Completed No litigation declared Residential / Group Housing project

INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED

By AGILE ENTERPRISES

RG-MH-03179 · RERA P51700020576 · Last updated on MahaRERA portal: 15 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Stilt Floor, 75%
0Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED is a Residential / Group Housing project by AGILE ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700020576 on 26 Apr 2019. The registration is recorded completed; possession was promised by 29 Dec 2024. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameINDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED
  • TypeResidential / Group Housing
  • Location
    • Off. M. G. Road
    • Naupada
    • Thane West
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700020576
  • ReraGenie IDRG-MH-03179

Builder

  • NameAGILE ENTERPRISES
  • Entity typePartnership
  • PartnersPRANAD ANIL GUPTE, SHWETA SANJAY CHONKAR

Key dates

this monthRegisteredApr 2019First promiseDec 2023Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Apr 2019
  • Promised completion29 Dec 2024
  • Revised completionRevised to 29 Dec 2024 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed36 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITEDNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 75%.

INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor75%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area527 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITEDThane (M Corp.)Thane

Approvals and building plan

Permissible FSI1073.77
Proposed, not sanctioned1,074 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPANCHPAKHADI BRANCH, THANE WEST

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHASHI DESHMUKH & ASSOCIATES
Chartered AccountantCA AMIT ANIL MOHARE
PartnerRole in project
AGILE ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018892Dec 2023 → Dec 2024

Reason as filed by the promoterProject is expecting some more time for completion

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jan 2025

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: Form 4 dt 2024-10-18.pdf15 Apr 2025
Other - TechnicalFile: Form 4 dt 2024-10-18Letter.pdf15 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 OC dt 2024-10-17.pdf29 Jan 2025
Declaration in FORM BFile: rera declaration b form.pdf14 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indraprastha Form 1 2019-20 Q4.pdf14 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indraprastha Form 1 2020-21 Q4.pdf14 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indraprastha Form 1 2021-22 Q4.pdf14 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indraprastha Form 2 2019-20 Q4.pdf14 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indraprastha Form 2 2020-21 Q4.pdf14 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indraprastha Form 2 2021-22 Q4.pdf14 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Indraprastha Form 2 2019-20 Q4.pdf14 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Indraprastha Form 2 2020-21 Q4.pdf14 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Indraprastha Form 2 2021-22 Q4.pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: Declaration - Sold Unsold.pdf14 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22 dt 2023-04-08 sd.pdf13 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf29 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 FY 2017-18 NA.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 2018-19 NA.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20 dt 2020-09-30.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21 dt 2021-12-28.pdf20 Apr 2023
Layout approvalFile: Indraprashtha Layout Copy Reduced Size.pdf16 Apr 2019
Building plan approvalFile: Declaration No Separate IOD.pdf16 Apr 2019
Building plan approvalFile: Declaration No Separate Layout.pdf16 Apr 2019
PAN CardFile: Agile PAN.pdf16 Apr 2019
Copy of the legal title reportFile: Indraprastha Title Certificate.pdf16 Apr 2019
Details of encumbrancesFile: Declaration No Borrowings.pdf16 Apr 2019
Copy of Layout Approval (in case of layout)File: Indraprashtha Layout Copy Reduced Size.pdf16 Apr 2019
Building Plan Approval (IOD)File: Declaration No Separate IOD.pdf16 Apr 2019
Building Plan Approval (IOD)File: Declaration No Separate Layout.pdf16 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: Indraprashtha Layout CC.PDF16 Apr 2019
Declaration in FORM BFile: Indraprastha FormB.pdf16 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indraprashtha Form1 dt 2019-04-01.pdf16 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indraprashtha Form2 dt 2019-04-03.pdf16 Apr 2019
Certificates of CA (Form 3)File: Indraprastha Form 3 dt 2019-04-16 working 2019-03-31.pdf16 Apr 2019
Proforma of Allotment letterFile: Indraprastha Agreement Draft.pdf16 Apr 2019
OtherFile: Declaration Signatory.pdf16 Apr 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Naupada, Thane West7,600+ in Thane

2 kmINDRAPRASTHA CO-OPERATIVCompleted 90Lapsed / revoked 67Other 128Dot size: filed unitsN

Filed coordinates, straight-line distance. 285 registered projects within 2 km.

Builder: AGILE ENTERPRISES

AGILE ENTERPRISES has 1 registration on MahaRERA, including INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 29 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED?

The registered promoter entity is AGILE ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED?

The professionals named in the filing: Architect: SHASHI DESHMUKH & ASSOCIATES; Chartered Accountant: CA AMIT ANIL MOHARE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.