Red flags

  • Possession 3 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
10 of 59Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

Hubtown Premiere Residences - Commercial is a Residential / Group Housing project by Hubtown Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003575 on 5 Aug 2017. Possession was promised by 31 Jul 2026 and is now 3 months past that date. 49 of the 59 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameHubtown Premiere Residences - Commercial
  • TypeResidential / Group Housing
  • Location
    • J.P. Road
    • Four Bungalow
    • Versova
    • Andheri
    • Mumbai Suburban
    • 400047
  • Pincode400047
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003575
  • ReraGenie IDRG-MH-19693

Builder

  • NameHubtown Limited
  • Entity typeCompany
  • ChairpersonHemant M Shah
  • Managing DirectorVyomesh M Shah
  • DirectorsKartik Shantilal Ruparel, Bhakti Jaywant Kothare, Milin Jaywant Ramani, Jignesh Hansraj Gala
  • Other registrations19 more →
  • Completed11 of 20
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

3 months past promisethis monthRegisteredAug 2017PromisedJul 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2017
  • Promised completion31 Jul 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed103 files

Current status

83%49 of 59 units booked
100.0%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Premiere Residences - CommercialNA2005959

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

The Premiere Residences - Commercial: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,312 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Oct 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1771.06
Proposed, not sanctioned1,461 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAHURA CENTRE MAHAKALI CAVES ROAD ANDHERI EAST MUMBAI 400093
Estimated costRs 23.22 cr
Cost incurredRs 23.22 cr
Work done100.0%
BuildingWingEstimatedIncurred
The Premiere Residences - CommercialNARs 21.32 crRs 21.32 cr
-NARs 1.90 crRs 1.90 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAakar Architect (Mr.Ameet Pawar)
EngineerRajivan Paramaban
Chartered AccountantDhairya Bhuta
Chartered AccountantMH Dalal & Association
Chartered AccountantKMVR & Company
PartnerRole in project
Hubtown Limited-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000251617Hubtown LimitedAbdul Majid Aziz & Mrs. Sabeen Aziz25/06/2022
CC006000000292808Hubtown LimitedVinod Kumar Arora24/09/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Dec 2023

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM - I P51800003575 - Premiere ( commercial )-FORM-1.pdf19 Jun 2026
Withdrawal Update Form 1File: FORM - I Q3 P51800003575 - Premiere ( commercial ).pdf19 Jun 2026
Withdrawal Update Form 1File: FORM - I P51800003575 - Premiere ( commercial ).pdf19 Jun 2026
Withdrawal Update Form 2File: FORM - II Q2.pdf19 Jun 2026
Withdrawal Update Form 2File: FORM - II Q3.pdf19 Jun 2026
Withdrawal Update Form 2File: FORM - II Engineers Certificate - Premiere Commercial - March 26.pdf19 Jun 2026
Withdrawal Update Form 3File: Form III - Q2.pdf19 Jun 2026
Withdrawal Update Form 3File: Form III - Q3.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM - III Hubtown Premiere Residences - COMMERCIAL.pdf19 Jun 2026
Form 5 (FY 2024-2025)File: Form-5 Commercial.pdf4 Oct 2025
Form 1File: P51800003575 - Premiere ( commercial ) (1).pdf20 Aug 2025
Form 2File: Engg Certificate_Premiere Commercial_June 25.pdf20 Aug 2025
Form 3File: CA Form 3_Commercial_June 25.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_Premiere Commercial_June 25.pdf20 Aug 2025
Certificates of CA (Form 3)File: HUBTOWN PREMIERE RESIDENCES - COMMERCIAL.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - premiere - Commercial - Dec 24.pdf11 Feb 2025
Certificates of CA (Form 3)File: PREMIERE COMMERCIAL - DEC 2024.pdf7 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Certificate_Premire Comm_FY 23-24.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800003575 - Premiere ( commercial ).pdf15 Jan 2025
Certificates of CA (Form 3)File: PERMIERE COMMERCIAL.pdf6 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE Commercial Premiere Sep 24.pdf22 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE Commercial Premiere Sep 24.pdf22 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2450919_FurtherCC_signed.pdf21 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 2450919_FurtherCC_signed.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Commercial.pdf24 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Premiere Comm_June 24.pdf23 Jul 2024
Certificates of CA (Form 3)File: PREMIERE COMMERCIAL.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch certificate_Commercial_June 24.pdf13 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Premiere Comm_Mar 24.pdf9 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800003575 - PREMIERE - COMM.pdf3 May 2024
Certificates of CA (Form 3)File: PREMIERE COMMERCIAL.pdf3 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800003575 - PREMIERE - COMM.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - COMMERCIAL - PREMIERE - DEC 23.pdf24 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800003575 - PREMIERE - COMM.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800032785 - SEASONS COMM.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Commercial June 23.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engeeniring Certificate Commercial- Sep 23.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3_Premiere Commercial_Dec 23.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Commercial-Form-5.pdf10 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Premier A wing OC issue letter.pdf29 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Commerical OC.pdf29 Dec 2023
Certificates of CA (Form 3)File: PREMIERE COMMERCIAL.pdf23 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800003575 - PREMIERE - COMM.pdf30 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800003575 - PREMIERE - COMM.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Commercial Dec 22 premiere.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE Commercial March 23.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE Commercial March 23.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CERTIFICATE HUBTOWN Commercial.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Premiere Commercial Form 2A.pdf30 Sep 2023
Certificates of CA (Form 3)File: PREMIERE COMMERCIAL.pdf25 Sep 2023
Certificates of CA (Form 3)File: PREMIERE COMMERCIAL.pdf25 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800003575 - Premiere (Commercial).pdf23 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800003575 - Premiere Commercial.pdf23 May 2023
Certificates of CA (Form 3)File: FORM 3 -(HTL) PREMIERE COMMERCIAL.pdf15 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- Commercial_FY 21-22.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Hubtown Commerical Form 5 2019.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 Premiere-Comm.pdf10 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Premiere Comm_Arch Cert_Mar 22_0001.pdf14 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Premiere Commercial_Mar 22_compressed.pdf14 Jul 2022
Certificates of CA (Form 3)File: Premiere_Commercial_Form 3_Mar 22_compressed.pdf14 Jul 2022
OtherFile: shop 12A FF termination ltr (1).pdf16 Feb 2022
OtherFile: shop 12A GF termination ltr (1).pdf16 Feb 2022
OtherFile: shop 7A GF termination ltr.pdf2 Feb 2022
OtherFile: shop 7A FF termination ltr.pdf2 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Quality Assurance - Commercial.pdf27 Jan 2022
Certificates of CA (Form 3)File: Premier Commercial_compressed.pdf27 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_Premiere_Comm_Dec 21_0001.pdf19 Jan 2022
Certificates of CA (Form 3)File: PREMIERE COMMERCIAL.pdf7 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I_Commercial -3092021.pdf19 Nov 2021
Certificates of CA (Form 5)File: Hubtown form-5 commercial FY 2020-21 (1).pdf19 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Hubtown form-5 commercial FY 2020-21 (1).pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2285854_OC_signed (1).pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC_Premiere Comm.pdf12 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC_Premiere Comm.pdf11 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Premiere - Commercial.pdf19 Jun 2021
Certificates of CA (Form 5)File: FORM 5 Premiere-Comm.pdf28 Apr 2021
Certificates of CA (Form 3)File: Form 3 Comm.pdf8 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Premiere - Commercial 010221.pdf2 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Premiere - Commercial.pdf30 Nov 2020
Details of Restarting of Construction work post lockdownFile: Premiere Commercial.pdf31 Oct 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hubtown Sunmist B wingAndheri East61CompletedDec 2012Late, Sep 2014

How this compares with Mumbai Suburban

83%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hubtown Premiere Residences - Commercial on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Four Bungalow, Versova6,700+ in Mumbai Suburban

2 kmHubtown Premiere ResidenCompleted 83Lapsed / revoked 51Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 231 registered projects within 2 km.

Builder: Hubtown Limited

Hubtown Limited has 20 registrations on MahaRERA, including Hubtown Greenwoods A wing and Hubtown Greenwoods D Wing. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Hubtown Premiere Residences - Commercial is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hubtown Premiere Residences - Commercial?

The registered promoter entity is Hubtown Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hubtown Premiere Residences - Commercial?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Hubtown Premiere Residences - Commercial?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Hubtown Premiere Residences - Commercial?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hubtown Premiere Residences - Commercial?

The professionals named in the filing: Architect: Aakar Architect (Mr.Ameet Pawar); Engineer: Rajivan Paramaban; Chartered Accountant: Dhairya Bhuta; Chartered Accountant: MH Dalal & Association; Chartered Accountant: KMVR & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hubtown Premiere Residences - Commercial?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hubtown Premiere Residences - Commercial. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hubtown Premiere Residences - Commercial to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.