Home / Browse projects / Mumbai City, Maharashtra / Hubtown Vedant- 14th To 18th Floor

Registration lapsed No litigation declared Residential / Group Housing project

Hubtown Vedant- 14th To 18th Floor

By Citywood Builders Private Limited

RG-MH-10335 · RERA P51900000465 · Last updated on MahaRERA portal: 2 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
1 of 39Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

Hubtown Vedant- 14th To 18th Floor is a Residential / Group Housing project by Citywood Builders Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900000465 on 18 Jul 2017. Possession was promised by 28 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 38 of the 39 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameHubtown Vedant- 14th To 18th Floor
  • TypeResidential / Group Housing
  • Location
    • Mukundrao Road
    • Rawli Camp
    • Sardar Nagar 4
    • Sion-Koliwada
    • Mumbai City
    • 400037
  • Pincode400037
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900000465
  • ReraGenie IDRG-MH-10335

Builder

  • NameCitywood Builders Private Limited
  • Entity typeCompany
  • DirectorRajesh Yashwantrao Bagal

Key dates

10 months past promisethis monthRegisteredJul 2017First promiseDec 2023Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Jul 2017
  • Promised completion28 Dec 2025
  • Revised completionRevised to 28 Dec 2025 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed112 files

Current status

97%38 of 39 units booked
99.3%Work done, per cost certificate

Figures as on 2 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hubtown Vedant- 14th to 18th FloorNA23539039

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Hubtown Vedant- 14th to 18th Floor: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed86

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots86
Closed/Covered68
Open Space18

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area881 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Oct 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2469.02
Proposed, not sanctioned2,469 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIDC Andheri East
Estimated costRs 36.40 cr
Cost incurredRs 36.16 cr
Work done99.33%
BuildingWingEstimatedIncurred
Hubtown Vedant- 14th to 18th FloorNARs 31.31 crRs 31.19 cr
-NARs 5.10 crRs 4.97 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCitigold Managment Pvt Ltd
ArchitectSUSAN JOHN
EngineerRajivan Paramban
Chartered AccountantSanket Shah
Chartered AccountantAnand A Yadav & Associates
PartnerRole in project
Citywood Builders Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900018326Dec 2023 → Dec 2024

Reason as filed by the promoterAwaiting for OC

EXT51900027508Dec 2023 → Dec 2025

Reason as filed by the promoterThis RERA registration from 14th to 18th floor of Vedant building. We have received OCC till 17th floor and uploaded on the portal. Possessions till 17th floor has been handed over to the allottees/purchasers. OC is pending only for the 18th floor which is the last floor. Permission awaited from MCGM.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000198584Deven PokleCitywood Builders Limited16/10/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jan 2024

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: P51900000465 - VEDANT (1).pdf2 Dec 2025
Withdrawal Update Form 2File: Engineers Certificate - Vedant - Sep 25.pdf2 Dec 2025
Withdrawal Update Form 3File: VEDANT-FORM-3-SEP.pdf2 Dec 2025
Form 5 (FY 2024-2025)File: VEDANT.pdf30 Sep 2025
Form 1File: Arch Certificate_Vedant_June 25.pdf20 Aug 2025
Form 2File: Engg Certificate_Vedant_June 25.pdf20 Aug 2025
Form 3File: CA Certificate_Vedant_June 25.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_Vedant_June 25.pdf20 Aug 2025
Declaration in FORM BFile: Form B.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I-Vedant 14th to 18th floor_Feb 2025.pdf28 Feb 2025
OtherFile: Application for Extension-Vedant 14th to 18th floor with possession letter_11zon.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I-Vedant 14th to 18th floor_Feb 2025.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory_Dec 24.pdf27 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Vedant 14th to 18th floor_FY 23-24.pdf24 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Dec 24 - Vedant.pdf12 Feb 2025
Certificates of CA (Form 3)File: FORM III June 23_Vedant (1).pdf5 Feb 2025
Certificates of CA (Form 3)File: FORM III Vedant.pdf5 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000465 - VEDANT - Dec 2024.pdf2 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Sep 24 - Vedant.pdf23 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000465 - VEDANT.pdf22 Oct 2024
Certificates of CA (Form 5)File: Form 5-Vedant-FY 23-24.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Vedant-FY 23-24.pdf21 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant_Mar 24.pdf29 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant 14th to 18th floor_Dec 23.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate - Vedant_Dec 23.pdf14 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CITYWOOD BUILDERS CERTIFICATE (1).pdf14 Jun 2024
Certificates of CA (Form 3)File: Form 3_Vedant_Dec 23.pdf14 Jun 2024
Certificates of CA (Form 3)File: VEDANT Form III_March 24.pdf14 Jun 2024
Layout approvalFile: Layout approval-Vedant.pdf12 Jan 2024
Building plan approvalFile: 01-VEDANT SALE BUILDING AMENDED APPROVAL COVERING LETTER-02ND-FEB-2018.pdf12 Jan 2024
Building plan approvalFile: Amended Approval - Sale Bldg SRA-ENG-1012-FN-ML-AP_11zon.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: Layout approval-Vedant.pdf12 Jan 2024
Building Plan Approval (IOD)File: 01-VEDANT SALE BUILDING AMENDED APPROVAL COVERING LETTER-02ND-FEB-2018.pdf12 Jan 2024
Building Plan Approval (IOD)File: Amended Approval - Sale Bldg SRA-ENG-1012-FN-ML-AP_11zon.pdf12 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 04-VEDANT SALE BUILDING FCC RE ENDORSED UPTO 18TH FLOOR-24-MAR-2023 (1).pdf12 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293038545_Vedant.pdf10 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Rajesh Bagal_DIN.pdf10 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Jasimne Rathod_DIN.pdf10 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Prafphul Shinde_DIN.pdf10 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Disclosure.pdf10 Jan 2024
Declaration about Commencement CertificateFile: Declaration of CC_Vedant.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold inventory_Vedant.pdf8 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Kaagaz_20240104_154427836766.pdf4 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE CITYWOOD BUILDERS.pdf27 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 04-VEDANT SALE BUILDING FCC RE ENDORSED UPTO 18TH FLOOR-24-MAR-2023.pdf25 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate - Vedant.pdf25 Dec 2023
Certificates of CA (Form 3)File: Citywood From 3.pdf25 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000465 - VEDANT.pdf21 Oct 2023
Certificates of CA (Form 5)File: CITYWOOD BUILDERS PVT LTD - FORM 5.pdf14 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CITYWOOD BUILDERS PVT LTD - FORM 5.pdf14 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant_Sept 22.pdf12 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant_Dec 22.pdf12 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant (14th to 18th floor)_Mar 23.pdf12 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000465 - VEDANT.pdf12 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arch Certificate_Vedant (14th to 18th floor)_Mar 23.pdf12 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Vedant_Mar 23.pdf12 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA Certificate_Vedant_Mar 22.pdf12 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vedant Form 2A.pdf12 Aug 2023
Certificates of CA (Form 3)File: FORM III June 23_Vedant.pdf12 Aug 2023
Certificates of CA (Form 3)File: FORM III Vedant Mar 23.pdf10 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: 03-VEDANT SALE BUILDING FCC RE ENDORSED UPTO 18TH FLOOR-08-DEC-2022.pdf4 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE VEDANT - JUN 22.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE VEDANT - SEP 22.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE VEDANT - DEC 22.pdf2 Feb 2023
Certificates of CA (Form 3)File: FORM III (2).pdf31 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 (1).pdf31 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CITYWOOD FORM V March 2019.pdf4 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Mar 20 - Citywood 14 to 18 Flr.pdf4 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Form 5 Mar 21 - Vedant 14 to 18 Flr.pdf4 Jan 2023
Certificates of CA (Form 3)File: Vedant Form III Sep 22.pdf3 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant_June 22.pdf12 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE March 22 - Vedant_compressed.pdf17 May 2022
Certificates of CA (Form 3)File: Vedant _ Mar 22_FORM III_compressed.pdf17 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vedant.pdf9 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Citywood builders vedant 14 to 18 floor_compressed.pdf12 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality certificate Citywood builders vedant 14 to 18 floor_compressed.pdf12 Jan 2022
Certificates of CA (Form 3)File: FORM III VEDANT _Dec 21 (1)_compressed.pdf10 Jan 2022
Certificates of CA (Form 3)File: CA Form 3_Vedant (14 to 18 flr_Sept 21.pdf8 Oct 2021
Certificates of CA (Form 5)File: CA Form 5 (Mar 21) - Vedant (14 to 18 Flr).pdf28 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 09 Vedant 14th to 18th floor architect certificate-31122020 Vishal 010221.pdf2 Feb 2021

How this compares with Mumbai City

97%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 24 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hubtown Vedant- 14th To 18th Floor on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sion-Koliwada780+ in Mumbai City

2 kmHubtown Vedant- 14th To Completed 32Lapsed / revoked 25Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: Citywood Builders Private Limited

Citywood Builders Private Limited has 1 registration on MahaRERA, including Hubtown Vedant- 14th To 18th Floor. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that Hubtown Vedant- 14th To 18th Floor shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Hubtown Vedant- 14th To 18th Floor is delayed beyond 28 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hubtown Vedant- 14th To 18th Floor?

The registered promoter entity is Citywood Builders Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hubtown Vedant- 14th To 18th Floor?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Hubtown Vedant- 14th To 18th Floor?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Hubtown Vedant- 14th To 18th Floor?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hubtown Vedant- 14th To 18th Floor?

The professionals named in the filing: Architect: Citigold Managment Pvt Ltd; Architect: SUSAN JOHN; Engineer: Rajivan Paramban; Chartered Accountant: Sanket Shah; Chartered Accountant: Anand A Yadav & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hubtown Vedant- 14th To 18th Floor?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hubtown Vedant- 14th To 18th Floor. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hubtown Vedant- 14th To 18th Floor to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.