Red flags

  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 48 months from the original
5 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 80%
162 of 187Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 142 documents Report an error

Irasa Greens is a Others project by SUBURBAN SPACES LLP in Thane, Maharashtra, registered with MahaRERA as P51700005934 on 14 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing. 25 of the 187 units on this registration are recorded sold or booked, and 5 of 44 construction stages are filed complete.

At a glance

Project

  • NameIrasa Greens
  • TypeOthers
  • Location
    • Bhokari Road
    • Village Dohole
    • Dohole
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700005934
  • ReraGenie IDRG-MH-09043

Builder

  • NameSUBURBAN SPACES LLP
  • Entity typePartnership
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2023)
  • Buildings4 building records
  • Documents filed142 files

Current status

13%25 of 187 units booked
28.3%Work done, per cost certificate

Figures as on 28 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
3NA5560060
2NA5540040
1NA5540040
4NA55361147

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 80%.

336%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
25%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
120%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes75%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Open Space75
BuildingOpen SpaceTotal
31717
21717
12020
42121

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
NOORUDDIN TAMANNA N SHAIKHKhadavaliThane
SAYYED B SHAIKHKhadavaliThane

Approvals and building plan

Sanctioning authorityCollector Office Thane
Permissible FSI6979.14
Proposed, not sanctioned6,979 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPP GHANTALI MANDIR NAUPADA THANE WEST 400602
Estimated costRs 17.05 cr
Cost incurredRs 4.83 cr
Work done28.33%
BuildingWingEstimatedIncurred
3NARs 4.55 crRs 3.77 cr
2NARs 3.27 cr-
1NARs 3.27 crRs 35.35 lakh
4NARs 3.01 cr-
-NARs 2.94 crRs 70.07 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHIGH VISION & ASSOCIATES
EngineerHIGH VISION & ASSOCIATES
Chartered AccountantAshok Chandanshive & Co. Chartered Accountants
PartnerRole in project
SUBURBAN SPACES LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019082Dec 2023 → Dec 2025

Reason as filed by the promoterDue to unavoidable circumstances, promoter was not unable to complete project in time hence wants extension.

EA29042620772Dec 2023 → Dec 2027

Reason as filed by the promoter• The completion of the project has been delayed due to circumstances beyond the control of the promoter. The construction activities were affected by delays in approvals from concerned authorities, shortage of skilled manpower, and intermittent disruption in the supply of construction materials. Despite best efforts made by the promoter to adhere to the original timeline, these unforeseen factors have impacted the progress of the project. • The promoter is committed to completing the project at the earliest with maintained quality standards and therefore seeks an extension of the project comp

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed142

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: IRASA GREENS FORM 1 MARCH 2026.pdf28 May 2026
Withdrawal Update Form 2File: IRASA GREENS FORM 2 MARCH 2026.pdf28 May 2026
Withdrawal Update Form 3File: IRASA GREENS FORM 3 MARCH 2026.pdf28 May 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE IRASA GREENS DECEMBER 2025.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Q-3.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 Q - 3.pdf24 Apr 2026
Form 1File: form 1 irasa green june 2025.pdf10 Feb 2026
Form 2File: form 2 june 25 final_11zon.pdf10 Feb 2026
Form 3File: IRASA GREENS FORM 3 CA CERTIFICATE JUNE 2025 (1)_11zon.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Irasa Greens.pdf10 Feb 2026
Form 1File: IRASA GREENS FORM 1 ARCHITECT CERTIFICATE SEPTEMBER 2025.pdf10 Feb 2026
Form 2File: IRASA GREENS FORM 2 ENGENEER CERTIFICATE SEPTEMBER 2025.pdf10 Feb 2026
Form 3File: IRASA GREENS FORM 3 CA CERTIFICATE SEPTEMBER 2025_11zon (1).pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: IRASA GREENS SOLD UNSOLD SEPTEMBER 2025.pdf10 Feb 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf26 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf26 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec 24.pdf7 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Sep 24_compressed.pdf7 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Dec 24_compressed.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - Sep 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - Dec 24.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Irasa Green March 24.pdf20 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Irasa Green June 24.pdf20 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Irasa Green September 24.pdf20 Dec 2024
Certificates of CA (Form 3)File: Irasa Green- Form 3 June 24.pdf20 Dec 2024
Certificates of CA (Form 3)File: Irasa Green- Form 3 Sept 24.pdf20 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Irasa Green March 24.pdf20 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Irasa Green June 24.pdf20 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Irasa Green Septmeber 24.pdf20 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Irasa Green 2024.pdf20 Dec 2024
Certificates of CA (Form 3)File: form 3_Dec Latest Compressed.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Arbar Ahmed.pdf20 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest murlidharan.pdf20 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Shafique Ahmed.pdf20 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Parvez Alam.pdf20 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jan.pdf14 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June.pdf14 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept.pdf14 Feb 2024
Certificates of CA (Form 3)File: Form 3_Dec_compressed.pdf14 Feb 2024
Certificates of CA (Form 3)File: Form 3_June_compressed.pdf14 Feb 2024
Certificates of CA (Form 3)File: Form 3_Sept_compressed.pdf14 Feb 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Certificate.pdf13 Feb 2024
Details of encumbrances concerned to LegalFile: No Encumbrances Certificate.pdf13 Feb 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf13 Feb 2024
Declaration in FORM BFile: Form B.pdf13 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 2023.pdf13 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 2023.pdf13 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan 2024.pdf13 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Jun 2023.pdf13 Feb 2024
CERSAI detailsFile: Decalaration about CERSAI.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold, Unsold Jan 2024.pdf13 Feb 2024
Certificates of CA (Form 5)File: Form 5 FY 2021-22.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf13 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank Acc Details.pdf13 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE DOHLE 03-04-2023_compressed.pdf13 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate irasa green 24-03-2023_compressed.pdf13 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ENGINEER CERTIFICATE FORM 2A.pdf13 Apr 2023
Certificates of CA (Form 3)File: Form-3-IRASA Greens 15-03-2023_compressed.pdf13 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate irasa greens.pdf31 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IRASA GREENS ENGINEER CERTIFICATE_compressed.pdf31 Dec 2022
Certificates of CA (Form 3)File: Chartered Accountants_ Suburban Spaces LLP irasa greens.pdf31 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: irasa green engineer certificate 28 March 2022_compressed.pdf22 May 2022
Certificates of CA (Form 5)File: irasa green.pdf22 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: irasa green (3).pdf31 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate IRASA GREENS.pdf30 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate for irasa green .pdf30 Sep 2021
Certificates of CA (Form 3)File: c a certificate irasa green.pdf30 Sep 2021
Certificates of CA (Form 3)File: C ACERTIFICATE FOR IRASA GREEN.pdf5 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FOR IRASA GREEN.pdf30 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FOR IRASA PARK PHASE 2.pdf30 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE FOR IRASA GREEN_compressed.pdf30 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE FOR IRASA PARK PHASE 2-compressed.pdf30 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate-min.pdf31 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate-min.pdf31 Mar 2021
Certificates of CA (Form 5)File: Phase-3.pdf31 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf31 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf31 Dec 2019
Certificates of CA (Form 3)File: ca certificate.pdf31 Dec 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Rose GardensSurvey 220 Off Mumbai Nashik Highway Adjacent to Parivar Garden Hotel Asangaon West Taluka Shahapur District Thane 421301.181CompletedSep 2014Late, Mar 2015

How this compares with Thane

13%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 48 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Irasa Greens on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Dohole7,600+ in Thane

Builder: SUBURBAN SPACES LLP

SUBURBAN SPACES LLP has 3 registrations on MahaRERA, including Irasa Greens and Irasa Park Phase 1. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Irasa Greens is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Irasa Greens?

The registered promoter entity is SUBURBAN SPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Irasa Greens?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Irasa Greens?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Irasa Greens?

The professionals named in the filing: Architect: HIGH VISION & ASSOCIATES; Engineer: HIGH VISION & ASSOCIATES; Chartered Accountant: Ashok Chandanshive & Co. Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Irasa Greens?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Irasa Greens. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Irasa Greens to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.