Home / Browse projects / Thane, Maharashtra / Infinity Tower

Registered No litigation declared Others project

Infinity Tower

By Koperkhairane - The Address CO Operative Housing Society Limited

RG-MH-54577 · RERA P51700018969 · Last updated on MahaRERA portal: 7 Nov 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 96 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2032Possession promisedmoved 96 months from the original
6 of 11Construction stages donefurthest along: Excavation, 90%
7 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 182 documents Report an error

Infinity Tower is a Others project by Koperkhairane - The Address CO Operative Housing Society Limited in Thane, Maharashtra, registered with MahaRERA as P51700018969 on 17 Dec 2018. Possession is promised by 31 Dec 2032. The completion date has moved by 96 months from the original filing. 64 of the 71 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameInfinity Tower
  • TypeOthers
  • Location
    • Plot No 12 & 13 Sector 2A
    • Koperkhairane
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700018969
  • ReraGenie IDRG-MH-54577

Builder

  • NameKoperkhairane - The Address CO Operative Housing Society Limited
  • Entity typeSociety
  • ChairpersonPankaj Dineshkumar Pasoria
  • SecretoryVishal Gulshan Chanda

Key dates

this monthRegisteredDec 2018First promiseDec 2024Revised toDec 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Dec 2018
  • Promised completion31 Dec 2032
  • Revised completionRevised to 31 Dec 2032 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed182 files

Current status

90%64 of 71 units booked
38.8%Work done, per cost certificate

Figures as on 7 Nov 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Infinity TowerNA231971071

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

Infinity Tower: 87% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)90%
Plinth90%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed288

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots288
Closed/Covered287
Open Space1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,725 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Mar 2026

Approvals and building plan

Sanctioning authorityNAVI MUMBAI MUNICIPAL CORPORATION
Permissible FSI5583.7
Proposed, not sanctioned3,725 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMahavir Centre Sector 17 Vashi
Estimated costRs 107.75 cr
Cost incurredRs 41.83 cr
Work done38.83%
BuildingWingEstimatedIncurred
Infinity TowerNARs 107.75 crRs 41.83 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH RC ARCHITECTS
EngineerSAGAR UPPAL
EngineerCSE CONSULTANTS
Chartered AccountantJB PATEL & ASSOCIATES
Chartered AccountantMANISH K RAMAWATI & COMPANY
Chartered AccountantSANDESH GHODKE AND ASSOCIATES
PartnerRole in project
Koperkhairane - The Address CO Operative Housing Society Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24082622372Dec 2024 → Dec 2032

Reason as filed by the promoterThe project scope was expanded after registration with six additional floors in Wing ‘A’ and the proposed development of Wing ‘B’, requiring revised plans, additional approvals, and substantial construction work. The additional construction in Wing ‘A’ required Environmental Clearance, which was delayed due to a prolonged stay, affecting the project timeline. As a result of the expanded scope, additional statutory approvals, and delay in Environmental Clearance, the project could not be completed within the original timeline. The work is currently in progress and the Promoter is making efforts

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2032

Documents filed182

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 182 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf7 Nov 2026
Withdrawal Update Form 1File: Form 1.pdf7 Nov 2026
Withdrawal Update Form 1File: Form 1.pdf7 Nov 2026
Withdrawal Update Form 2File: Form 2.pdf7 Nov 2026
Withdrawal Update Form 2File: 2026 06 06 Form 2_Infinity Tower ONLH.pdf7 Nov 2026
Withdrawal Update Form 2File: Form 2.pdf7 Nov 2026
Withdrawal Update Form 3File: Form 3.pdf7 Nov 2026
Withdrawal Update Form 3File: Form 3 Infinity Tower 31-3-26.pdf7 Nov 2026
Withdrawal Update Form 3File: Form-3.pdf7 Nov 2026
Form 2A (FY 2025-2026)File: form 2a.pdf7 Nov 2026
Form 5 (FY 2025-2026)File: FORM 5 SIGNED FINAL FORM.pdf16 Oct 2026
Withdrawal Update Form 1File: form 1.pdf10 Oct 2026
Withdrawal Update Form 1File: form 1.pdf10 Oct 2026
Withdrawal Update Form 1File: form 1.pdf10 Oct 2026
Withdrawal Update Form 1File: Form-1.pdf10 Oct 2026
Withdrawal Update Form 1File: Form-1.pdf10 Oct 2026
Withdrawal Update Form 1File: Form-1.pdf10 Oct 2026
Withdrawal Update Form 2File: Form2June2025Infinity.pdf10 Oct 2026
Withdrawal Update Form 2File: Form2June2025Infinity.pdf10 Oct 2026
Withdrawal Update Form 2File: Form2June2025Infinity.pdf10 Oct 2026
Withdrawal Update Form 2File: Form2June2025Infinity.pdf10 Oct 2026
Withdrawal Update Form 2File: 609A_02_Form 2_Infinity Tower onlh 18 02 2026 Signed.pdf10 Oct 2026
Withdrawal Update Form 2File: 609A_02_Form 2_Infinity Tower onlh 18 02 2026 Signed.pdf10 Oct 2026
Withdrawal Update Form 3File: Form-3_INFINITY TOWER_30-06-2025.pdf10 Oct 2026
Withdrawal Update Form 3File: Form-3_INFINITY TOWER_30-06-2025.pdf10 Oct 2026
Withdrawal Update Form 3File: Form-3_INFINITY TOWER_30-06-2025.pdf10 Oct 2026
Withdrawal Update Form 3File: Form 3 Infinity Tower 31-3-26.pdf10 Oct 2026
Withdrawal Update Form 3File: Form 3 Signed Final.pdf10 Oct 2026
Withdrawal Update Form 3File: Form 3 Signed Final.pdf10 Oct 2026
Form 5 (FY 2024-2025)File: Form 5_Infinity Tower_FY 2024-25.pdf31 Oct 2025
Form 1File: Form 1 - Dec 24.pdf23 Sep 2025
Form 1File: FORM 1.pdf23 Sep 2025
Form 1File: ArchitectCertInfinityTowerJune24.pdf23 Sep 2025
Form 2File: Form2InfinityTowerDec2024.pdf23 Sep 2025
Form 2File: Form2InfinityTowerSept24.pdf23 Sep 2025
Form 2File: Form2InfinityTowerJune24.pdf23 Sep 2025
Form 3File: Form 3- Infinity Tower- Q3.pdf23 Sep 2025
Form 3File: form 3.pdf23 Sep 2025
Form 3File: FORM 3 Infinity Tower July 2024.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: SoldUnsoldInfinityTowerDec2024.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: InfinityTowerSoldUnsoldJune24.pdf23 Sep 2025
Certificates of CA (Form 3)File: INFINITY TOWER FORM 3_31-03-2025_Signed.pdf17 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2InfinityTowerDec2024.pdf17 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 Infinity 31st march2025 (1).pdf17 May 2025
Disclosure of sold/ booked inventoryFile: SoldUnsoldInfinityTowerDec2024.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: SoldUnsold Inventory till 31st March 2025.pdf17 May 2025
Declaration in FORM BFile: Form B rule3(6) affidavit cum declaration.pdf13 May 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC updated.pdf13 May 2025
Other - TechnicalFile: PERT CHART.pdf13 May 2025
Declaration in FORM BFile: Form B Infinity Tower.pdf22 Apr 2025
Certificates of CA (Form 3)File: Form 3,,,.pdf22 Apr 2025
CERSAI detailsFile: cersai undertaking.pdf22 Apr 2025
Deviation Report with respect to Allotment letterFile: No deviation from model allotment letter infinity.pdf22 Apr 2025
Other - TechnicalFile: Annexure A.pdf22 Apr 2025
Deviation Report with respect to model copy of AgreementFile: No deviation from agreement of sale letter infinity.pdf22 Apr 2025
Proforma of Agreement for saleFile: Model AFS of MahaRERA 2.pdf22 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest Vishal.pdf22 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Pankaj Dineshkumar Pasoria INTEREST IN OTHER REAL ESTATE PROEJCT.pdf22 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Mar 25.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf5 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec 24.pdf3 Feb 2025
Certificates of CA (Form 3)File: Form3InfinityTowerSept2024 signed by manish sir.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 infinity tower 23-24.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf4 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2InfinityTowerSept24.pdf3 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2InfinityTowerJune24.pdf20 Jul 2024
Certificates of CA (Form 3)File: Form3DeclarationJune2024.pdf18 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ArchitectCertInfinityTowerJune24.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: InfinityTowerSoldUnsoldJune24.pdf17 Jul 2024
Certificates of CA (Form 3)File: Form 3 declaration 1.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: SoldUnsoldInfinityTowerMarch2024.pdf11 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ArchitectCertificateInfinityTowerMarch24.pdf10 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2InfinityTowerMarch24.pdf10 Apr 2024
Disclosure of sold/ booked inventoryFile: SoldUnsoldInfinityTowerMarch2024.pdf10 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2InfinityTower31122023.pdf22 Jan 2024

How this compares with Thane

90%of this project is bookeddistrict median 24%
25%of Thane projects moved their completion datethis one moved by 96 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,700+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Infinity Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Koperkhairane7,700+ in Thane

2 kmInfinity TowerCompleted 29Lapsed / revoked 9Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 71 registered projects within 2 km.

Builder: Koperkhairane - The Address CO Operative Housing Society Limited

Koperkhairane - The Address CO Operative Housing Society Limited has 1 registration on MahaRERA, including Infinity Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Infinity Tower is delayed beyond 31 Dec 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Infinity Tower?

The registered promoter entity is Koperkhairane - The Address CO Operative Housing Society Limited, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Infinity Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Infinity Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Infinity Tower?

The professionals named in the filing: Architect: RAJESH RC ARCHITECTS; Engineer: SAGAR UPPAL; Engineer: CSE CONSULTANTS; Chartered Accountant: JB PATEL & ASSOCIATES; Chartered Accountant: MANISH K RAMAWATI & COMPANY; Chartered Accountant: SANDESH GHODKE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Infinity Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Infinity Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Infinity Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.