Red flags
- 15 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Indiabulls Savroli - 1 is a Residential / Group Housing project by Sylvanus Properties Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000001481 on 28 Jul 2017. The registration is recorded completed; possession was promised by 28 Feb 2019. 15 complaints are on record with the regulator.
At a glance
Project
- NameIndiabulls Savroli - 1
- TypeResidential / Group Housing
- Location
- Pen Khopoli Road
- Near Khalapur Toll Naka
- Savroli
- Khalapur
- Raigarh
- 410202
- Pincode410202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000001481
- ReraGenie IDRG-MH-11971
Builder
- NameSylvanus Properties Limited
- Entity typeCompany
- Whole Time DirectorRikesh Lakhani
- DirectorsSsatyajit Parrihaar, Milind Khedekar
- Other registrations2 more →
- Completed2 of 3
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Jul 2017
- Promised completion28 Feb 2019
- Revised completionNone
- Buildings16 building records
- Documents filed42 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D3 | NA | 8 | 0 | 0 | 0 | 0 |
| D4 | NA | 8 | 0 | 0 | 0 | 0 |
| D5 | NA | 8 | 0 | 0 | 0 | 0 |
| D6 | NA | 8 | 0 | 0 | 0 | 0 |
| E1 | NA | 8 | 0 | 0 | 0 | 0 |
| E2 | NA | 8 | 0 | 0 | 0 | 0 |
| E3 | NA | 8 | 0 | 0 | 0 | 0 |
| E4 | NA | 8 | 0 | 0 | 0 | 0 |
| F1 | NA | 8 | 0 | 0 | 0 | 0 |
| F2 | NA | 8 | 0 | 0 | 0 | 0 |
| F3 | NA | 8 | 0 | 0 | 0 | 0 |
| F4 | NA | 8 | 0 | 0 | 0 | 0 |
| H1A | NA | 8 | 0 | 0 | 0 | 0 |
| H1B | NA | 8 | 0 | 0 | 0 | 0 |
| H1C | NA | 8 | 0 | 0 | 0 | 0 |
| H1D | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building16
As on 8 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
144 of 176 construction stages are filed complete across 16 buildings. The stage furthest along is Podiums (if any), at 0%.
D382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
H1A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
H1B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
H1C82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
H1D82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 8 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 15% |
| Water Supply | Yes | 15% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 79% |
| Storm Water Drains | Yes | 71% |
| Landscaping & Tree Planting | Yes | 15% |
| Street Lighting | Yes | 15% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 15% |
| Solid Waste Management And Disposal | Yes | 15% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 15% |
| Electrical meter room, sub-station, receiving station | Yes | 66% |
| Aggregate area of recreational Open Space | Yes | 15% |
| Open Parking | Yes | 15% |
| Multipurpose Court | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anupam De & Associates |
| Architect | Octave Consultants |
| Architect | Rakhi Ubhare |
| Engineer | Mr Ramesh Rampure |
| Chartered Accountant | Agarwal Prakash & Co |
| Chartered Accountant | Sundar Venkataraman & Co |
| Chartered Accountant | Bagaria & Co LLP |
| Partner | Role in project |
|---|---|
| Sylvanus Properties Limited | - |
Complaints filed with MahaRERA15
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000470 | VIKRAM HASTIMAL JAIN | M/S SYLVANUS PROPERTIES LIMITED | 12/09/2017 |
| CC006000000000683 | PREM CHAND | INDIABULLS REAL ESTATE LTD | 19/09/2017 |
| CC006000000000858 | MANOJ KUMAR SIPANI | SYLVANUS PROPERTIES LTD. | 24/09/2017 |
| CC006000000001457 | Trupti Anil Salvi/Anil B Salvi | Sylvanus Properties Limited | 26/10/2017 |
| CC006000000089747 | Pradip M. Mehta | Sylvanus Properties Limited | 05/07/2019 |
| CC006000000023968 | Harpreet Singh Tibb | India Bulls - Sylvanus Properties | 04/04/2018 |
| CC006000000055166 | Neeta Deepak Jadhav | Sylvanus Properties Limited | 17/07/2018 |
| CC006000000055446 | TANMAY DEEPAK JADHAV | SYLVANUS PROPERTIES LIMITED | 23/07/2018 |
| CC006000000057570 | amit saxena | sylvanus properties | 16/01/2019 |
| CC006000000078373 | Sylvanus properties ltd | Sylvanus properties limited | 06/03/2019 |
| CC006000000089525 | F. PUDUMJEE INVESTMENT COMPANY PRIVATE LIMITED | SYLVANUS PROPERTIES LIMITED | 03/06/2019 |
| CC006000000089534 | PRADIP KUMAR BUBNA | SYLVANUS PROPERTIES LIMITED | 03/06/2019 |
| CC006000000141087 | Kamlesh Tiku | Sylvanus properties ltd | 24/10/2019 |
| CC006000000303478 | TEJASHREE PUSHKHARAJ SHENAI | Sylvanus Properies Ltd | 28/11/2022 |
| CC12400136 | RAJEEV MISHRA | Sylvanus Properties Limited | 17/09/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed42
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Golf City Phase-1_Revised.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Golf City Phase 1.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Golf City 1.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Golf City-1.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Savroli 1.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulls Golf City 1.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Indiabulsl Savroli Golf City 1.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: INDIABULLS GOLF CITY F1 1.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Savroli Golf City- 1.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Golf City-1.pdf | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Savroli Golf City 1.PDF | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Savroli Golf City 1.PDF | 8 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Savroli-1.PDF | 8 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Savroli-1.PDF | 8 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Indiabulls Savroli-1.PDF | 8 Nov 2023 |
| Certificates of CA (Form 3)File: Indiabulls Savroli 1.pdf | 8 Nov 2023 |
| Certificates of CA (Form 3)File: Indiabulls Savroli_Phase 1_compressed.pdf | 8 Nov 2023 |
| Certificates of CA (Form 3)File: Indiabulls Savroli_Phase 1_compressed.pdf | 8 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Savroli.pdf | 29 Sep 2023 |
| Details of encumbrancesFile: Sylvanus Properties LTD.PDF | 21 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Savroli Golf City 3.pdf | 21 Oct 2022 |
| Details of encumbrancesFile: Savroli - SYLVANUS.pdf | 14 Feb 2022 |
| Details of encumbrancesFile: Encumbrance Certificate SPL.pdf | 24 Oct 2020 |
| Form 2AFile: FORM 2A - Savroli Golf City 1.PDF | 21 Feb 2019 |
| Certificates of CA (Form 5)File: Savroli 1.PDF | 17 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: download.pdf | 5 Sep 2018 |
| Certificates of Architect (Form 4)File: Indiabulls Golf City Project-OC.PDF | 4 Sep 2018 |
| Details of encumbrancesFile: Savroli Encumbrance.pdf | 2 Feb 2018 |
| Declaration in FORM BFile: Form B.PDF | 27 Jul 2017 |
| Layout approvalFile: Final_Layout.pdf | 21 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Certificate -Savroli.PDF | 21 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Final_Layout.pdf | 21 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Ph 1.pdf | 21 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Savroli 1.pdf | 21 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate Savroli 1.pdf | 21 Jul 2017 |
| Proforma of Allotment letterFile: Booking Form and Agreement final.pdf | 21 Jul 2017 |
| Building plan approvalFile: IOD.pdf | 20 Jul 2017 |
| PAN CardFile: PAN - Sylvanus Properties Ltd.PDF | 20 Jul 2017 |
| Copy of the legal title reportFile: Legal Title 1.pdf | 20 Jul 2017 |
| Copy of the legal title reportFile: Legal Title 2.pdf | 20 Jul 2017 |
| Copy of the legal title reportFile: Legal Title 3.pdf | 20 Jul 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 20 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 42 filed documents as one ZIP, foldered, with a manifest
Keep Indiabulls Savroli - 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Khalapur Toll Naka5,900+ in Raigarh
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
Godrej Woodside Estate Phase 1
Godrej Projects Development Limited
Indiabulls Savroli - 3
Sylvanus Properties Limited
VRINDAVAN FLORA
Thalia Vastu Infra Projects
World Villas Phase 1
ARIHANT SUPERSTRUCTURES LIMITED
Basalt Hills
VIYONAA WORLD LLP
Magic Hill Enclave
Garnet Construction Ltd.
See every Raigarh project, with the district possession charts
Builder: Sylvanus Properties Limited
Sylvanus Properties Limited has 3 registrations on MahaRERA, including Indiabulls Savroli - 3 and Indiabulls Savroli - 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Indiabulls Savroli - 1 is delayed beyond 28 Feb 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Indiabulls Savroli - 1?
The registered promoter entity is Sylvanus Properties Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Indiabulls Savroli - 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Indiabulls Savroli - 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Indiabulls Savroli - 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Indiabulls Savroli - 1?
The professionals named in the filing: Architect: Anupam De & Associates; Architect: Octave Consultants; Architect: Rakhi Ubhare; Engineer: Mr Ramesh Rampure; Chartered Accountant: Agarwal Prakash & Co; Chartered Accountant: Sundar Venkataraman & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Indiabulls Savroli - 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback