Home / Browse projects / Pune, Maharashtra / INFINITY AVANA
INFINITY AVANA
By TULIP INFRA
RG-MH-52970 · RERA P52100047662 · Last updated on MahaRERA portal: 2 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
INFINITY AVANA is a Others project by TULIP INFRA in Pune, Maharashtra, registered with MahaRERA as P52100047662 on 17 Nov 2022. Possession is promised by 31 Dec 2026. 383 of the 546 units on this registration are recorded sold or booked, and 26 of 66 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameINFINITY AVANA
- TypeOthers
- Location
- PUNAWALE
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047662
- ReraGenie IDRG-MH-52970
Builder
- NameTULIP INFRA
- Entity typePartnership
- PartnersSANJAY HARIPRADAS VARMA, AMIT TARACHAND JHAMTANI, RAJ SANJAY VARMA, SEJAL MUKESHKUMAR VARMA, VIRENDRA YOGESH BEHL
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Nov 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings6 building records
- Documents filed299 files
Current status
Figures as on 2 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 33 | 29 | 108 | 35 | 143 |
| B WING | NA | 33 | 30 | 120 | 0 | 120 |
| C WING | NA | 30 | 27 | 104 | 10 | 114 |
| D WING | NA | 34 | 31 | 121 | 8 | 129 |
| MHADA WING | NA | 8 | 7 | 40 | 0 | 40 |
| COMMERCIAL | NA | 2 | 2 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
26 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Slabs of Super Structure, at 98%.
A WING61%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 70% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 98% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B WING76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C WING67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 98% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D WING77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
MHADA WING78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
COMMERCIAL0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed582
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A WING | 134 | 13 | 147 |
| B WING | 134 | 13 | 147 |
| C WING | 134 | 0 | 134 |
| D WING | 134 | 0 | 134 |
| MHADA WING | 20 | 0 | 20 |
Land and ownership32
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DNYANESHWAR SHANTARAM KUDALE | Punawale | Pune |
| SINDHUBAI DNYANESHWAR KUDALE | Punawale | Pune |
| GEETANJALI DNYANESHWAR KUDALE | Punawale | Pune |
| NAVNATH DNYANESHWAR KUDALE | Punawale | Pune |
| PRIYANKA DNYANESHWAR KUDALE | Punawale | Pune |
| SUPRIYA DNYANESHWAR KUDALE | Punawale | Pune |
| HARI SHANTARAM KUDALE | Punawale | Pune |
| VAISHALI HARI KUDALE | Punawale | Pune |
| MORESHWAR SHANTARAM KUDALE | Punawale | Pune |
| SHILPA MORESHWAR KUDALE | Punawale | Pune |
| PANDURANG SHANTARAM KUDALE | Punawale | Pune |
| ASHA PANDURANG KUDALE | Punawale | Pune |
| RAJU GAJANAN KUDALE | Punawale | Pune |
| SANGEETA RAJU KUDALE | Punawale | Pune |
| SNEHAL RAJU KUDALE | Punawale | Pune |
| ONKAR RAJU KUDALE | Punawale | Pune |
| RAMDAS GAJANAN KUDALE | Punawale | Pune |
| JAYASHREE RAMDAS KUDALE | Punawale | Pune |
| NILIMA RAMDAS KUDALE | Punawale | Pune |
| MAYUR RAMDAS KUDALE | Punawale | Pune |
| BHANUDAS GAJANAN KUDALE | Punawale | Pune |
| BHIMABAI BHANUDAS KUDALE | Punawale | Pune |
| BAJRANG BHANUDAS KUDALE | Punawale | Pune |
| SUKHDEO GAJANAN KUDALE | Punawale | Pune |
| VIJAYA SUKHDEO KUDALE | Punawale | Pune |
| SATYAVAN SUKHDEO KUDALE | Punawale | Pune |
| SONALI SATYAVAN KUDALE | Punawale | Pune |
| TUKARAM SUKHDEO KUDALE | Punawale | Pune |
| SAYALI TUKARAM KUDALE | Punawale | Pune |
| RAGHURAJ SUKHDEO KUDALE | Punawale | Pune |
| RUKHMINI SHANTARAM KUDALE | Punawale | Pune |
| AISHWARYA MAYUR KUDALE | Punawale | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 79.40 cr | Rs 58.10 cr |
| B WING | NA | Rs 75.76 cr | Rs 55.44 cr |
| D WING | NA | Rs 56.55 cr | Rs 41.38 cr |
| C WING | NA | Rs 50.76 cr | Rs 37.15 cr |
| - | NA | Rs 15.00 cr | - |
| MHADA WING | NA | Rs 10.53 cr | Rs 7.71 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LANDMARK DESIGN GROUP |
| Engineer | BHIMRAO TENGLE |
| Chartered Accountant | V S A P & COMPANY |
| Chartered Accountant | S U N S V G & Associates |
| Partner | Role in project |
|---|---|
| TULIP INFRA | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502863 | Rahul Vashisth | TULIP INFRA | 15/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed299
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 299 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 for FY 2025 26 Q4 final.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q4 Avana Final.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: Form 3 for FY2025-26 Q4 Infinity Avana final.pdf | 2 May 2026 |
| Form 2A (FY 2025-2026)File: Form 2A for FY 2025-26 final.pdf | 29 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A for FY 2024-25 Avana final.pdf | 10 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 for FY 2025 26 Q3.pdf | 10 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025 26 Q3.pdf | 10 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 for FY 2025 26 Q3 resize.pdf | 10 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Annual Report - Tulip Infra- Avana FY 24-25.pdf | 2 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Final.pdf | 4 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - Final.pdf | 4 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - Final.pdf | 4 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - Final.pdf | 4 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 4 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 4 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 4 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 4 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf | 4 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf | 4 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf | 4 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf | 4 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - Final.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - Final.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - Final.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - Final.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 Q1 FY 2025-26.pdf | 6 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 Q1 FY 2025-26.pdf | 6 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3 Q1 FY 2025-26.pdf | 6 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1 Q1 FY 2025-26.pdf | 8 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 Q1 FY 2025-26.pdf | 8 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 Q1 FY 2025-26.pdf | 8 Aug 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Infra Registration Qtr 4.pdf | 3 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer Certificate for Quality Assurance Infinity-Avana.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate 21-04-2025- Qtr 4_11zon.pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avana Form 3_11zon.pdf | 2 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TI_Form-5_FY2023-24.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Qtr 3 FY 2024-25.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Q3 FY 2024-25 RESIZE.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Infra Registration Qtr 3.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure Unit Wise Qtr 3 Resize.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Avana- Form 1 Qtr 2 Resize.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 Resize.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Avana Form 2 Qtr 2.pdf | 18 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure Avana - Qtr 2 Resize.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Infra Registration Qtr 1.pdf | 2 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure Unit Wise Qtr 1.pdf | 2 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 24-25 Q1 Infinity Avana.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2024-25 Q1.pdf | 11 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24 Infinity Avana.pdf | 7 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 23-24 Q4 Infinity Avana.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure Unit Wise Qtr 4.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 23-24 Q4 Infinity Avana.pdf | 28 May 2024 |
| Building plan approvalFile: Plan 1.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 2.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 3.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 4.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 5.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 6.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 7.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 8.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 9.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 10.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 11.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 12.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 13.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 14.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 15.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 16.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 17.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 18.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 19.pdf | 27 Mar 2024 |
| Building plan approvalFile: Plan 20.pdf | 27 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 299 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep INFINITY AVANA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNAWALE13,700+ in Pune
Filed coordinates, straight-line distance. 227 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: TULIP INFRA
TULIP INFRA has 2 registrations on MahaRERA, including INFINITY AVANA and INFINITY EVANA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if INFINITY AVANA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of INFINITY AVANA?
The registered promoter entity is TULIP INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in INFINITY AVANA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against INFINITY AVANA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for INFINITY AVANA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at INFINITY AVANA?
The professionals named in the filing: Architect: LANDMARK DESIGN GROUP; Engineer: BHIMRAO TENGLE; Chartered Accountant: V S A P & COMPANY; Chartered Accountant: S U N S V G & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in INFINITY AVANA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback