Home / Browse projects / Thane, Maharashtra / HUDA PARK
HUDA PARK
RG-MH-96797 · RERA P51700016090 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HUDA PARK is a Others project by HUDA CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700016090 on 17 Apr 2018. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 100 of the 126 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameHUDA PARK
- TypeOthers
- Location
- KHARDI ROAD
- KAUSA MUMBRA
- Thane (M Corp.)
- Thane
- 400612
- Pincode400612
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700016090
- ReraGenie IDRG-MH-96797
Builder
- NameHUDA CONSTRUCTION
- Entity typePartnership
- PartnersABDUL SALAM MOHAMMED SAMI KHAN, MOHAMMED ASLAM HASAN MIYA SURME, ALTAF AHMED SHAIKH, MOHD JAFER NASIR KHAN
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Apr 2018
- Promised completion30 Dec 2025
- Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 29 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HUDA PARK | NA | 21 | 21 | 118 | 8 | 126 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
HUDA PARK: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed49
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JOSHI DESHAWARE |
| Chartered Accountant | HEENA NADEEM PAWASKAR |
| Chartered Accountant | KARAN SURENDRA SINGH |
| Partner | Role in project |
|---|---|
| HUDA CONSTRUCTION | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterConstruction stopped because of financial issues & Overall industry slowdown during the period. Now construction work started at the site & is in full swing.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 Q2.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 Q3.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: Huda Construction.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: Huda Construction.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: Huda Construction.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 signed.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 signed.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 signed.pdf | 29 Apr 2026 |
| Form 3File: FORM 3 Excel.pdf | 27 Apr 2026 |
| Form 1File: FORM 1.pdf | 27 Apr 2026 |
| Form 2File: 2100_Huda Construction_Form 2-March 25Q.pdf | 27 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 (2).pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: Huda Construction.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 Excel.pdf | 27 Apr 2026 |
| Form 1File: FORM-1.pdf | 24 Jun 2025 |
| Form 2File: FORM 2.pdf | 24 Jun 2025 |
| Form 3File: FORM 3 Excel.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 24 Jun 2025 |
| Form 5 (FY 2018-2019)File: FORM 5.pdf | 24 Jun 2025 |
| Form 5 (FY 2019-2020)File: FORM 5 19-20.pdf | 24 Jun 2025 |
| Form 5 (FY 2020-2021)File: FORM 5.pdf | 24 Jun 2025 |
| Form 5 (FY 2021-2022)File: Rera form 5.pdf | 24 Jun 2025 |
| Form 5 (FY 2022-2023)File: Form 5 Huda.pdf | 24 Jun 2025 |
| Form 5 (FY 2023-2024)File: form 5.pdf | 24 Jun 2025 |
| Declaration in FORM BFile: form b new 500.pdf | 21 Mar 2025 |
| OtherFile: form b new 500.pdf | 12 Mar 2025 |
| OtherFile: FORM B.pdf | 5 Mar 2025 |
| Certificates of CA (Form 3)File: FORM 3 Excel.pdf | 22 Feb 2025 |
| CERSAI detailsFile: CERSAI_Search_Report_200341472717_For_Asset_Based_Search_22_02_2025_15_33_34_952.pdf | 22 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST - ABDUL SALAM KHAN.pdf | 11 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST - ALTAF AHMED SHAIKH.pdf | 11 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST - MOHD ADIL SIDDIQUE KHAN.pdf | 11 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST - MOHD ASLAM SURME.pdf | 11 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST - MOHD JAFER NASIR KHAN.pdf | 11 Feb 2025 |
| Declaration in FORM BFile: FORM B.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: form 3.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.pdf | 6 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A .pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 final.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY-compressed.pdf | 3 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf | 6 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3_22-23.pdf | 29 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf | 29 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rera form 5.pdf | 11 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5.pdf | 31 Mar 2022 |
| Declaration about Commencement CertificateFile: Huda CC.pdf | 18 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Huda booked invent.pdf | 18 Aug 2021 |
| Certificates of CA (Form 3)File: HUDA.pdf | 18 Aug 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Huda society.pdf | 18 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Huda Form1 16082021_compressed.pdf | 17 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Huda Construction.pdf | 17 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Huda Park 08-14-2021.pdf | 14 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5.pdf | 14 Apr 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_compressed.pdf | 3 Mar 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: HUDA CONSTRUCTION FORM 5.pdf | 21 Dec 2019 |
| OtherFile: plinth.pdf | 17 Sep 2019 |
| Details of encumbrancesFile: Encumbrance.pdf | 14 Apr 2018 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Apr 2018 |
| Proforma of Allotment letterFile: sale aggrement.pdf | 14 Apr 2018 |
| Building plan approvalFile: IOD.pdf | 13 Apr 2018 |
| Layout approvalFile: blue print.pdf | 13 Apr 2018 |
| PAN CardFile: PAN.pdf | 13 Apr 2018 |
| Copy of the legal title reportFile: Advocate certificate.pdf | 13 Apr 2018 |
| Copy of Layout Approval (in case of layout)File: blue print.pdf | 13 Apr 2018 |
| Building Plan Approval (IOD)File: IOD.pdf | 13 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 13 Apr 2018 |
| Declaration in FORM BFile: form B.pdf | 13 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf | 13 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certicate.pdf | 13 Apr 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HUDA PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KAUSA MUMBRA7,600+ in Thane
Filed coordinates, straight-line distance. 101 registered projects within 2 km.
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: HUDA CONSTRUCTION
HUDA CONSTRUCTION has 1 registration on MahaRERA, including HUDA PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that HUDA PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HUDA PARK is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HUDA PARK?
The registered promoter entity is HUDA CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HUDA PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HUDA PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HUDA PARK?
The professionals named in the filing: Architect: JOSHI DESHAWARE; Chartered Accountant: HEENA NADEEM PAWASKAR; Chartered Accountant: KARAN SURENDRA SINGH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HUDA PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback