ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / INFINITO SERENO

Registered No litigation declared Residential / Group Housing project

INFINITO SERENO

By INFINITO DEVELOPERS

RG-MH-87568 · RERA P52100052088 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 95%
75 of 120Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

INFINITO SERENO is a Residential / Group Housing project by INFINITO DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100052088 on 24 Jul 2023. Possession is promised by 31 Dec 2028. 45 of the 120 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameINFINITO SERENO
  • TypeResidential / Group Housing
  • Location
    • BANER
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052088
  • ReraGenie IDRG-MH-87568

Builder

  • NameINFINITO DEVELOPERS
  • Entity typePartnership
  • PartnersKISHOR PREMSINGH RAWAL, ISHWAR RAMAJI PATEL, JAYPAL PRATAPSINGH RAWAL, SATISH HARILAL PATEL, VISHRAM AKHAI PATEL, ISHWAR BABUBHAI PATEL, LOKESH DILIP JAIN, KISHAN DINESH PATEL, MANISHKUMAR SURESHCHANDRA SHAH

Key dates

this monthRegisteredJul 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jul 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed84 files

Current status

38%45 of 120 units booked
53.5%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INFINITO SERENO A WINGNA141260060
INFINITO SERENO B WINGNA141260060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 95%.

INFINITO SERENO A WING23%
ActivityProgress
Excavation95%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor15%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
INFINITO SERENO B WING44%
ActivityProgress
Excavation95%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor65%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed277

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots277
Closed/Covered277
BuildingClosed/CoveredTotal
INFINITO SERENO A WING138138
INFINITO SERENO B WING139139

Land and ownership16

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,769 sq m
Land owned byThe promoter, with other names on the file
Named landowners16
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jun 2026
LandownerVillageDistrict
PUSHPALATA RAMDAS TAMHANEBanerPune
SAGAR RAMDAS TAMHANEBanerPune
RUPALI SACHIN TAMHANEBanerPune
RIYA SACHIN TAMHANEBanerPune
CHIRAG SACHIN TAMHANEBanerPune
SANDHYA DATTATREY SATAVPune (CB)Pune
ANANDA HARI TAMHANEBanerPune
ARJUN HARI TAMHANEBanerPune
RAJENDRA HARI TAMHANEBanerPune
INDUBAI MURLIDHAR TAMHANEChakan (CT)Pune
RADHA ALIAS RADHABAI SITARAM NAGAREChikhaliPune
SANGITA BALKRISHNA DUDHALBoribhadakPune
AMIT SHIVAJI MULEPashanPune
SUDHAKAR SUKDOJI AMBEKARGhorpadiPune
K.B CONSTRUCTIONSusPune
SHANKAR MURLIDHAR TAMHANEChakan (CT)Pune

Approvals and building plan

Permissible FSI12059.94
Proposed, not sanctioned12,060 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTHRUD
Estimated costRs 50.48 cr
Cost incurredRs 27.02 cr
Work done53.52%
BuildingWingEstimatedIncurred
INFINITO SERENO B WINGNARs 19.92 crRs 17.44 cr
INFINITO SERENO A WINGNARs 19.61 crRs 8.18 cr
-NARs 10.96 crRs 1.39 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRASAD PANDURANG MUGALE
EngineerVAIBHAV SURESH GURAV
Chartered AccountantA S AND CO VELAPURE
Chartered AccountantHSPN AND ASSOCIATES
PartnerRole in project
INFINITO DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect_Certificate.pdf15 May 2026
Withdrawal Update Form 1File: Architect_Certificate.pdf15 May 2026
Withdrawal Update Form 2File: _Engineer_Certificate.pdf15 May 2026
Withdrawal Update Form 2File: _Engineer_Certificate.pdf15 May 2026
Withdrawal Update Form 3File: CA_Certificate__compressed.pdf15 May 2026
Withdrawal Update Form 3File: CA_Certificate__compressed.pdf15 May 2026
Form 2A (FY 2024-2025)File: 2024-2025.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: 2025-2026.pdf24 Apr 2026
Form 5 (FY 2023-2024)File: RERA FORM 5.pdf24 Apr 2026
Form 5 (FY 2024-2025)File: Scan_Form_5_FY_2024-25_Infinito_Developers.pdf24 Apr 2026
Withdrawal Update Form 1File: FROM NO 1.pdf21 Feb 2026
Withdrawal Update Form 2File: FROM NO 2.pdf21 Feb 2026
Withdrawal Update Form 3File: FROM NO 3.pdf21 Feb 2026
Layout approvalFile: Infinito_Sereno_Revise_Plan_2025_scan 5-8.pdf27 Dec 2025
Building plan approvalFile: Infinito_Sereno_Revise_Plan_2025_scan 6-8.pdf27 Dec 2025
Building plan approvalFile: Infinito_Sereno_Revise_Plan_2025_scan 7-8.pdf27 Dec 2025
Building plan approvalFile: Infinito_Sereno_Revise_Plan_2025_scan 8-8.pdf27 Dec 2025
Layout approvalFile: Infinito_Sereno_Revise_Plan_2025_scan 1-8.pdf26 Dec 2025
Building plan approvalFile: Infinito_Sereno_Revise_Plan_2025_scan 2-8.pdf26 Dec 2025
Building plan approvalFile: Infinito_Sereno_Revise_Plan_2025_scan 3-8.pdf26 Dec 2025
Building plan approvalFile: Infinito_Sereno_Revise_Plan_2025_scan 4-8.pdf26 Dec 2025
Form 1File: Architect Certificate.pdf18 Nov 2025
Form 2File: Engineer Certificate.pdf18 Nov 2025
Form 3File: CA Certificate.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf18 Nov 2025
Form 1File: ARCHITECT CERTIFICATE.pdf18 Nov 2025
Form 2File: ENGINEER'S CERTIFICATE.pdf18 Nov 2025
Form 3File: CA CERTIFICATE.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf18 Nov 2025
Form 1File: FORM 1.pdf19 Aug 2025
Form 2File: FORM 2.pdf19 Aug 2025
Form 3File: FORM 3.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory RERA Update 31-03-2025.pdf19 Aug 2025
Form 1File: FORM 1.pdf19 Aug 2025
Form 2File: FORM 2.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory RERA Update 31-06-2025.pdf19 Aug 2025
Form 3File: FORM 3.pdf19 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE RERA Q3_OCT-NOV-DEC_24-25.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE RERA Q3_OCT-NOV-DEC_24-25.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE RERA Q3_OCT-NOV-DEC_24-25.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 SCAN RERA ARCHITECT CERTIFICATE Q4.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 SCAN RERA ENGINEER CERTIFICATE Q4.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 SCAN RERA C A CERTIFICATE Q4 compressed.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 ARCHITECT CERTIFICTAE.pdf18 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FORM 2.pdf18 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE NEW.pdf18 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1ST QUARTERLY UPDATION ARCHITECT CERTIFICATE.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1ST QUARTERLY UPDATION CA CERTIFICATE.pdf16 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1ST QUARTERLY UPDATION ENGINEER CERTIFICATE.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Rera Form 3 C A_compressed.pdf10 Jul 2023
Copy of the legal title reportFile: SERCH REPORT NEW.pdf6 Jul 2023
Details of encumbrances concerned to FinanceFile: DETAILS OF EMCUMBRANCES.pdf26 Jun 2023
Details of encumbrances concerned to LegalFile: DETAILS OF EMCUMBRANCES.pdf26 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200269628517_For_Asset_Based_Search_24_05_2023_20_29_54_615.pdf30 May 2023
Details of encumbrances concerned to FinanceFile: DETAILS OF EMCUMBRANCES.pdf24 May 2023
Details of encumbrances concerned to LegalFile: DETAILS OF EMCUMBRANCES.pdf24 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf24 May 2023
Proforma of Agreement for saleFile: AGREEMENT TO SALE.pdf24 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf24 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf23 May 2023
Building plan approvalFile: NA ORDER INFINITO DEV.pdf20 May 2023
Layout approvalFile: Infinito Sereno Scan Plan 1-5.pdf20 May 2023
Layout approvalFile: Infinito Sereno Scan plan 2-5.pdf20 May 2023
Layout approvalFile: Infinito Sereno Scan plan 3-5.pdf20 May 2023
Layout approvalFile: Infinito Sereno Scan plan 4-5.pdf20 May 2023
Layout approvalFile: Infinito Sereno Scan plan 5-5.pdf20 May 2023
Copy of Layout Approval (in case of layout)File: Infinito Sereno Scan Plan 1-5.pdf20 May 2023
Copy of Layout Approval (in case of layout)File: Infinito Sereno Scan plan 2-5.pdf20 May 2023
Copy of Layout Approval (in case of layout)File: Infinito Sereno Scan plan 3-5.pdf20 May 2023
Copy of Layout Approval (in case of layout)File: Infinito Sereno Scan plan 4-5.pdf20 May 2023
Copy of Layout Approval (in case of layout)File: Infinito Sereno Scan plan 5-5.pdf20 May 2023
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER INFINITO DEV.pdf20 May 2023
Declaration in FORM BFile: DECLARATION IN FORM B.pdf20 May 2023
PAN CardFile: INFINITO DEVELOPERS PAN CARD.pdf18 May 2023
Commencement Certificates / NA Order for plotted developmentFile: infinito sereno revised commencement certificate.pdf18 May 2023
Declaration about Commencement CertificateFile: DECLARATION REGARDING CC.pdf18 May 2023

How this compares with Pune

38%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INFINITO SERENO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANER13,700+ in Pune

2 kmINFINITO SERENOCompleted 191Lapsed / revoked 62Other 148Dot size: filed unitsN

Filed coordinates, straight-line distance. 401 registered projects within 2 km.

Builder: INFINITO DEVELOPERS

INFINITO DEVELOPERS has 1 registration on MahaRERA, including INFINITO SERENO. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if INFINITO SERENO is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INFINITO SERENO?

The registered promoter entity is INFINITO DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INFINITO SERENO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INFINITO SERENO?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INFINITO SERENO?

The professionals named in the filing: Architect: PRASAD PANDURANG MUGALE; Engineer: VAIBHAV SURESH GURAV; Chartered Accountant: A S AND CO VELAPURE; Chartered Accountant: HSPN AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INFINITO SERENO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INFINITO SERENO. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INFINITO SERENO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.