ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / INFINITY IKON

Registered No litigation declared Commercial project

INFINITY IKON

By EMPERIA PROJECTS

RG-MH-29838 · RERA P51700029339 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Stilt Floor, 60%
387 of 576Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

INFINITY IKON is a Commercial project by EMPERIA PROJECTS in Thane, Maharashtra, registered with MahaRERA as P51700029339 on 18 May 2021. Possession is promised by 31 Dec 2026. 189 of the 576 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameINFINITY IKON
  • TypeCommercial
  • Location
    • TTC INDUSTRIAL AREA NERUL MIDC
    • SHIRAVANE NAVI MUMBAI
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700029339
  • ReraGenie IDRG-MH-29838

Builder

  • NameEMPERIA PROJECTS
  • Entity typePartnership
  • PartnersANUJ GANESHNANDAN TIWARI, KALIMULLAH NAUSHAD MOHAMMAD AMJAD ALI, SANAULLAH IRSHAD AMJAD ALI SARWAR, K R JAIRAM K V RAMA SUBRAMNIAN

Key dates

this monthRegisteredMay 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 May 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

33%189 of 576 units booked
31.3%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EMPERIA ICONNA38380576576

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 60%.

EMPERIA ICON: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor60%
Slabs of Super Structure57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed306

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots306
Closed/Covered306

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,050 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jun 2025

Approvals and building plan

Sanctioning authorityMaharashtra Industrial Development Corporation
Permissible FSI25515.0
Proposed, not sanctioned24,328 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchkamothe tal panvel dist raigad
Estimated costRs 135.00 cr
Cost incurredRs 42.22 cr
Work done31.27%
BuildingWingEstimatedIncurred
EMPERIA ICONNARs 121.50 crRs 38.00 cr
-NARs 13.50 crRs 4.22 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectD G SHAH AND ASSOCIATES
EngineerCSE CONSULTANTS CONSULTING ENGINEERS RAJESH N SHAH
Chartered AccountantR B SINGH AND ASSOCIATES
PartnerRole in project
EMPERIA PROJECTS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM NO 1 OCT-DEC-2025 SIGNED.pdf24 Jun 2026
Withdrawal Update Form 1File: FORM NO 1 SIGNED_compressed.pdf24 Jun 2026
Withdrawal Update Form 2File: FORM 2 OCT-DEC-2025 SIGNED.pdf24 Jun 2026
Withdrawal Update Form 2File: CSE consultant form 2.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3 _SEPT-2025 (1).pdf24 Jun 2026
Withdrawal Update Form 3File: Form-3 Emperia Projectmarch 2026.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf21 Nov 2025
Withdrawal Update Form 2File: FORM 2 SEPT-2025.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 _SEPT-2025 (1).pdf21 Nov 2025
Layout approvalFile: 1.pdf25 Sep 2025
Building plan approvalFile: 1.pdf25 Sep 2025
Building plan approvalFile: 2.pdf25 Sep 2025
Building plan approvalFile: 3.pdf25 Sep 2025
Building plan approvalFile: 4.pdf25 Sep 2025
Building plan approvalFile: 5.pdf25 Sep 2025
Building plan approvalFile: 6.pdf25 Sep 2025
Building plan approvalFile: 7.pdf25 Sep 2025
Building plan approvalFile: 8.pdf25 Sep 2025
Building plan approvalFile: 9.pdf25 Sep 2025
Building plan approvalFile: Sanction Plan_1-1.pdf20 Aug 2025
Building plan approvalFile: Sanction Plan_1-1.pdf5 Aug 2025
Building plan approvalFile: Sanction Plan_2-2.pdf5 Aug 2025
Building plan approvalFile: Sanction Plan_3-3.pdf5 Aug 2025
Building plan approvalFile: Sanction Plan_4-4.pdf5 Aug 2025
Building plan approvalFile: Sanction Plan_5-5.pdf5 Aug 2025
Building plan approvalFile: Sanction Plan_6-6.pdf5 Aug 2025
Building plan approvalFile: Sanction Plan_7-7.pdf5 Aug 2025
Building plan approvalFile: Sanction Plan_8-8.pdf5 Aug 2025
Building plan approvalFile: Sanction Plan_9-9.pdf5 Aug 2025
Building plan approvalFile: PLAN COPY TILL 38TH FLOOR-1.pdf25 Jul 2025
Form 1File: FORM 1 - OCT TO DEC 2024.pdf9 Jun 2025
Form 2File: FORM 2- FTQ-DEC-2024_compressed.pdf9 Jun 2025
Form 3File: Form 3 DEC 2024_compressed.pdf9 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD-BOOKED-INVENTORY QTR DEC-2024.pdf9 Jun 2025
Self-declaration of Quarterly ProgressFile: SELE DECLARATION DT 14-1-2025.pdf9 Jun 2025
Form 1File: FORM 1 - JAN TO MAR 2025.pdf9 Jun 2025
Form 2File: FORM 2- FTQ MARCH 2025_compressed.pdf9 Jun 2025
Form 3File: Form 3 MAR-2025_compressed.pdf9 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER OF SOLD-BOOKED-INVENTORY QTR MARCH 25.pdf9 Jun 2025
Self-declaration of Quarterly ProgressFile: SELE DECLARATION DT 18-4-2025.pdf9 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: ccc copy compressed.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: cc drawing_1.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: cc drawing_2.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: cc drawing_3.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: cc drawing_4.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: cc drawing_5.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: cc drawing_6.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: cc drawing_7.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: cc drawing_8.pdf11 Mar 2025
Declaration about Commencement CertificateFile: 2 Format - D (Declaration of CC)[1].pdf11 Mar 2025
Other - LegalFile: Letter of Authority.pdf25 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Real Estate Organizations.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory_11zon.pdf23 Oct 2024
Other - LegalFile: RETIREMENT DEED - converted.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MAR-2024.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2024.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-06-2024.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-BOOKED INVENTORY (2).pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7.pdf18 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Emperia Projects - Architect Certificate as on 31-12-2023.pdf3 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_UPLOAD.pdf3 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM- 5 EMPERIA PROJECTS.pdf3 Mar 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - EMPERIA PROJECTS.pdf4 May 2021
Declaration in FORM BFile: FORM B - EMPERIA PROJECTS.pdf4 May 2021
Copy of the legal title reportFile: EMPERIA ICON TITLE CERTIFICATE.pdf3 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - EMPERIA PROJECTS.pdf3 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - EMPERIA PROJECTS.pdf3 May 2021
Proforma of Allotment letterFile: PROFORMA OF AGREEMENT FOR SALE - EMPERIA PROJECTS.pdf3 May 2021
Proforma of Allotment letterFile: PROFORMA OF ALLOTMENT LETTER - EMPERIA PROJECTS.pdf3 May 2021
PAN CardFile: PAN CARD - EMPERIA PROJECTS.pdf29 Apr 2021
Building plan approvalFile: COMMENCEMENT CERTIFICATE - EMPERIA PROJECTS.pdf28 Apr 2021
Details of encumbrancesFile: LETTER OF ENCUMBRANCES - EMPERIA PROJECTS.pdf28 Apr 2021

How this compares with Thane

33%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INFINITY IKON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIRAVANE NAVI MUMBAI7,600+ in Thane

2 kmINFINITY IKONCompleted 6Lapsed / revoked 4Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 58 registered projects within 2 km.

Builder: EMPERIA PROJECTS

EMPERIA PROJECTS has 1 registration on MahaRERA, including INFINITY IKON. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if INFINITY IKON is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INFINITY IKON?

The registered promoter entity is EMPERIA PROJECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INFINITY IKON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INFINITY IKON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INFINITY IKON?

The professionals named in the filing: Architect: D G SHAH AND ASSOCIATES; Engineer: CSE CONSULTANTS CONSULTING ENGINEERS RAJESH N SHAH; Chartered Accountant: R B SINGH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INFINITY IKON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INFINITY IKON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INFINITY IKON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.