Completed No litigation declared Residential / Group Housing project

ICC

By The Bombay Dyeing and Manufacturing Company Limited

RG-MH-20692 · RERA P51900008726 · Last updated on MahaRERA portal: 2 Mar 2026

Source: official MahaRERA filing

Red flags

  • 70 complaints at MahaRERA
  • Completion date moved by 79 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2026Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
70Complaints at MahaRERAon this registration
Jump to the 244 documents Report an error

ICC is a Residential / Group Housing project by The Bombay Dyeing and Manufacturing Company Limited in Wadala, 400015, registered with MahaRERA as P51900008726 on 19 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 79 months from the original filing. 70 complaints are on record with the regulator.

At a glance

Project

  • NameICC
  • TypeResidential / Group Housing
  • Location
    • G. D. Ambekar Marg
    • Wadala
    • 400015
  • Pincode400015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900008726
  • ReraGenie IDRG-MH-20692

Builder

  • NameThe Bombay Dyeing and Manufacturing Company Limited
  • Entity typeCompany
  • Company SecretorySanjive Inder Arora
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseAug 2019Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Aug 2019)
  • Buildings2 building records
  • Documents filed244 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ONE ICCNA610000
TWO ICCNA680000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

ONE ICC100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TWO ICC100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities20

As on 2 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
9 Nos, passenger lifts for all apartments in ONE ICC;Yes100%
Exclusive double heighted entrance lobby on ground floor for penthouses apartment ownersYes100%
1 number exclusive passenger lift with two sides opening for penthouses apartment owners, use onlyYes100%
OPEN PARKINGNoNot applicable
One common double heighted main entrance lobby on ground floor for all apartment ownersYes100%

Parking filed1379

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,379
Closed/Covered1,379
BuildingClosed/CoveredTotal
ONE ICC506506
TWO ICC873873

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,090 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI122500.0
Proposed, not sanctioned96,964 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCFS, MUMBAI BRANCH, 1ST FLOOR, BALLARD PIER, 3 WALCHAND HIRACHAND MARG, MUMBAI 400038

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS V THAKKER & ASSOCIATES
ArchitectSandeep Shikre & Associates
EngineerJW CONSULTANTS LLP
EngineerSK Consultants & Engineers
PartnerRole in project
The Bombay Dyeing and Manufacturing Company Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900017686Aug 2019 → Mar 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project received Part OC before the due date, all the units that have been sold have taken possession. The units that have not received OC, remain unsold and we intend to retain it for the company as of now.

EXT51900028103Aug 2019 → Mar 2026

Reason as filed by the promoterAS PER ATTACHMENT

Litigation declared26

CaseCourtStatus
906 of 2015 /2015Bombay High CourtApplication Reserved for orders
CC/ 2064/2016 /2016National Consumer ForumNormal course hearing
Richa Karpe and Ekta Verma vs BDMC/2015Honble State Commission MaharashtraMatter withdrawn
708 of 2014/2014Bombay High CourtListed for directions
1273/2005/2005Bombay High CourtFinal Hearing
299/2017 /2017District court of JamshedpurAwaited Listing
26/2013/2013Industrial Court MumbaiAdjourned for Argument and final hearing
2175/2014/2014Bombay High CourtPetition admitted no injuction and final hearing
2439/2014/2014Bombay High CourtPetition admitted no injuction and final hearing
90/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
93/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional document
94/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
95/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
98/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
101/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
102/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
103/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
106/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
111/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
112/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
136/2002/2002IVth Labour Court MumbaiFinal Argument hearing application seeking production of additional documents
2525/2017National CommisionMatter disposed
006000000012638/2017RERA AuthorityMatter disposed off
006000000023507/2018RERA AuthorityMatter disposed off
006000000023427/2018RERA AuthorityFor Settlement
006000000044441/2018RERA AuthorityApprearance

Complaints filed with MahaRERA70

Case no.ComplainantRespondentFiled
CC006000000078478ROYSTON D MASCARENHASTHE BOMBAY DYEING AND MANUFACTURING COMPANY LIMITED15/03/2019
CC006000000078346HARJAS SARBJIT SINGHBOMBAY DYEING AND MANUFACTURING CO LTD19/03/2019
CC006000000023507Richa Saxena KarpeThe Bombay Dyeing & Manufacturing Company Limited27/02/2018
CC006000000012638Pramod Kumar BhambaniBombay Dyeing & Manufacturing Company Limited28/12/2017
CC006000000023427M/ s. Fact Personnel Pvt LtdMr. S. Raja22/02/2018
CC006000000054627PRABHATKUMAR SRIVASTAVABOMBAY DYEING & MANUFACTURING CO. LTD.24/05/2018
CC006000000055925Mrs. Anupama Hem TejujaThe Bombay Dyeing & Mfg. Co. Ltd.30/08/2018
CC006000000055970Mr. Chandarmohan GoyelThe Bombay Dyeing & Mfg. Co. Ltd.06/09/2018
CC006000000056145Mr. Prabhat Kumar Srivastava & Mrs. Kalpana SrivastavaThe Bombay Dyeing & Mfg. Co. Ltd.14/09/2018
CC006000000044441Narayanan VenkitramanThe Bombay Dyeing & Manufacturing Co. Ltd.08/05/2018
CC006000000054648Rohit ChawlaThe Bombay Dyeing & Manufacturing Co. Ltd26/05/2018
CC0060000000556161) Ms. Netra Venkateshwaran 2) Mr. Venkateshwaran KrishnanThe Bombay Dyeing & Manufacturing Co. Ltd03/08/2018
CC006000000055341Vishnu Kumar PoddarThe Bombay Dyeing & Manufacturing Company Limited11/07/2018
CC006000000055445Mr. Srinath SrinivasanThe Bombay Dyeing & Manufacturing Company Limited20/07/2018
CC006000000055572Paresh Harilal SutariaThe Bombay Dyeing and Manufacturing Company Limited30/07/2018
CC006000000055584Ashok NarangThe Bombay Dyeing and Manufacturing Company Limited31/07/2018
CC006000000055814Rajkumar K SharmaThe Bombay Dying & Management Co Ltd14/08/2018
CC006000000055858Mrs. Nidhi Dinesh LodhaThe Bombay Dying & Mfg. Co. Ltd.24/08/2018
CC006000000055870Kersi Homi PatelThe Bombay Dyeing and Manufacturing Company Limited21/08/2018
CC006000000056078Mr. Amit GalaThe Bombay Dyeing & Mfg. Co. Ltd.06/09/2018
CC006000000056128Mr. Surendra Kumar JalanThe Bombay Dyeing & Mfg. Co.14/09/2018
CC006000000056208Mrs. Rekha GaddhyanThe Bombay Dying & Mfg. Co. Ltd.17/09/2018
CC006000000056270Raghavjee ManekThe Bombay Dyeing & Manufacturing Company Limited23/09/2018
CC006000000056333Ashim AhujaBombay Dying And Manufacturing Company Limited26/09/2018
CC006000000292673TRINITY HEIGHTS COOP hSG sOC lIMITEDBombay dyeing and manufacturing company limiited09/01/2024
CC006000000056632Mayank GuptaThe Bombay Dyeing & Manufacturing Co Ltd19/10/2018
CC006000000056699Mr. Akhilesh GuptaThe Bombay Dyeing & Mfg. Co. Ltd.27/10/2018
CC006000000056812Sunita JainThe Bombay Dyeing and Manufacturing Company Limited14/11/2018
CC006000000056902Ashish AgarwalBombay Dyeing Manufacturing Co Ltd13/11/2018
CC006000000057006Mr. Harish SharmaThe Bombay Dyeing & Mfg. Co. Ltd.28/11/2018
CC006000000057285Monalisha RoyBombay Dyeing Manufacturing Pvt Ltd13/12/2018
CC006000000057341Vinit J. KediaBombay Dyeing & Manufacturing Co. Ltd.17/12/2018
CC006000000057421VIRENDRA BHAVANJI GALATHE BOMBAY DYEING AND MANUFACTURINGCOMPANT LIMITED24/12/2018
CC006000000057543SWEEKAR HOUSING PRIVATE LIMITEDThe Bombay Dyeing and Manufacturing Company Limited04/01/2019
CC006000000057507Rashmi JainBombay Dyeing Manufacturing co Pvt Ltd02/01/2019
CC006000000057552SARANG BHAILAL GADATHE BOMBAY DYEING AND MANUFACTURING COMPANY LIMITED05/01/2019
CC006000000057810MONIKA AGARWALBOMBAY DYEING & MANUFACTURINGCO LTD24/01/2019
CC006000000057812SADHANA SABOOBOMBAY DYEING & MANUFACTURING CO LTD24/01/2019
CC006000000068158M/s Pinkcity brokerage Services Pvt LtdThe Bombay Dyeing & MFG Co. Ltd20/02/2019
CC006000000068167MR Pranav GoelThe Bombay Dyeing & Mfg Co. Ltd20/02/2019
CC006000000078173Ms Surabhi GuptaThe Bombay Dyeing & Mfg Co Ltd20/02/2019
CC006000000078170Ms Payal GoelThe Bombay Dyeing & Mfg Co. Ltd20/02/2019
CC006000000078177Mr Sameer NarayanThe Bombay Dyeing & Mfg Co. Ltd20/02/2019
CC006000000078323Manu Chandra and Lara ChandraThe Bombay Dyeing and Manufacturing Company Limited02/03/2019
CC006000000078351Mr Inderchand BaidThe Bombay Dyeing & Mfg Co. Ltd06/03/2019
CC006000000078362NIKHIL BANERJI AND SARMISTHA ROYTHE BOMBAY DYEING & MANUFACTURING COMPANY LIMITED07/03/2019
CC006000000078409Anish Saraf and Shilpa OstawalBombay Dyeing and Manufacturing Limited08/03/2019
CC006000000078417Mr Samir BaidThe Bombay Dyeing & Mfg Co.Ltd11/03/2019
CC006000000078418Mr Manish BaidThe Bombay Dyeing & Mfg Co Ltd11/03/2019
CC006000000078474Mrs. Anupama Vinay Ranade & Mr. Vinay Arvind RanadeThe Bombay Dyeing & Mfg. Co. Ltd.15/03/2019
CC006000000078463Mr. Jitendra Arora and Mrs. Hina Chandok AroraThe Bombay Dyeing & Mfg. Co13/03/2019
CC006000000078481Mr. Vishal MalikThe Bombay Dyeing & Mfg. Co. Ltd.15/03/2019
CC006000000078508Madhulika MalhanBombay Dyeing and Manufacturing Co Ltd16/03/2019
CC006000000078694Aditya MehtaBombay Dyeing & Manufacturing Company Ltd28/03/2019
CC006000000078914Ms Nutan LohchabThe Bombay Dyeing Manufacturing Co Ltd16/04/2019
CC006000000079205Mr. Amit Kansal and Mrs. Richa KansalThe Bombay Dyeing & Manufacturing Co. Ltd.08/05/2019
CC006000000079495VIPUL SHAHThe Bombay Dyeing & Mfg. Co. Ltd.28/05/2019
CC006000000079497Rakesh JhaThe Bombay Dyeing & Mfg. Co. Ltd.28/05/2019
CC006000000079499Ajay JainThe Bombay Dyeing & Mfg. Co. Ltd.28/05/2019
CC006000000079503Rajan VaswaniThe Bombay Dyeing & Mfg. Co. Ltd.28/05/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 May 2024

Documents filed244

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 244 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - ICC as on Dec 2025.pdf2 Mar 2026
Form 2File: Form 2 - ICC as on Dec 2025.pdf2 Mar 2026
Form 3File: Form 3 - ICC as on Dec 2025.pdf2 Mar 2026
Disclosure of Sold and Booked InventoryFile: Circular 29_compressed (2).pdf2 Mar 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf6 May 2025
Certificates of CA (Form 3)File: Form 3.pdf6 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf6 May 2025
Declaration in FORM BFile: AFFIDAVIT CUM DELARATION_Signed.pdf2 Apr 2025
Declaration in FORM BFile: AFFIDAVIT CUM DELARATION_Signed.pdf2 Apr 2025
Certificates of CA (Form 3)File: Form 3 - 150325.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked inventory-300624.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked inventory-300924.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked inventory-311224.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked inventory-150324.pdf2 Apr 2025
CERSAI detailsFile: Cersai Declaration.pdf2 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Account Declaration.pdf2 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2024.pdf23 Jan 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on Dec 2024.pdf23 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2024.pdf23 Jan 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on Dec 2024.pdf23 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2024.pdf23 Jan 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on Dec 2024.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on June 2024 (1).pdf15 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on Sept 2024 (1).pdf15 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on June 2024 (1).pdf15 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on Sept 2024 (1).pdf15 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on June 2024 (1).pdf15 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on Sept 2024 (1).pdf15 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ICC Form 5 2023-24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ICC Form 5 2023-24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ICC Form 5 2023-24.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on March 2024.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - ICC as on March 2024.pdf7 May 2024
Certificates of CA (Form 3)File: Form 3 - ICC as on March 2024.pdf7 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: One ICC-09_Part OC_letter dated 22-03-2024.pdf4 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on June 2023.pdf11 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on Sept 2023.pdf11 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - ICC as on Dec 2023.pdf11 Jan 2024
Certificates of CA (Form 3)File: Form 3 - ICC as on June 2023.pdf9 Jan 2024
Certificates of CA (Form 3)File: Form 3 - ICC as on Sept 2023.pdf9 Jan 2024
Certificates of CA (Form 3)File: Form 3 - ICC as on Dec 2023.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 Form 1 - Jun 23.pdf6 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Form 1 - Sept 23.pdf6 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 Form 1 - Dec 23.pdf6 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold unsold revised.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Circular 29-Sold Unsold.pdf11 Oct 2023
Declaration about Commencement CertificateFile: Format D (32).pdf10 Oct 2023
Declaration in FORM BFile: Form B ICC.pdf10 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Two ICC OC.pdf4 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2022-23-BR GIRISH CHAUDHARI.pdf29 Jun 2023
Building plan approvalFile: Page 1.pdf24 Jun 2023
Building plan approvalFile: Page 2-4.pdf24 Jun 2023
Building plan approvalFile: Page 5-9.pdf24 Jun 2023
Building plan approvalFile: Page 10-15.pdf24 Jun 2023
Building plan approvalFile: Page 16-20.pdf24 Jun 2023
Building Plan Approval (IOD)File: Page 1.pdf24 Jun 2023
Building Plan Approval (IOD)File: Page 2-4.pdf24 Jun 2023
Building Plan Approval (IOD)File: Page 5-9.pdf24 Jun 2023
Building Plan Approval (IOD)File: Page 10-15.pdf24 Jun 2023
Building Plan Approval (IOD)File: Page 16-20.pdf24 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Form 1 - Mar 23.pdf23 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: BR FORM 2A_2019-20.pdf23 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: BR FORM NO 2A_2020-21.pdf23 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: BR FORM NO 2A 12_2021-22.pdf23 Jun 2023
Certificates of CA (Form 5)File: 1 Form 5 Audit Report - BDMC - FY-2017-18.pdf23 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Form 5 Audit Report - BDMC - FY-2018-19.pdf23 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 3 Form 5 Audit Report - - BDMC - FY-2019-20.pdf23 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 4 Form 5 Audit Report - BDMC - FY - 2020-21.pdf23 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 5 Form 5- BDMC - FY-2021-22.pdf23 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: One ICC OC Part I 22032019.pdf23 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: One ICC OC Part II 29062019.pdf23 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ONE ICC OC Part III 20012023.pdf23 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: TWO ICC OC Part I 15032019.pdf23 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: TWO ICC OC Part II 29062019.pdf23 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 20.pdf22 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 21_compressed.pdf22 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Building No 2 -Axis BankWadia International Center Pandurang Budhkar Marg Mumbai 400 0251CompletedSep 2010Sep 2010

Keep ICC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadala

2 kmICCCompleted 3Lapsed / revoked 6Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: The Bombay Dyeing and Manufacturing Company Limited

The Bombay Dyeing and Manufacturing Company Limited has 1 registration on MahaRERA, including ICC. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if ICC is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ICC?

The registered promoter entity is The Bombay Dyeing and Manufacturing Company Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ICC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ICC?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ICC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ICC?

The professionals named in the filing: Architect: S V THAKKER & ASSOCIATES; Architect: Sandeep Shikre & Associates; Engineer: JW CONSULTANTS LLP; Engineer: SK Consultants & Engineers. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ICC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ICC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ICC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.