Home / Browse projects / Pune, Maharashtra / INFINITY CUBE
INFINITY CUBE
By SNEHMANGAL TULIP DEVELOPERS
RG-MH-17008 · RERA P52100029887 · Last updated on MahaRERA portal: 6 May 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 26 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
INFINITY CUBE is a Others project by SNEHMANGAL TULIP DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100029887 on 12 Jul 2021. The registration is recorded completed; possession was promised by 31 May 2026. The completion date has moved by 26 months from the original filing. 97 of the 136 units on this registration are recorded sold or booked, and 50 of 54 construction stages are filed complete.
At a glance
Project
- NameINFINITY CUBE
- TypeOthers
- Location
- PUNAWALE
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100029887
- ReraGenie IDRG-MH-17008
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on12 Jul 2021
- Promised completion31 May 2026
- Revised completionRevised to 31 May 2026 (originally 31 Mar 2024)
- Buildings5 building records
- Documents filed158 files
Current status
Figures as on 6 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 9 | 7 | 22 | 8 | 30 |
| B WING | NA | 9 | 7 | 22 | 12 | 34 |
| C WING | NA | 9 | 7 | 22 | 12 | 34 |
| D WING | NA | 9 | 7 | 22 | 10 | 32 |
| D1 | NA | 8 | 4 | 3 | 3 | 6 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
50 of 54 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | Not applicable |
| Open Parking | Yes | Not applicable |
Parking filed410
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 81 | 81 |
| B WING | 83 | 83 |
| C WING | 83 | 83 |
| D WING | 82 | 82 |
| D1 | 81 | 81 |
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| LAXMAN MADHUKAR BORGE | Punawale | Pune |
| SAGAR BHARAT BORGE | Punawale | Pune |
| SHEKHAR BHARAT BORGE | Punawale | Pune |
| SUNIL PANDURANG BORGE | Punawale | Pune |
| ANIL PANDURANG BORGE | Punawale | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B WING | NA | Rs 7.75 cr | Rs 7.55 cr |
| C WING | NA | Rs 7.70 cr | Rs 7.50 cr |
| D WING | NA | Rs 7.50 cr | Rs 7.30 cr |
| A WING | NA | Rs 6.16 cr | Rs 6.00 cr |
| D1 | NA | Rs 1.65 cr | Rs 1.61 cr |
| - | NA | Rs 1.24 cr | Rs 1.24 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LANDMARK DESIGN GROUP |
| Engineer | Bhimrao Tengle |
| Chartered Accountant | CA ASHISH UDAWANT & ASSOCIATES |
| Chartered Accountant | S U N S V G & Associates |
| Chartered Accountant | Vaibhav Mayur |
| Partner | Role in project |
|---|---|
| SNEHMANGAL TULIP DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project was originally registered with a completion date of 31st March 2024. While a Part Completion Certificate for Buildings A, B, C, and D was obtained on 28th March 2024, the Completion Certificate for Building D1 was granted later on 5th June 2025, after fulfilling all observations raised by the competent authority. In light of the above, we are submitting a request for extension of the project registration to reflect the actual date of full completion and to ensure accurate regulatory records, even though no further construction or development activity is pending. And also, we want t
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 May 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Aug 2024
Documents filed158
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 For FY 2025-26 Q4 final.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q4 Infinity Cube final.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: Form 3 FY2025-26 Q4 Final.pdf | 6 May 2026 |
| Occupational CertificateFile: Completion certificate Infinity Cube ABCD and D1.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1 For FY 2025-26 Q3.pdf | 28 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 For FY 2025-26 Q3.pdf | 28 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 For FY 2025-26 Q3.pdf | 28 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3 Infinity Cube.pdf | 28 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3 Infinity Cube.pdf | 28 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3 Infinity Cube.pdf | 28 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q3- Infinity Cube.pdf | 28 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q3- Infinity Cube.pdf | 28 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q3- Infinity Cube.pdf | 28 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A- FY 2024-25 cube.pdf | 28 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Annual Report - Infinity Cube FY 24-25 final.pdf | 28 Mar 2026 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Q2 Disclosure of Inventory.pdf | 13 Aug 2025 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Q3 Disclosure of Inventory.pdf | 13 Aug 2025 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Q4 Disclosure of Inventory.pdf | 13 Aug 2025 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q1.pdf | 13 Aug 2025 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q2.pdf | 13 Aug 2025 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q3.pdf | 13 Aug 2025 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q4.pdf | 13 Aug 2025 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q1.pdf | 13 Aug 2025 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q2.pdf | 13 Aug 2025 |
| Form 1File: FORM 1.pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q3.pdf | 13 Aug 2025 |
| Form 1File: FORM 1 .pdf | 13 Aug 2025 |
| Form 2File: FORM 2.pdf | 13 Aug 2025 |
| Form 3File: FORM 3.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf | 13 Aug 2025 |
| Other - TechnicalFile: PIMPRI CHINCHWAD MUNICIPAL CORPORATION Mail - Completion Certificate Verification For RERA | 3 Dec 2024 |
| Other - TechnicalFile: Reply to SCN Final.pdf | 3 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Report - Infinity Cube FY 23-24.pdf | 2 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Infinity Cube.pdf | 27 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Infinity Cube.pdf | 9 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate Infinity Cube ABCD.pdf | 6 Aug 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration certificate.pdf | 6 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2023-24 Q3.pdf | 6 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2023-24 Q4.pdf | 6 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY23-24 Q4 Infiinity Cube.pdf | 5 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate Quality, Form2A, FY-2022-23.pdf | 5 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY23-24 Q4 Infinity Cube.pdf | 5 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cirtificate Cube Q3.pdf | 17 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Cube RERA Q4.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Cube Q3.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclosure Q3 Cube.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Promoter disclosure - Infinity Cube Q4.pdf | 17 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report - Infinity Cube FY 22-23.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 -Q2 Infinity Cube.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Cube Q2.pdf | 30 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclouser infinity cube Q2.pdf | 30 Nov 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| INFINITY PRIDE | SURVEY NO. 45 HISSA NO. 6-7-6 AT PUNAWALE TAL. HAVELI DIST. PUNE | 118 | Completed | Jun 2023 | Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 158 filed documents as one ZIP, foldered, with a manifest
Keep INFINITY CUBE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNAWALE13,700+ in Pune
Filed coordinates, straight-line distance. 219 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: SNEHMANGAL TULIP DEVELOPERS
SNEHMANGAL TULIP DEVELOPERS has 2 registrations on MahaRERA, including INFINITY PRIDE and INFINITY CUBE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if INFINITY CUBE is delayed beyond 31 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of INFINITY CUBE?
The registered promoter entity is SNEHMANGAL TULIP DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in INFINITY CUBE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for INFINITY CUBE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at INFINITY CUBE?
The professionals named in the filing: Architect: LANDMARK DESIGN GROUP; Engineer: Bhimrao Tengle; Chartered Accountant: CA ASHISH UDAWANT & ASSOCIATES; Chartered Accountant: S U N S V G & Associates; Chartered Accountant: Vaibhav Mayur. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in INFINITY CUBE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback