Home / Browse projects / Kolhapur, Maharashtra / IDEAL COLONY PHASE- II

Completed No litigation declared Residential / Group Housing project

IDEAL COLONY PHASE- II

By THE IDEAL CONSTRUCTION

RG-MH-27589 · RERA P53000034244 · Last updated on MahaRERA portal: 1 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

IDEAL COLONY PHASE- II is a Residential / Group Housing project by THE IDEAL CONSTRUCTION in Kolhapur, Maharashtra, registered with MahaRERA as P53000034244 on 25 Mar 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameIDEAL COLONY PHASE- II
  • TypeResidential / Group Housing
  • Location
    • D Ward Kasaba Karveer
    • Sutarmala Kolhapur
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416010
  • Pincode416010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000034244
  • ReraGenie IDRG-MH-27589

Builder

  • NameTHE IDEAL CONSTRUCTION
  • Entity typePartnership
  • GSTIN27AAHFT0947N1ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersARCHANA ATUL POWAR, SHANTANU ATUL POWAR
  • Other registrations4 more →
  • Completed5 of 5
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA100000
DNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

C73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,655 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI21298.57
Proposed, not sanctioned15,299 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOLHAPUR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAP Associates
EngineerA B Kulkarni & Assoicates
EngineerShujat Abdulkadar Nadaf
Chartered AccountantKedar P Hasabnis
PartnerRole in project
THE IDEAL CONSTRUCTION-

Litigation declared1

CaseCourtStatus
92/2020Waqf Tribunal AurangabadSuit is Dissmissed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Jul 2024

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: Discolsure of Sold Unsold 31122024 Ideal Construction phase 2.pdf1 Feb 2025
Details of encumbrances concerned to LegalFile: Discolsure of Sold Unsold 31122024 Ideal Construction phase 2.pdf1 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Ideal Colony Completion Certificate Phase 2.pdf27 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate Phase 2.pdf27 Jul 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Ideal Colony Society Certificate.pdf27 Jul 2024
Status of ConveyanceFile: OC Adjudication File Submit.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31032024 Ideal Construction phase 2.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032024 Ideal Construction Phase 2.pdf25 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31032024 Ideal Construction Phase 2.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Unsold 31032024 Ideal Construction phase 2.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032024 Ideal Construction Phase 2.pdf25 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31122023 Ideal Construction phase 2.pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31122023 Ideal Construction Phase 2.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31122023 Ideal Construction Phase 2.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Unsold 31122023 Ideal Construction phase 2.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122023 Ideal Construction Phase 2.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30092023 Ideal Construction.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30092023 Ideal Construction.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 30092023 Ideal Construction.pdf23 Nov 2023
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Unsold 30092023 Ideal Construction.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092023 Ideal Construction.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ideal Colony_phase_II_Form 5 FY 2022-23.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate 30062023.pdf25 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate 30062023.pdf25 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062023.pdf25 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 30062023.pdf25 Sep 2023
Disclosure of sold/ booked inventoryFile: Inventory 30062023.pdf25 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 30062023.pdf25 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate 31032023.pdf6 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032023.pdf6 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 31032023.pdf6 Jun 2023
Disclosure of sold/ booked inventoryFile: Inventory 31032023.pdf6 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 31032023.pdf6 Jun 2023
Building plan approvalFile: Plan No 1.pdf24 Mar 2023
Building plan approvalFile: Plan No 2.pdf24 Mar 2023
Building plan approvalFile: Plan No 3.pdf24 Mar 2023
Building plan approvalFile: Plan No 4.pdf24 Mar 2023
Building plan approvalFile: Plan No 5.pdf24 Mar 2023
Building plan approvalFile: Plan No 6.pdf24 Mar 2023
Building plan approvalFile: Plan No 7.pdf24 Mar 2023
Building plan approvalFile: Plan No 8.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 1.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 2.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 3.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 4.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 5.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 6.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 7.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 8.pdf24 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Phase II Sanction Order.pdf24 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality Asurance.pdf6 Feb 2023
Disclosure of sold/ booked inventoryFile: Inventory.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Form 1.pdf24 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf24 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality.pdf24 Dec 2022
Disclosure of sold/ booked inventoryFile: Colony Phase 2 Inventory C D.pdf24 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate.pdf24 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA form 5 FY 2021-22 Phase 2.pdf24 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA form 5 FY 2021-22 Phase 2.pdf24 Dec 2022
Details of encumbrancesFile: Encumbrance.pdf9 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Form 1.pdf16 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf16 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form No 2A Quailty Assurance.pdf16 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 30062022.pdf16 Aug 2022
Layout approvalFile: Sanction Plan 1.pdf16 Mar 2022
Building plan approvalFile: Sanction Plan 2.pdf16 Mar 2022
Building plan approvalFile: Sanction Plan 3.pdf16 Mar 2022
Building plan approvalFile: Sanction Plan 4.pdf16 Mar 2022
Building plan approvalFile: Sanction Plan 5.pdf16 Mar 2022
Copy of the legal title reportFile: Title Search Report.pdf16 Mar 2022
Copy of Layout Approval (in case of layout)File: Sanction Plan 1.pdf16 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2.pdf16 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 3.pdf16 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 4.pdf16 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 5.pdf16 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf16 Mar 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
IDEAL ENRICHR.S.NO.1071 LKASABA KARVEER A WARD PLOT NO 13 SANEGURUJI KOLHAPUR15CompletedDec 2014Oct 2014

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep IDEAL COLONY PHASE- II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sutarmala Kolhapur880+ in Kolhapur

2 kmIDEAL COLONY PHASE- IICompleted 7Lapsed / revoked 3Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: THE IDEAL CONSTRUCTION

THE IDEAL CONSTRUCTION has 5 registrations on MahaRERA, including IDEAL EMBARK and IDEAL COLONY PHASE - I. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if IDEAL COLONY PHASE- II is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IDEAL COLONY PHASE- II?

The registered promoter entity is THE IDEAL CONSTRUCTION, a partnership as per the filing. Its GSTIN 27AAHFT0947N1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IDEAL COLONY PHASE- II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IDEAL COLONY PHASE- II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IDEAL COLONY PHASE- II?

The professionals named in the filing: Architect: GAP Associates; Engineer: A B Kulkarni & Assoicates; Engineer: Shujat Abdulkadar Nadaf; Chartered Accountant: Kedar P Hasabnis. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IDEAL COLONY PHASE- II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IDEAL COLONY PHASE- II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IDEAL COLONY PHASE- II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.