Home / Browse projects / Thane, Maharashtra / IRA PEARL

Registration lapsed Litigation declared Residential / Group Housing project

IRA PEARL

By RONAK BUILDERS & DEVELOPERS

RG-MH-24688 · RERA P51700005549 · Last updated on MahaRERA portal: 18 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 9 months past the filed date
  • Litigation declared, 3 cases
  • 6 complaints at MahaRERA
  • Completion date moved by 49 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2026Possession promised9 months past this date
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
7 of 23Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

IRA PEARL is a Residential / Group Housing project by RONAK BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700005549 on 11 Aug 2017. Possession was promised by 31 Jan 2026 and is now 9 months past that date. The completion date has moved by 49 months from the original filing. 16 of the 23 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • NameIRA PEARL
  • TypeResidential / Group Housing
  • Location
    • plot 37
    • Nerul
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700005549
  • ReraGenie IDRG-MH-24688

Builder

  • NameRONAK BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnerVidya Jaiswal
  • Declared earlier projects1 →

Key dates

9 months past promisethis monthRegisteredAug 2017First promiseDec 2021Revised toJan 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Aug 2017
  • Promised completion31 Jan 2026
  • Revised completionRevised to 31 Jan 2026 (originally 2 Dec 2021)
  • Buildings1 building record
  • Documents filed57 files

Current status

70%16 of 23 units booked

Figures as on 18 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ira PearlNA221623023

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

Ira Pearl: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 18 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,275 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Snehabandh Co-operative Housing Society ltdNavi Mumbai (M Corp.)Thane
SOAMYA SHELTERS PVT LTDMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI1274.76
Proposed, not sanctioned1,275 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSEAWOODS NERUL

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATISH AHUJA AND ASSOCIATES
EngineerEPICONS
Chartered AccountantSumit Katariya KATARIYA
Chartered AccountantCRSagdeo
PartnerRole in project
RONAK BUILDERS & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019111Dec 2021 → Jan 2026

Reason as filed by the promoterApprovals pertaining to project were delayed, hence causing delay in the said project. Also, the project was significantly affected by the COVID-19 pandemic, including lockdowns, supply chain disruptions, labor shortages, and financial challenges. I being the promoter of said project, most respectfully submit that I have discussed the issues causing delay of the project with the Allottees and have acquired 73.33% i.e more than 51.00% of consent from the Allottees and hence applying for extension of the project u/s 7(3). Same has been attached in the application.

Litigation declared3

CaseCourtStatus
200414/2015Special Civil Suit THANEPENDING
CCT39/2015COOPERATIVE COURT THANEPENDING
200414/2015ThaneOngoing

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000022899Sheshrao BhongadeRonak Builders and developers30/01/2018
CC006000000078830S. ThirumalairajanRonak Builders and Developers09/04/2019
CC006000000078951Prashant Sakharam MoreRonak Builders and Developers18/04/2019
CC006000000079021Mrs Leela PauloseRonak Builders and Developers24/04/2019
CC006000000209929Mr Sheshrao Mukundrao Bhongade & Mr Amol Sheshrao BhongadeRonak Builders and Developers06/02/2022
CC006000000480222RONAK BUILDERS DEVELOPERSS M BHOGADE29/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement Certificates / NA Order for plotted developmentFile: Plinth NOC Ronak.pdf18 Feb 2025
Other - TechnicalFile: Plinth NOC Ronak.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Saomya .pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold Inventory.pdf22 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 (Saomya).pdf18 Mar 2024
Declaration in FORM BFile: Form B (Somya) updated.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold Inventory.pdf12 Mar 2024
Certificates of CA (Form 3)File: Form 3 (Somya).pdf12 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023-24.pdf8 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023-24.pdf8 Mar 2024
Declaration in FORM BFile: Ronak Aff FORM B_compressed.pdf13 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM A Seperate Bank Account details.pdf13 Feb 2024
Deviation Report with respect to Allotment letterFile: No Deviation (Allotment Letter) 2.pdf13 Feb 2024
CERSAI detailsFile: CERSAI Declaration.pdf4 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM A Seperate Bank Account details.pdf4 Feb 2024
Deviation Report with respect to Allotment letterFile: No Deviation (Allotment Letter).pdf4 Feb 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation (Agreement of Sale).pdf4 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (2021-2022).pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (2022-2023).pdf26 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf25 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf25 Dec 2023
Declaration about Commencement CertificateFile: Commencement Certificate Declaration.pdf25 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate on Quality Assurance 2021-22.pdf25 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate on Quality Assurance 2022-23.pdf25 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold Inventory.pdf25 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Order No 39.pdf25 Dec 2023
Proforma of Agreement for saleFile: Peforma Agreement to sale.pdf25 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate Form 2A.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 (2019).pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 (2020).pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 (2021).pdf30 Jul 2021
Details of Restarting of Construction work post lockdownFile: Engineer Certificate 2021.pdf30 Jul 2021
PAN CardFile: Ronak Pan Card.pdf28 Nov 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate Form 2A.pdf28 Nov 2019
Certificates of CA (Form 5)File: Form 5.pdf22 May 2019
Certificates of CA (Form 5)File: Form 5 18.pdf22 May 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate.PDF22 May 2019
Layout approvalFile: 44.pdf31 Jul 2017
Layout approvalFile: 55.pdf31 Jul 2017
Layout approvalFile: 11.pdf31 Jul 2017
Layout approvalFile: 33.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate 37.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrances Letter 37.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 11.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 33.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 44.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 55.pdf31 Jul 2017
Declaration in FORM BFile: Form B.PDF31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 CA.pdf31 Jul 2017
Proforma of Allotment letterFile: AGREEMENT TO SALE 37.pdf28 Jul 2017
Building plan approvalFile: 12.pdf27 Jul 2017
Layout approvalFile: 22.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: 22.pdf27 Jul 2017
Building Plan Approval (IOD)File: 12.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 37CC1.pdf27 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SEAWOODS HEIGHTP51700007564Nerul, Thane31Aug 2017OngoingJan 2026Registered original: Jan 2022Not delivered

How this compares with Thane

70%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 49 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IRA PEARL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nerul7,600+ in Thane

2 kmIRA PEARLCompleted 44Lapsed / revoked 17Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 108 registered projects within 2 km.

Builder: RONAK BUILDERS & DEVELOPERS

RONAK BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including IRA PEARL. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that IRA PEARL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if IRA PEARL is delayed beyond 31 Jan 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IRA PEARL?

The registered promoter entity is RONAK BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IRA PEARL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against IRA PEARL?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for IRA PEARL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IRA PEARL?

The professionals named in the filing: Architect: SATISH AHUJA AND ASSOCIATES; Engineer: EPICONS; Chartered Accountant: Sumit Katariya KATARIYA; Chartered Accountant: CRSagdeo. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IRA PEARL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IRA PEARL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IRA PEARL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.