Home / Browse projects / Mumbai Suburban, Maharashtra / Hubtown Solaris
Hubtown Solaris
RG-MH-10674 · RERA P51800001465 · Last updated on MahaRERA portal: 21 May 2024
Source: official MahaRERA filing
Red flags
- 187 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Hubtown Solaris is a Commercial project by Hubtown Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001465 on 28 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 187 complaints are on record with the regulator.
At a glance
Project
- NameHubtown Solaris
- TypeCommercial
- Location
- Off. Teli Gali
- Opp. Sunmist
- on Andheri Juhu Link Road
- Andheri East
- Andheri
- Mumbai Suburban
- 400069
- Pincode400069
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800001465
- ReraGenie IDRG-MH-10674
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Jul 2017
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings2 building records
- Documents filed69 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Hubtown Solaris 10th to 12th Floors | NA | 6 | 0 | 0 | 0 | 0 |
| Hubtown Solaris 13th Floor | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 21 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
Hubtown Solaris 10th to 12th Floors100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Hubtown Solaris 13th Floor100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 21 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed145
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Hubtown Solaris 10th to 12th Floors | 107 | 107 |
| Hubtown Solaris 13th Floor | 38 | 38 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | City gold Management Services (Ar.Maya Vaidya) |
| Engineer | Rajivan Paramban |
| Chartered Accountant | MH Dalal & Association |
| Chartered Accountant | KMVR & Company |
| Partner | Role in project |
|---|---|
| Hubtown Limited | - |
Complaints filed with MahaRERA187
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000192315 | Hubtown Solaris Premises Housing Co-operative Society Limited | Hubtown Limited | 28/01/2020 |
| CC006000000395461 | HUBTOWN LIMITED | M/s. Jayant Brothers | 26/08/2023 |
| CC006000000395476 | HUBTOWN LIMITED | Mr. Yash Bhuta | 01/07/2023 |
| CC006000000395477 | HUBTOWN LIMITED | Lekhi Forgings Private Limited | 01/07/2023 |
| CC006000000395478 | HUBTOWN LIMITED | Mr Ujjval Vinod Saraf | 01/07/2023 |
| CC006000000395479 | HUBTOWN LIMITED | Universal Import Export India Private Limited | 01/07/2023 |
| CC006000000395480 | HUBTOWN LIMITED | Rakesh Khanna | 01/07/2023 |
| CC006000000395482 | HUBTOWN LIMITED | Nalanda Securities Private Limited | 01/07/2023 |
| CC006000000395483 | HUBTOWN LIMITED | Mr Ketan Dedhia | 01/07/2023 |
| CC006000000395484 | HUBTOWN LIMITED | Mr Dilip Rajpal Haria | 01/07/2023 |
| CC006000000395488 | HUBTOWN LIMITED | Merchant Investment Consultancy Private Limited | 01/07/2023 |
| CC006000000395489 | HUBTOWN LIMITED | Mrs Rashmi Deepak Mehta | 16/06/2023 |
| CC006000000395490 | HUBTOWN LIMITED | Mr Rajiv V Gandhi | 15/06/2023 |
| CC006000000395491 | HUBTOWN LIMITED | Mrs Seema Keshri | 15/06/2023 |
| CC006000000395492 | HUBTOWN LIMITED | Sarvoday Industries | 15/06/2023 |
| CC006000000395493 | HUBTOWN LIMITED | JMS Universal Technologies Private Limited | 16/06/2023 |
| CC006000000395494 | HUBTOWN LIMITED | Mr Tushar Sureshchandra Shah | 15/06/2023 |
| CC006000000395495 | HUBTOWN LIMITED | Mr Chandrakant T Ambavi | 15/06/2023 |
| CC006000000395496 | HUBTOWN LIMITED | Mr Haresh Mehta | 15/06/2023 |
| CC006000000395497 | HUBTOWN LIMITED | NMR Enterprises | 16/06/2023 |
| CC006000000395498 | HUBTOWN LIMITED | Mrs Bina Rajesh Ghatalia | 15/06/2023 |
| CC006000000395499 | HUBTOWN LIMITED | Inga Advisors Services Private Limited | 15/06/2023 |
| CC006000000395501 | HUBTOWN LIMITED | Mr Surindersingh Chaturbirsingh Bhalla | 10/06/2023 |
| CC006000000395502 | HUBTOWN LIMITED | Mr Jitendra Majethia | 10/06/2023 |
| CC006000000396149 | HUBTOWN LIMITED | IIFL Realty Limited | 10/06/2023 |
| CC006000000397425 | HUBTOWN LIMITED | Mr Dhiren Kisanlal Doshi | 10/09/2023 |
| CC006000000397427 | HUBTOWN LIMITED | M/s One Buildcorp LLP | 10/09/2023 |
| CC006000000397428 | HUBTOWN LIMITED | Hemlines Textile Exports Private Limited | 10/09/2023 |
| CC006000000395568 | Hubtown Limited | Aditi International | 10/09/2023 |
| CC006000000395569 | Hubtown Limited | BLAU-I Merchandising Private Limited | 28/07/2023 |
| CC006000000395570 | Hubtown Limited | Mr Dharmesh J Solanki | 28/07/2023 |
| CC006000000395571 | Hubtown Limited | Mr Vinod P Jain | 28/07/2023 |
| CC006000000395572 | Hubtown Limited | Mrs Tara Shyam Agarwal | 28/07/2023 |
| CC006000000395573 | Hubtown Limited | Mr Pravin Chiranjilal Oza | 28/07/2023 |
| CC006000000395574 | Hubtown Limited | Mr Mohamed Zaid Memon | 08/09/2023 |
| CC006000000395575 | Hubtown Limited | Mrs Radhika Kedia | 23/08/2023 |
| CC006000000395576 | Hubtown Limited | Aditi International | 10/09/2023 |
| CC006000000395577 | Hubtown Limited | Sai Prasad Media Pvt Ltd | 10/09/2023 |
| CC006000000395578 | Hubtown Limited | Mr Gopalkrishnan Gupta | 23/08/2023 |
| CC006000000395579 | Hubtown Limited | Hemlines Textile Exports Pvt Ltd | 23/08/2023 |
| CC006000000395580 | Hubtown Limited | Mr Glen Gonsalves | 23/08/2023 |
| CC006000000395584 | Hubtown Limited | Mr Sandeep Ashok Goenka | 23/08/2023 |
| CC006000000395585 | Hubtown Limited | Mr Devang Kanubhai Vora | 08/09/2023 |
| CC006000000395586 | Hubtown Limited | Mrs Ranjana Kharag Dudhoria | 23/08/2023 |
| CC006000000395587 | Hubtown Limited | Dhirajlal & Co. | 23/08/2023 |
| CC006000000395589 | Hubtown Limited | Mr Santosh K Mishra | 23/08/2023 |
| CC006000000395590 | Hubtown Limited | Mrs Vanita Hitesh Shah | 23/08/2023 |
| CC006000000395591 | Hubtown Limited | Mr Pratik Kailash Singhi | 23/08/2023 |
| CC006000000395592 | Hubtown Limited | Asppa Developers Pvt Ltd | 23/08/2023 |
| CC006000000395593 | Hubtown Limited | Mr Krishnan Kumar Singhal | 23/08/2023 |
| CC006000000395595 | Hubtown Limited | Mr Viswanathan M P Nair | 23/08/2023 |
| CC006000000395597 | Hubtown Limited | Mr Dhanesh Ram Bhatia | 23/08/2023 |
| CC006000000395598 | Hubtown Limited | Mr Faridally B Patel | 23/08/2023 |
| CC006000000395600 | Hubtown Limited | Ms Nilofer Umedali Kurji | 23/08/2023 |
| CC006000000395601 | Hubtown Limited | Mrs Sunanda Swarup | 10/09/2023 |
| CC006000000395602 | Hubtown Limited | Mr Kiran R Talwar | 10/09/2023 |
| CC006000000395603 | Hubtown Limited | KLJ Plasticizers Limited | 10/09/2023 |
| CC006000000395604 | Hubtown Limited | KLJ Plasticizers Limited | 10/09/2023 |
| CC006000000395605 | Hubtown Limited | Saroj Landmark Realty LLP | 06/07/2023 |
| CC006000000395606 | Hubtown Limited | Mr R Gopalakrishnan | 10/09/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 May 2024
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Letter - 1 Arch solaris full occ 241123.pdf | 21 May 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Solaris Architects Certificate.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800028276 - SOLARIS (2).pdf | 25 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800028276 - SOLARIS (1).pdf | 25 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate -Mar 21.pdf | 25 Jan 2024 |
| Building plan approvalFile: (Arch) Letter - 2.pdf | 8 Sep 2023 |
| Building plan approvalFile: 1 (3)_compressed.pdf | 8 Sep 2023 |
| Building plan approvalFile: 2_compressed.pdf | 8 Sep 2023 |
| Building plan approvalFile: 3.pdf | 8 Sep 2023 |
| Building plan approvalFile: 4_compressed.pdf | 8 Sep 2023 |
| Building Plan Approval (IOD)File: (Arch) Letter - 2.pdf | 8 Sep 2023 |
| Building Plan Approval (IOD)File: 1 (3)_compressed.pdf | 8 Sep 2023 |
| Building Plan Approval (IOD)File: 2_compressed.pdf | 8 Sep 2023 |
| Building Plan Approval (IOD)File: 3.pdf | 8 Sep 2023 |
| Building Plan Approval (IOD)File: 4_compressed.pdf | 8 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Solaris_Dec 22.pdf | 8 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Solaris (upto 13th Floor)_Mar 23.pdf | 8 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800028276 - SOLARIS (1).pdf | 8 Sep 2023 |
| Declaration in FORM BFile: Affidavit cum Declaration.pdf | 19 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality assurance Solaris (1).pdf | 19 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Solaris_Dec 22.pdf | 3 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800028276 - SOLARIS.pdf | 3 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Dec 21_Solaris till 13th floor.pdf | 3 Jun 2023 |
| Certificates of CA (Form 5)File: Solaris Form 5_FY 21-22.pdf | 29 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Solaris F5 -Final (1).pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate March 20.pdf | 31 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Sept 21_Solaris till 13th floor.pdf | 24 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Dec 21_Solaris till 13th floor.pdf | 24 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Solaris (4).pdf | 24 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Solaris (3).pdf | 24 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arch Certificate_Solaris_Dec 22.pdf | 24 Jan 2023 |
| Certificates of CA (Form 3)File: SOLARIS Mar 19 (Upto 13th).pdf | 23 Jan 2023 |
| Certificates of CA (Form 3)File: Solaris 13th floor_CA form 3_Mar 21_compressed.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: GetUserDocumentFileContent.pdf | 23 Jan 2023 |
| Certificates of CA (Form 5)File: solaris 20-21 (2).pdf | 4 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: solaris 20-21 (2).pdf | 4 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM I- arch cert_compressed.pdf | 15 Feb 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE PNCHSHIL PLAZA SOLARIS_compressed.pdf | 15 Feb 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: solaris 13th floor oc office 18,22,23 dt 9-4-2021.pdf | 15 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Solaris(13th Floor)_Mar 21.pdf | 7 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate -Mar 21.pdf | 7 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 08 Solaris 10th part to 12th floor architect certificate-31122020 Vishal 010221.pdf | 2 Feb 2021 |
| Details of Restarting of Construction work post lockdownFile: Solaris.pdf | 31 Oct 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SOLARIS 13th Floor PART OC COVERING LETTER-31-12-2019.pdf | 15 Jan 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC LETTER 6th part 12th.pdf | 6 Dec 2019 |
| Certificates of CA (Form 5)File: Solaris form 5 Signed.pdf | 9 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: SAIWADI SOLARIS FCC 200919.pdf | 23 Sep 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SAIWADI SOLARIS OC 6,10,11 FLR COVERING LETTER 13082019.pdf | 14 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SOLARIS RERA UPDATE-JAN-MAR-2019.pdf | 4 May 2019 |
| Certificates of CA (Form 3)File: Solaris (1).pdf | 5 Jan 2019 |
| Certificates of CA (Form 5)File: Solaris RERA.pdf | 5 Jan 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Solaris Name Reservation.pdf | 26 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SOLARIS 13 FLOOR.pdf | 31 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Solaris.pdf | 26 Mar 2018 |
| OtherFile: Sample Agreement - Solaris.pdf | 28 Nov 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Solaris.pdf | 26 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Solaris 10th part 11 and 12.pdf | 25 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Solaris 13 floor and above.pdf | 25 Jul 2017 |
| Details of encumbrancesFile: Encumbrance certificate solaris 10 11 12 13th.pdf | 24 Jul 2017 |
| Declaration in FORM BFile: Form B 10th to 13th.pdf | 24 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 24 Jul 2017 |
| Proforma of Allotment letterFile: Allotment and Agreement Solaris 10 to 13 flr.pdf | 24 Jul 2017 |
| Layout approvalFile: Layout Solaris.pdf | 17 Jul 2017 |
| Building plan approvalFile: IOD Solaris.pdf | 17 Jul 2017 |
| PAN CardFile: PAN Card Hubtown.pdf | 17 Jul 2017 |
| Copy of the legal title reportFile: Title Report Solaris.pdf | 17 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Solaris.pdf | 17 Jul 2017 |
| Building Plan Approval (IOD)File: IOD Solaris.pdf | 17 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Solaris.pdf | 17 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Hubtown Sunmist B wing | Andheri East | 61 | Completed | Dec 2012 | Late, Sep 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 19 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
Keep Hubtown Solaris on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Opp. Sunmist, on Andheri Juhu Link Road, Andheri East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 384 registered projects within 2 km.
Nityanand Nagar Vibhag IV Cooperative Housing
BAJAJ INTERNATIONAL REALTY PRIVATE LIMITED
FORTUNE ELITE
SAFFRON SPACES LIMITED
NICCO RESIDENCY
NEELKAMAL REALTY & CONSTRUCTION LLP
Parleshwar Aangan
Panom Developers LLP
ATHARV AARADHYAM
Atharv Infra LLP
Krishna Milan Heights
Milan Interbuilt Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Hubtown Limited
Hubtown Limited has 20 registrations on MahaRERA, including Hubtown Greenwoods A wing and Hubtown Greenwoods D Wing. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Hubtown Solaris is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Hubtown Solaris?
The registered promoter entity is Hubtown Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Hubtown Solaris?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Hubtown Solaris?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Hubtown Solaris?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Hubtown Solaris?
The professionals named in the filing: Architect: City gold Management Services (Ar.Maya Vaidya); Engineer: Rajivan Paramban; Chartered Accountant: MH Dalal & Association; Chartered Accountant: KMVR & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Hubtown Solaris?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback