Home / Browse projects / Pune, Maharashtra / IMPERIAL MIST

Registration lapsed No litigation declared Commercial project

IMPERIAL MIST

By Imperial Housing

RG-MH-98054 · RERA P52100046615 · Last updated on MahaRERA portal: 20 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

IMPERIAL MIST is a Commercial project by Imperial Housing in Pune, Maharashtra, registered with MahaRERA as P52100046615 on 25 Aug 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameIMPERIAL MIST
  • TypeCommercial
  • Location
    • PUNE
    • BALEWADI
    • Haveli
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100046615
  • ReraGenie IDRG-MH-98054

Builder

  • NameImperial Housing
  • Entity typePartnership
  • PartnersANUJ R MEHTA, TIMIR R MEHTA, DHRUVAL K MEHTA, HARESH G CHAUHAN, ARVIND G CHAUHAN, RAJESH G CHAUHAN, BIPIN S SOLANKI, JAYSUKH S SOLANKI, SARVANG N DESAI, RUSHABH A SHAH

Key dates

10 months past promisethis monthRegisteredAug 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Aug 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IMPERIAL MISTNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

IMPERIAL MIST: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Open Space67

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,210 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on25 Sep 2024

Approvals and building plan

Sanctioning authorityPune Municipal Carporation
Permissible FSI3468.78
Proposed, not sanctioned3,469 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBoriwali west shop no 2-6 shroff arcade sodawala lane near mumbai 400092

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Imperial Housing-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold .pdf20 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Final Imperial.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Imperial Mist Form 5 2324 (1).pdf19 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Promoter Letterhead Imperial Housing.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate mist.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate Mist.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Mist.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory mist.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate_20240717_0001.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Imperial June Engg.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: Imperial June Inventory.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Imperial June CA.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate _compressed (1).pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate _compressed.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate _compressed.pdf14 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory .pdf14 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate _organized_compressed.pdf14 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 Architect Certificte_compressed.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 Enginee Certificate_compressed.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: 5 Sold Unsold Inventory.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 C A Certificate_compressed.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate _11zon.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer quality Assurance Certificate .pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer quality Assurance Certificate .pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate _11zon.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 C A Certificate .pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (2)_compressed.pdf18 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Annexure C.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (1) (1)_compressed.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate form 1.pdf15 Jul 2023
Disclosure of sold/ booked inventoryFile: Inventory.pdf15 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (8).pdf11 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - MIST.pdf27 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf27 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate Form 2A.pdf27 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: C A Certificate - Imperial.pdf27 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate - Ravikant Chavhan.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: Imperial - Unsold Inventory.pdf19 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - Certificate Mist_compressed.pdf19 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Imperial CA.pdf9 Aug 2022
Copy of the legal title reportFile: STR-Timir Mehta-Balewadi-23-6-A_compressed.pdf8 Aug 2022
Proforma of Allotment letterFile: Allotment Imperial (1).pdf6 Aug 2022
Deviation Report with respect to Allotment letterFile: Imperial Deviation Allotment Flat.pdf6 Aug 2022
Details of encumbrances concerned to FinanceFile: Fin Imp.pdf3 Aug 2022
Details of encumbrances concerned to LegalFile: Legal Imp.pdf3 Aug 2022
Proforma of Allotment letterFile: AFS Imperial (1).pdf3 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Imp Bank Dec.pdf3 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Imp Dev AFS.pdf3 Aug 2022
Layout approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf25 Jul 2022
Copy of Layout Approval (in case of layout)File: 2 Building Plan Approval _ NA Order for plotted development.pdf25 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner Jul 22, 2022 4-49 PM_compressed.pdf23 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200242948286_For_Asset_Based_Search_23_07_2022_15_09_07_470.pdf23 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_compressed.pdf22 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A.pdf22 Jul 2022
Building plan approvalFile: Approved plan 1_11zon.pdf8 Jul 2022
Building plan approvalFile: Approved plan 2_11zon.pdf8 Jul 2022
PAN CardFile: Imperial Housing Pan Card.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 1_11zon.pdf8 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 2_11zon.pdf8 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf8 Jul 2022
Declaration about Commencement CertificateFile: Declaration About Commencment Certificate Rera.pdf8 Jul 2022
Declaration in FORM BFile: AFFIDEVITE.pdf8 Jul 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IMPERIAL MIST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALEWADI13,700+ in Pune

2 kmIMPERIAL MISTCompleted 159Lapsed / revoked 60Other 159Dot size: filed unitsN

Filed coordinates, straight-line distance. 378 registered projects within 2 km.

Builder: Imperial Housing

Imperial Housing has 1 registration on MahaRERA, including IMPERIAL MIST. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that IMPERIAL MIST shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if IMPERIAL MIST is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IMPERIAL MIST?

The registered promoter entity is Imperial Housing, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IMPERIAL MIST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IMPERIAL MIST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in IMPERIAL MIST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IMPERIAL MIST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IMPERIAL MIST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.