Home / Browse projects / Mumbai Suburban, Maharashtra / Hubtown Premiere Residences - Tower 3
Hubtown Premiere Residences - Tower 3
RG-MH-20616 · RERA P51800002977 · Last updated on MahaRERA portal: 18 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 19 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Hubtown Premiere Residences - Tower 3 is a Residential / Group Housing project by Hubtown Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002977 on 4 Aug 2017. Possession is promised by 31 Jul 2029. 0 of the 26 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameHubtown Premiere Residences - Tower 3
- TypeResidential / Group Housing
- Location
- Jai Prakash Road
- Andheri West
- Andheri
- Mumbai Suburban
- 400047
- Pincode400047
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800002977
- ReraGenie IDRG-MH-20616
Builder
- NameHubtown Limited
- Entity typeCompany
- ChairpersonHemant M Shah
- Managing DirectorVyomesh M Shah
- DirectorsKartik Shantilal Ruparel, Bhakti Jaywant Kothare, Milin Jagdish Ramani, Jignesh Hansraj Gala
- Other registrations19 more →
- Completed11 of 20
- No longer live3 lapsed, de-registered or revoked
- Past their filed date2
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Aug 2017
- Promised completion31 Jul 2029
- Revised completionNone
- Buildings1 building record
- Documents filed115 files
Current status
Figures as on 18 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| The Premiere Residences - Tower 3 | NA | 9 | 0 | 26 | 0 | 26 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
The Premiere Residences - Tower 3: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| The Premiere Residences - Tower 3 | NA | Rs 30.78 cr | Rs 15.00 cr |
| - | NA | Rs 4.17 cr | Rs 1.82 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aakar Architect (Mr. Ameet Pawar) |
| Architect | Citygold Management Services Pvt.ltd |
| Engineer | Rajivan Paramban |
| Chartered Accountant | KMVR AND COMPANY |
| Chartered Accountant | MH Dalal & Association |
| Chartered Accountant | Dhairya Bhuta |
| Chartered Accountant | Sanket Shah |
| Partner | Role in project |
|---|---|
| Hubtown Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2029
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM - I P51800002977 - Premiere Tower-3.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: FORM - II Engineers Certificate Tower 3 - Premiere.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: FORM-III Premiere T3 June26.pdf | 18 Jul 2026 |
| Form 2A (FY 2025-2026)File: FORM-2A_Tower 3.pdf | 17 Jul 2026 |
| Withdrawal Update Form 1File: FORM - I P51800002977 - Premiere Tower-3-1.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: FORM - II Tower-3.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: FORM - III Hubtowm Premiere Residences TOWER-3.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form-1 - Tower -3.pdf | 25 Mar 2026 |
| Withdrawal Update Form 2File: Form- 2-Engineers Certificate - Premiere T 3 - Dec 25.pdf | 25 Mar 2026 |
| Withdrawal Update Form 3File: Form-3_T3.pdf | 25 Mar 2026 |
| Withdrawal Update Form 1File: P51800002977 - Premiere Tower-3 (14th Flr u0026 above).pdf | 19 Nov 2025 |
| Withdrawal Update Form 2File: Engineering_certificate_-_Premiere_-_Tower_3_-_Sep_25[1].pdf | 19 Nov 2025 |
| Withdrawal Update Form 3File: Form III Tower 3.pdf | 19 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form-5 Tower3.pdf | 4 Oct 2025 |
| Form 1File: P51800002977 - Premiere Tower-3 (up to 13th Flr) (1).pdf | 20 Aug 2025 |
| Form 2File: Engg Certificate_Premiere T3_June 25.pdf | 20 Aug 2025 |
| Form 3File: CA Form 3_Tower 3_June 25.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold_Premiere T3_June 25.pdf | 20 Aug 2025 |
| OthersFile: P51800002977 - Premiere Tower-3 (14th Flr & above) (2).pdf | 20 Aug 2025 |
| Certificates of CA (Form 3)File: HUBTOWN PREMIERE RESIDENCES - TOWER 3.pdf | 3 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - Premiere Tower-3 (up to 13th Flr).pdf | 19 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - premiere - Tower 3 - Dec 24.pdf | 11 Feb 2025 |
| Certificates of CA (Form 3)File: PREMIERE TOWER 3 - DEC 2024.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - Premiere Tower-3 (up to 13th Flr).pdf | 15 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - Premiere Tower-3 (14th Flr and above).pdf | 15 Jan 2025 |
| Certificates of CA (Form 3)File: PERMIERE TOWER 3.pdf | 6 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE T3- Premiere Sep 24.pdf | 22 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE T3- Premiere Sep 24.pdf | 22 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2450919_FurtherCC_signed.pdf | 21 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2450919_FurtherCC_signed.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 T-3.pdf | 14 Oct 2024 |
| Certificates of CA (Form 5)File: Form 5 T-3.pdf | 14 Oct 2024 |
| Certificates of CA (Form 5)File: Form 5 T-3.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 T-3.pdf | 14 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Premiere T3_June 24.pdf | 23 Jul 2024 |
| Certificates of CA (Form 3)File: PREMIERE TOWER 3 (1).pdf | 22 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch certificate_Tower 3 (upto 13th floor)_June 24.pdf | 13 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch certificate_Tower 3 (14th and above)_June 24.pdf | 13 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Premiere T3_Mar 24.pdf | 9 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Certificate_Premire T3_FY 23-24.pdf | 9 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (UPTO 13TH).pdf | 3 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (ABOVE 14TH).pdf | 3 May 2024 |
| Certificates of CA (Form 3)File: PREMIERE TOWER 3.pdf | 3 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engeeniring Certificate Tower 3 - Sep 23.pdf | 24 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (UPTO 13TH).pdf | 24 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (ABOVE 14TH).pdf | 24 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (UPTO 13TH).pdf | 24 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (ABOVE 14TH) (1).pdf | 24 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate T3 June 23.pdf | 24 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engeeniring Certificate Tower 3 - Sep 23.pdf | 24 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - T3 - PREMIERE - DEC 23.pdf | 24 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3_T3_Dec 23.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: PREMIERE TOWER 3.pdf | 23 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_T3_FY 22-23.pdf | 4 Nov 2023 |
| Certificates of CA (Form 3)File: PREMIERE TOWER 3.pdf | 10 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T3_upto 13th_Arch Cert_Mar 22_0001.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T3_14th and above_Arch Cert_Mar 22_0001.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Premiere Tower 3 upto 13th foloor_June 22.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Premiere Tower 3 upto 14th foloor_June 22.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977- Premiere Tower-3 (up to 13th floor).pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - Premiere Tower-3 (14th floor and abov.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977- Premiere T3 - upto 13th floor.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 -Premiere T3 - 14th above.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (UPTO 13TH).pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (ABOVE 14TH).pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (UPTO 13TH).pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800002977 - T3 (ABOVE 14TH).pdf | 30 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate T3 Dec 22 premiere.pdf | 30 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE T3 March 23.pdf | 30 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CERTIFICATE HUBTOWN Tower 3.pdf | 30 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Tower 3 Form 2A.pdf | 30 Sep 2023 |
| Certificates of CA (Form 3)File: PREMIERE TOWER 3.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: PREMIERE TOWER 3.pdf | 25 Sep 2023 |
| Certificates of CA (Form 3)File: FORM 3 -(HTL) PREMIERE TOWER 3.pdf | 15 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Tower 3 Form 5.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Hubtown Premiere Residences _ Tower 3 Form 5 2019.pdf | 10 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 Premiere-Tower 3.pdf | 10 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_Premiere_T3_Mar 21.pdf | 10 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineers Certificate - T3_compressed.pdf | 27 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Quality Assurance - T3.pdf | 27 Jan 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Hubtown Sunmist B wing | Andheri East | 61 | Completed | Dec 2012 | Late, Sep 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 19 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Hubtown Premiere Residences - Tower 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Andheri West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 231 registered projects within 2 km.
Cosmopolis Wing B
Jiten Agroland & Farm Private Limited
Hubtown Premiere Residences - Commercial
Hubtown Limited
SATELLITE ARISTIA
Satellite Rockford Ventures LLP
Hubtown Premiere Residences - Tower 2
Hubtown Limited
Imperial Heights Wing C and D
EPITOME RESIDENCY PRIVATE LIMITED
Leo Tower
Dev Land & Housing Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Hubtown Limited
Hubtown Limited has 20 registrations on MahaRERA, including Hubtown Greenwoods A wing and Hubtown Greenwoods D Wing. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Hubtown Premiere Residences - Tower 3 is delayed beyond 31 Jul 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Hubtown Premiere Residences - Tower 3?
The registered promoter entity is Hubtown Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Hubtown Premiere Residences - Tower 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Hubtown Premiere Residences - Tower 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Hubtown Premiere Residences - Tower 3?
The professionals named in the filing: Architect: Aakar Architect (Mr. Ameet Pawar); Architect: Citygold Management Services Pvt.ltd; Engineer: Rajivan Paramban; Chartered Accountant: KMVR AND COMPANY; Chartered Accountant: MH Dalal & Association; Chartered Accountant: Dhairya Bhuta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Hubtown Premiere Residences - Tower 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback