Home / Browse projects / Mumbai City, Maharashtra / Hubtown Harmony Retail

Registration lapsed No litigation declared Commercial project

Hubtown Harmony Retail

By Heet Builders Private Limited

RG-MH-48631 · RERA P51900017699 · Last updated on MahaRERA portal: 8 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Hubtown Harmony Retail is a Commercial project by Heet Builders Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900017699 on 6 Sep 2018. Possession was promised by 30 Dec 2023 and is now 34 months past that date.

At a glance

Project

  • NameHubtown Harmony Retail
  • TypeCommercial
  • Location
    • Bhaudaji Marg
    • Matunga East
    • Mumbai City
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900017699
  • ReraGenie IDRG-MH-48631

Builder

  • NameHeet Builders Private Limited
  • Entity typeCompany
  • DirectorsSunil Chandrakant Shah, Sunil Chandrakant Shah, Jayeshkumar Mukesh Jain
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live3 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredSep 2018PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Sep 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hubtown Harmony RetailNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

Hubtown Harmony Retail: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area919 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI606.23
Proposed, not sanctioned606 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAhura Centre

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS.D. Arch
ArchitectNaren Kuwadekar & Associates
EngineerRajivan Paramban
PartnerRole in project
Heet Builders Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Oct 2024

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Harmony - Sep 24 - Retail.pdf8 Nov 2024
Certificates of CA (Form 3)File: Form III_HARMONY - RETAILS.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form III_HARMONY -RETAILS_Sep 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Retail jun 24.pdf6 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Harmony Retail.pdf4 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - Harmony - Retail.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: HARMONY RETAIL.pdf17 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4- Retail Hubtown Harmony.pdf10 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 01-HARMONY FULL OC WING A AND PART OC WING B 12TH-AUG-2024 LETTER.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate - Harmony - Retail _June 24.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate 3.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HEET BUILDERS CERTIFICATE Retail.pdf20 Apr 2024
Certificates of CA (Form 3)File: Form III_Mar 24_HARMONY - RETAILS.pdf20 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf15 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Harmony retail_22-23.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Retail - Harmony - Dec 23.pdf22 Jan 2024
Certificates of CA (Form 3)File: Form III _HARMONY Retail.pdf22 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Retail - Sep 23 (1).pdf26 Dec 2023
Certificates of CA (Form 3)File: Form III_HARMONY- RETAILS_Sep 23.pdf26 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf16 Oct 2023
Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-1.pdf23 Aug 2023
Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-2.pdf23 Aug 2023
Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-3.pdf23 Aug 2023
Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-4.pdf23 Aug 2023
Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-5.pdf23 Aug 2023
Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-6.pdf23 Aug 2023
Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-7.pdf23 Aug 2023
Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-8.pdf23 Aug 2023
Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-1.pdf23 Aug 2023
Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-2.pdf23 Aug 2023
Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-3.pdf23 Aug 2023
Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-4.pdf23 Aug 2023
Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-5.pdf23 Aug 2023
Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-6.pdf23 Aug 2023
Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-7.pdf23 Aug 2023
Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-8.pdf23 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 08-CC revalidation 06-01-2024.pdf23 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: BIT SALE BLDG DRAWING-29-07-2020-3.pdf23 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Harmony Retail - June 23.pdf14 Aug 2023
Certificates of CA (Form 3)File: FORM III HARMONY RETAILS.pdf14 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERTIFICATE - Retail - March 23 (1).pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf12 Jul 2023
Certificates of CA (Form 3)File: Form III_Harmony Retail March 23.pdf12 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 RETAIL_Harmony.pdf21 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Harmony- Phase l_Dec 22.pdf9 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginners Certificate Retail Dec 22 - Harmony.pdf9 Jan 2023
Certificates of CA (Form 3)File: FORM III - HARMONY RETAIL_Dec 22.pdf9 Jan 2023
Certificates of CA (Form 3)File: FORM III - HARMONY RETAILS_Sept 22.pdf4 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate - harmony commercial - june 22_compressed.pdf2 Sep 2022
Certificates of CA (Form 3)File: Harmony Retail CA Form 3_June 22_compressed.pdf30 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE HARMONY RETAIL- SEP 21_compressed.pdf24 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - harmony Retail.pdf24 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Harmony Retail.pdf24 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Harmony Retail_June 22.pdf12 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Gr fl_compressed.pdf15 Jun 2022
Certificates of CA (Form 3)File: HARMONY FORM-III (RETAIL)_compressed.pdf14 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Harmony Retail_Mar 22.pdf15 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2303847_OC_signed (1) (1).pdf17 Jan 2022
Certificates of CA (Form 3)File: Harmony Retails_Form III_Dec 21_compressed.pdf8 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Heet Mar 21 - Harmony Retail.pdf2 Dec 2021
Certificates of CA (Form 3)File: Form_III_HARMONY Retail_March 21_compressed.pdf16 Aug 2021
Certificates of CA (Form 3)File: Harmony Retail _Form III_June 21_compressed.pdf16 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 BIT Harmony architect certificate-Phase I-31122020 Vishal 010221.pdf2 Feb 2021
Certificates of CA (Form 3)File: Heet Builders Form III March 20 Harmony Retail Part1.pdf8 Jan 2021
Certificates of CA (Form 3)File: Heet Builders Form III March 20 Harmony Retail Part2.pdf8 Jan 2021
Certificates of CA (Form 3)File: Heet Builders Form III March 20 Harmony Retail Part3.pdf8 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Harmony Retail Wing Form 5 Mar 20.pdf8 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BIT HARMONY PHASE I GROUND FLOOR 31 MARCH 2020.pdf30 Nov 2020
Details of Restarting of Construction work post lockdownFile: Harmony Retail.pdf31 Oct 2020
Building plan approvalFile: Approval Letter 29072020.pdf16 Sep 2020
Building Plan Approval (IOD)File: Approval Letter 29072020.pdf16 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: FCC 30JUL2020.pdf16 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Hubtown Harmony Retail.pdf7 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HARMONY RETAIL GROUND FLOOR JAN TO MARCH 2019.pdf7 May 2019
Declaration in FORM BFile: Form B Harmony Retail.pdf22 Aug 2018
Certificates of CA (Form 3)File: Harmony Retails.pdf22 Aug 2018
Proforma of Allotment letterFile: Harmony AFS.pdf22 Aug 2018
Building plan approvalFile: IOD harmony.pdf17 Aug 2018

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hubtown Harmony Retail on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Matunga East780+ in Mumbai City

2 kmHubtown Harmony RetailCompleted 82Lapsed / revoked 53Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 212 registered projects within 2 km.

Builder: Heet Builders Private Limited

Heet Builders Private Limited has 4 registrations on MahaRERA, including Heavan C Wing and Hubtown Harmony A Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that Hubtown Harmony Retail shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Hubtown Harmony Retail is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hubtown Harmony Retail?

The registered promoter entity is Heet Builders Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hubtown Harmony Retail?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hubtown Harmony Retail?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hubtown Harmony Retail?

The professionals named in the filing: Architect: S.D. Arch; Architect: Naren Kuwadekar & Associates; Engineer: Rajivan Paramban. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hubtown Harmony Retail?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hubtown Harmony Retail. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hubtown Harmony Retail to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.