Indu Park
RG-MH-94731 · RERA P51600049869 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Indu Park is a Others project by SONAWANE INFRA in Nashik, Maharashtra, registered with MahaRERA as P51600049869 on 6 Mar 2023. The registration is recorded completed; possession was promised by 30 Mar 2026. The completion date has moved by 24 months from the original filing. 14 of the 24 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameIndu Park
- TypeOthers
- Location
- Sonawane Mala
- Eknath Nagar
- Nashik (M Corp.)
- Nashik
- 422009
- Pincode422009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600049869
- ReraGenie IDRG-MH-94731
Builder
- NameSONAWANE INFRA
- Entity typePartnership
- PartnersPRATAP LAXMAN SONAWANE, NITIN EKNATH SONAWANE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on6 Mar 2023
- Promised completion30 Mar 2026
- Revised completionRevised to 30 Mar 2026 (originally 31 Mar 2024)
- Buildings1 building record
- Documents filed66 files
Current status
Figures as on 30 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Indu Park | NA | 8 | 7 | 22 | 2 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Indu Park: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed21
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Indu Park | NA | Rs 4.40 cr | Rs 3.95 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mahesh Jangid |
| Engineer | Prashant Bacchav |
| Engineer | Nilesh Khode |
| Chartered Accountant | CA Manoj G Khairnar |
| Chartered Accountant | MKHS and Associates |
| Partner | Role in project |
|---|---|
| SONAWANE INFRA | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project is ready for application for OC, we have completed 70% project compliances for OC and we will apply for OC on or before 31-03-2025. To complete the of balance finishing work and to take water connection at site. We seek a further extension of one year i.e. up to 31-03-2025 to complete work and obtain an Occupation Certificate for the project. We request you to kindly extend the project completion date to 31-03-2025.
Reason as filed by the promoterwe have completed 85% project and we will get OC on or before 30-03-2026. To complete the of balance finishing work and to take water connection at site. We seek a further extension of one year i.e. up to 30-03-2026 to complete work and obtain an Occupation Certificate for the project. We request you to kindly extend the project completion date to 30-03-2026., The reason for delay in project completion is due to labour constraint due to this work is not completed on time., We have taken a approval from all the allottees for the extension and the letter of Format B is uploaded.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC and clarification letter.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Dec.pdf | 23 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Sep 25.pdf | 23 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 with Completion Certificate.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Dec.pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Sep 25.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Dec.pdf | 30 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 22 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Sep 25.pdf | 22 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 22 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 25.pdf | 22 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 June 25.pdf | 22 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 25.pdf | 22 Dec 2025 |
| Form 2A (FY 2023-2024)File: Form 2A Indu Park 23-24.pdf | 18 Jun 2025 |
| Form 1File: Form 1 Dec 24.pdf | 4 Jun 2025 |
| Form 2File: Form 2 Dec 24.pdf | 4 Jun 2025 |
| Form 3File: CA certificate.pdf | 4 Jun 2025 |
| Form 1File: Form 1.pdf | 4 Jun 2025 |
| Form 2File: Form 2.pdf | 4 Jun 2025 |
| Form 3File: CA Cert.pdf | 4 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 4 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate Sep 24 Final.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Sep 24 Final.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate SEP 24.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 15 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate june.pdf | 15 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 15 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventor.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 11 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 1 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 1 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Idnu Park March 24_compressed.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 23 to Upload.pdf | 25 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Dec 23.pdf | 25 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Indu Park Dec 23 to Upload.pdf | 25 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report Indu Park 22-23.pdf | 3 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep 23.pdf | 13 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Indu park.pdf | 13 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indu park CA Cert_compressed.pdf | 13 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indu park CA Cert_compressed.pdf | 13 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indu Park CA Certificate.pdf | 13 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Indu Park.pdf | 20 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Undu Park.pdf | 20 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Indu park CA cert_compressed.pdf | 20 Sep 2023 |
| Proforma of Agreement for saleFile: Draft Agreement for Sale Indu Park.pdf | 2 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation for AFS FINAL.pdf | 2 Mar 2023 |
| CERSAI detailsFile: Declaration- of No CERSAI.pdf | 15 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 11 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Nitin Sonawane.pdf | 11 Feb 2023 |
| Copy of the legal title reportFile: Legal Title Report Indu Park.pdf | 8 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Indu Park.pdf | 8 Feb 2023 |
| Layout approvalFile: Layout Plan.pdf | 31 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 31 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Pratap Sonawane.pdf | 31 Jan 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 31 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf | 24 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf | 24 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf | 24 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf | 24 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration.pdf | 24 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter Final.pdf | 24 Jan 2023 |
| Building plan approvalFile: PLAN.pdf | 8 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf | 8 Dec 2022 |
| Declaration in FORM BFile: Form B.pdf | 8 Dec 2022 |
| PAN CardFile: PAN Firm.pdf | 6 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement_compressed.pdf | 6 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
Keep Indu Park on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Eknath Nagar4,100+ in Nashik
Filed coordinates, straight-line distance. 198 registered projects within 2 km.
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: SONAWANE INFRA
SONAWANE INFRA has 1 registration on MahaRERA, including Indu Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Indu Park is delayed beyond 30 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Indu Park?
The registered promoter entity is SONAWANE INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Indu Park?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Indu Park?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Indu Park?
The professionals named in the filing: Architect: Mahesh Jangid; Engineer: Prashant Bacchav; Engineer: Nilesh Khode; Chartered Accountant: CA Manoj G Khairnar; Chartered Accountant: MKHS and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Indu Park?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback