Hubtown Vedant- 14th To 18th Floor
By Citywood Builders Private Limited
RG-MH-10335 · RERA P51900000465 · Last updated on MahaRERA portal: 2 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Hubtown Vedant- 14th To 18th Floor is a Residential / Group Housing project by Citywood Builders Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900000465 on 18 Jul 2017. Possession was promised by 28 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 38 of the 39 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameHubtown Vedant- 14th To 18th Floor
- TypeResidential / Group Housing
- Location
- Mukundrao Road
- Rawli Camp
- Sardar Nagar 4
- Sion-Koliwada
- Mumbai City
- 400037
- Pincode400037
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900000465
- ReraGenie IDRG-MH-10335
Builder
- NameCitywood Builders Private Limited
- Entity typeCompany
- DirectorRajesh Yashwantrao Bagal
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Jul 2017
- Promised completion28 Dec 2025
- Revised completionRevised to 28 Dec 2025 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed112 files
Current status
Figures as on 2 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Hubtown Vedant- 14th to 18th Floor | NA | 23 | 5 | 39 | 0 | 39 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Hubtown Vedant- 14th to 18th Floor: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed86
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Hubtown Vedant- 14th to 18th Floor | NA | Rs 31.31 cr | Rs 31.19 cr |
| - | NA | Rs 5.10 cr | Rs 4.97 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Citigold Managment Pvt Ltd |
| Architect | SUSAN JOHN |
| Engineer | Rajivan Paramban |
| Chartered Accountant | Sanket Shah |
| Chartered Accountant | Anand A Yadav & Associates |
| Partner | Role in project |
|---|---|
| Citywood Builders Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAwaiting for OC
Reason as filed by the promoterThis RERA registration from 14th to 18th floor of Vedant building. We have received OCC till 17th floor and uploaded on the portal. Possessions till 17th floor has been handed over to the allottees/purchasers. OC is pending only for the 18th floor which is the last floor. Permission awaited from MCGM.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000198584 | Deven Pokle | Citywood Builders Limited | 16/10/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Jan 2024
Documents filed112
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: P51900000465 - VEDANT (1).pdf | 2 Dec 2025 |
| Withdrawal Update Form 2File: Engineers Certificate - Vedant - Sep 25.pdf | 2 Dec 2025 |
| Withdrawal Update Form 3File: VEDANT-FORM-3-SEP.pdf | 2 Dec 2025 |
| Form 5 (FY 2024-2025)File: VEDANT.pdf | 30 Sep 2025 |
| Form 1File: Arch Certificate_Vedant_June 25.pdf | 20 Aug 2025 |
| Form 2File: Engg Certificate_Vedant_June 25.pdf | 20 Aug 2025 |
| Form 3File: CA Certificate_Vedant_June 25.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold_Vedant_June 25.pdf | 20 Aug 2025 |
| Declaration in FORM BFile: Form B.pdf | 28 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I-Vedant 14th to 18th floor_Feb 2025.pdf | 28 Feb 2025 |
| OtherFile: Application for Extension-Vedant 14th to 18th floor with possession letter_11zon.pdf | 28 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I-Vedant 14th to 18th floor_Feb 2025.pdf | 27 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory_Dec 24.pdf | 27 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Vedant 14th to 18th floor_FY 23-24.pdf | 24 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Dec 24 - Vedant.pdf | 12 Feb 2025 |
| Certificates of CA (Form 3)File: FORM III June 23_Vedant (1).pdf | 5 Feb 2025 |
| Certificates of CA (Form 3)File: FORM III Vedant.pdf | 5 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000465 - VEDANT - Dec 2024.pdf | 2 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Sep 24 - Vedant.pdf | 23 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000465 - VEDANT.pdf | 22 Oct 2024 |
| Certificates of CA (Form 5)File: Form 5-Vedant-FY 23-24.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Vedant-FY 23-24.pdf | 21 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant_Mar 24.pdf | 29 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant 14th to 18th floor_Dec 23.pdf | 14 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate - Vedant_Dec 23.pdf | 14 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CITYWOOD BUILDERS CERTIFICATE (1).pdf | 14 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3_Vedant_Dec 23.pdf | 14 Jun 2024 |
| Certificates of CA (Form 3)File: VEDANT Form III_March 24.pdf | 14 Jun 2024 |
| Layout approvalFile: Layout approval-Vedant.pdf | 12 Jan 2024 |
| Building plan approvalFile: 01-VEDANT SALE BUILDING AMENDED APPROVAL COVERING LETTER-02ND-FEB-2018.pdf | 12 Jan 2024 |
| Building plan approvalFile: Amended Approval - Sale Bldg SRA-ENG-1012-FN-ML-AP_11zon.pdf | 12 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Layout approval-Vedant.pdf | 12 Jan 2024 |
| Building Plan Approval (IOD)File: 01-VEDANT SALE BUILDING AMENDED APPROVAL COVERING LETTER-02ND-FEB-2018.pdf | 12 Jan 2024 |
| Building Plan Approval (IOD)File: Amended Approval - Sale Bldg SRA-ENG-1012-FN-ML-AP_11zon.pdf | 12 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 04-VEDANT SALE BUILDING FCC RE ENDORSED UPTO 18TH FLOOR-24-MAR-2023 (1).pdf | 12 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293038545_Vedant.pdf | 10 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Rajesh Bagal_DIN.pdf | 10 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Jasimne Rathod_DIN.pdf | 10 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Prafphul Shinde_DIN.pdf | 10 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Disclosure.pdf | 10 Jan 2024 |
| Declaration about Commencement CertificateFile: Declaration of CC_Vedant.pdf | 8 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold inventory_Vedant.pdf | 8 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Kaagaz_20240104_154427836766.pdf | 4 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE CITYWOOD BUILDERS.pdf | 27 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 04-VEDANT SALE BUILDING FCC RE ENDORSED UPTO 18TH FLOOR-24-MAR-2023.pdf | 25 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate - Vedant.pdf | 25 Dec 2023 |
| Certificates of CA (Form 3)File: Citywood From 3.pdf | 25 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000465 - VEDANT.pdf | 21 Oct 2023 |
| Certificates of CA (Form 5)File: CITYWOOD BUILDERS PVT LTD - FORM 5.pdf | 14 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CITYWOOD BUILDERS PVT LTD - FORM 5.pdf | 14 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant_Sept 22.pdf | 12 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant_Dec 22.pdf | 12 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant (14th to 18th floor)_Mar 23.pdf | 12 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000465 - VEDANT.pdf | 12 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arch Certificate_Vedant (14th to 18th floor)_Mar 23.pdf | 12 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Vedant_Mar 23.pdf | 12 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA Certificate_Vedant_Mar 22.pdf | 12 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vedant Form 2A.pdf | 12 Aug 2023 |
| Certificates of CA (Form 3)File: FORM III June 23_Vedant.pdf | 12 Aug 2023 |
| Certificates of CA (Form 3)File: FORM III Vedant Mar 23.pdf | 10 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 03-VEDANT SALE BUILDING FCC RE ENDORSED UPTO 18TH FLOOR-08-DEC-2022.pdf | 4 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE VEDANT - JUN 22.pdf | 2 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE VEDANT - SEP 22.pdf | 2 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE VEDANT - DEC 22.pdf | 2 Feb 2023 |
| Certificates of CA (Form 3)File: FORM III (2).pdf | 31 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 (1).pdf | 31 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CITYWOOD FORM V March 2019.pdf | 4 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Mar 20 - Citywood 14 to 18 Flr.pdf | 4 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Form 5 Mar 21 - Vedant 14 to 18 Flr.pdf | 4 Jan 2023 |
| Certificates of CA (Form 3)File: Vedant Form III Sep 22.pdf | 3 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Vedant_June 22.pdf | 12 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE March 22 - Vedant_compressed.pdf | 17 May 2022 |
| Certificates of CA (Form 3)File: Vedant _ Mar 22_FORM III_compressed.pdf | 17 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vedant.pdf | 9 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Citywood builders vedant 14 to 18 floor_compressed.pdf | 12 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality certificate Citywood builders vedant 14 to 18 floor_compressed.pdf | 12 Jan 2022 |
| Certificates of CA (Form 3)File: FORM III VEDANT _Dec 21 (1)_compressed.pdf | 10 Jan 2022 |
| Certificates of CA (Form 3)File: CA Form 3_Vedant (14 to 18 flr_Sept 21.pdf | 8 Oct 2021 |
| Certificates of CA (Form 5)File: CA Form 5 (Mar 21) - Vedant (14 to 18 Flr).pdf | 28 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 09 Vedant 14th to 18th floor architect certificate-31122020 Vishal 010221.pdf | 2 Feb 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 112 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Hubtown Vedant- 14th To 18th Floor on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sion-Koliwada780+ in Mumbai City
Filed coordinates, straight-line distance. 98 registered projects within 2 km.
The Earth
AB BUILDERS AND DEVELOPERS SOLUTIONS PRIVA
AJMERA MANHATTAN BUILDING 3A AND 3B
AJMERA REALTY AND INFRA INDIA LTD
AJMERA MANHATTAN BUILDING 4A AND 4B
AJMERA REALTY AND INFRA INDIA LTD
DOSTI EASTERN BAY - PHASE 3
DOSTI REALTY LTD
Siddha Sky Phase 2
M/s Sejal Shakti Realtors LLP
Siddha Sky Phase 4
Sejal Shakti Realtors LLP
See every Mumbai City project, with the district possession charts
Builder: Citywood Builders Private Limited
Citywood Builders Private Limited has 1 registration on MahaRERA, including Hubtown Vedant- 14th To 18th Floor. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that Hubtown Vedant- 14th To 18th Floor shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Hubtown Vedant- 14th To 18th Floor is delayed beyond 28 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Hubtown Vedant- 14th To 18th Floor?
The registered promoter entity is Citywood Builders Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Hubtown Vedant- 14th To 18th Floor?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Hubtown Vedant- 14th To 18th Floor?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Hubtown Vedant- 14th To 18th Floor?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Hubtown Vedant- 14th To 18th Floor?
The professionals named in the filing: Architect: Citigold Managment Pvt Ltd; Architect: SUSAN JOHN; Engineer: Rajivan Paramban; Chartered Accountant: Sanket Shah; Chartered Accountant: Anand A Yadav & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Hubtown Vedant- 14th To 18th Floor?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback