ in Mumbai Suburban

2 kmIRENE WING B PHASE 1Completed 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: Sheth Creators and Sunvision Private Limited

Sheth Creators and Sunvision Private Limited has 2 registrations on MahaRERA, including IRENE WING A PHASE 1 and IRENE WING B PHASE 1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if IRENE WING B PHASE 1 is delayed beyond 31 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IRENE WING B PHASE 1?

The registered promoter entity is Sheth Creators and Sunvision Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IRENE WING B PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against IRENE WING B PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for IRENE WING B PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IRENE WING B PHASE 1?

The professionals named in the filing: Architect: Skyline Infrabuilt Consultant Pvt. Ltd; Architect: ARUN GURAV; Engineer: OMPRAKASH PUROHIT; Engineer: JW CONSULTANTS LLP; Engineer: SHAILESH DINKAR NAIK; Chartered Accountant: M B Agrawal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IRENE WING B PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IRENE WING B PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IRENE WING B PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.