Home / Browse projects / Solapur, Maharashtra / INDRADHANU Phase-3

Completed No litigation declared Residential / Group Housing project

INDRADHANU Phase-3

By M/S Ganesh Ramchandra Apte

RG-MH-20432 · RERA P52600009419 · Last updated on MahaRERA portal: 18 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Jul 2023Possession promisedregistration recorded completed
2 of 11Construction stages donefurthest along: Basement (if any), 80%
0Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

INDRADHANU Phase-3 is a Residential / Group Housing project by M/S Ganesh Ramchandra Apte in Solapur, Maharashtra, registered with MahaRERA as P52600009419 on 22 Aug 2017. The registration is recorded completed; possession was promised by 31 Jul 2023.

At a glance

Project

  • NameINDRADHANU Phase-3
  • TypeResidential / Group Housing
  • Location
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413001
  • Pincode413001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600009419
  • ReraGenie IDRG-MH-20432

Builder

  • NameM/S Ganesh Ramchandra Apte
  • Entity typePartnership
  • PartnersVinay Vasant Apte, Aparna Milind Venegurkar, Mahesh Vasant Apte, Sarang Arvind Apte, Sharmila Sanjay Venegurkar, Vikas Shankar Koli, Chetan Narsinh Phatak, Malhar Arun Karande, Vishaka Vijay Marathe, Swati Umesh Marathe, Alhad Vamanrao Apte, Nitin Vasant Apte
  • Other registrations7 more →
  • Completed2 of 8
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedJul 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion31 Jul 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE NO-1NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.

ROW HOUSE NO-1: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes70%
Street LightingYes70%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes35%
Aggregate area of recreational Open SpaceYes60%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area290 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI190.23
Proposed, not sanctioned190 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMangalwar Peth,Tilak Chowk, Solapur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVk:a ARCHITECTURE
ArchitectAR. Vidya Mahendra Akkalkote
EngineerSTRUDCOM CONSULTANTS PVT LTD
PartnerRole in project
M/S Ganesh Ramchandra Apte-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Mar 2022

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2AFile: Form 5 Phase 3 2019-20.pdf18 Feb 2025
Form 2AFile: Form 5 Phase 3 2020-21.pdf18 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: indradhanu ph3 f1 2018.pdf4 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: indradhanu ph3 f1 2020.pdf4 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: indradhanu ph3 f1 2021.pdf4 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: indradhanu ph 3 f1 2019.pdf4 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indradhanu ph3 f2 2018.pdf4 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: indradhanu ph 3 f2 2019.pdf4 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: indradhanu ph2 f2 2020.pdf4 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: indradhanu ph 3 f2 2021.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: indradhanu ph 3 f2A 2018.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: indradhanu ph 3f2a 2019.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: indradhanu ph 3 f2A 2020.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: indradhanu ph 3 f2A 2021.pdf4 Jul 2023
Disclosure of sold/ booked inventoryFile: ph-3-2018.pdf4 Jul 2023
Disclosure of sold/ booked inventoryFile: ph-3-2019.pdf4 Jul 2023
Disclosure of sold/ booked inventoryFile: ph-3-2020.pdf4 Jul 2023
Disclosure of sold/ booked inventoryFile: ph-3-2021.pdf4 Jul 2023
CERSAI detailsFile: phase 3.pdf8 Apr 2022
Declaration about Commencement CertificateFile: GRA PH-3-FORM D.pdf31 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GRA-5-2A-2020-2021.pdf31 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GRA-3-2A-2020-2021.pdf31 Mar 2022
Architect’s Certificate on Completion of Project (Form 4)File: ARCHI COMPLI CERTI-FORM-4.pdf30 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC-VILLA NO-01-DTD-20-01-2021.pdf26 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: indr-ph-3-villa no-1-FORM-5.pdf16 Nov 2019
Form 2AFile: Form 2 Compressed.pdf4 Apr 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Certi.pdf4 Apr 2019
Certificates of CA (Form 5)File: Villa 1.pdf30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Building permission RH 1.pdf31 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rowhouse-1 Engineer.pdf31 Oct 2017
Building plan approvalFile: Permission plan.pdf29 Jul 2017
Layout approvalFile: Permission plan.pdf29 Jul 2017
PAN CardFile: PAN Card (1) GRA.pdf29 Jul 2017
Copy of the legal title reportFile: GRA_LEGAL SEARCH REPORT.pdf29 Jul 2017
Details of encumbrancesFile: GRA-ENCUMBRANCE_NEW.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Permission plan.pdf29 Jul 2017
Building Plan Approval (IOD)File: Permission plan.pdf29 Jul 2017
Declaration in FORM BFile: Affadative Row House 01_NEW-min (1).pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.pdf29 Jul 2017
Certificates of CA (Form 3)File: Indradhanu Phase-III.pdf29 Jul 2017
Proforma of Allotment letterFile: Agreement GRA.pdf29 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
INDRADHANU PHASE-1INDRADHANU Phase-I330CompletedMay 2015Late, Mar 2017

How this compares with Solapur

15%of Solapur projects moved their completion datethis one has not
39%of Solapur registrations have lapsed or been cancelledthis one is completed

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep INDRADHANU Phase-3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Solapur (M Corp.)550+ in Solapur

2 kmINDRADHANU Phase-3Completed 21Lapsed / revoked 15Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: M/S Ganesh Ramchandra Apte

M/S Ganesh Ramchandra Apte has 8 registrations on MahaRERA, including INDRADHANU Phase-3 and INDRADHANU-Phase-2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if INDRADHANU Phase-3 is delayed beyond 31 Jul 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INDRADHANU Phase-3?

The registered promoter entity is M/S Ganesh Ramchandra Apte, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INDRADHANU Phase-3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INDRADHANU Phase-3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INDRADHANU Phase-3?

The professionals named in the filing: Architect: Vk:a ARCHITECTURE; Architect: AR. Vidya Mahendra Akkalkote; Engineer: STRUDCOM CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INDRADHANU Phase-3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INDRADHANU Phase-3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INDRADHANU Phase-3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.