Home / Browse projects / Mumbai City, Maharashtra / Hubtown Harmony Retail
Hubtown Harmony Retail
By Heet Builders Private Limited
RG-MH-48631 · RERA P51900017699 · Last updated on MahaRERA portal: 8 Nov 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Hubtown Harmony Retail is a Commercial project by Heet Builders Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900017699 on 6 Sep 2018. Possession was promised by 30 Dec 2023 and is now 34 months past that date.
At a glance
Project
- NameHubtown Harmony Retail
- TypeCommercial
- Location
- Bhaudaji Marg
- Matunga East
- Mumbai City
- 400019
- Pincode400019
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900017699
- ReraGenie IDRG-MH-48631
Builder
- NameHeet Builders Private Limited
- Entity typeCompany
- DirectorsSunil Chandrakant Shah, Sunil Chandrakant Shah, Jayeshkumar Mukesh Jain
- Other registrations3 more →
- Completed1 of 4
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Sep 2018
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed87 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Hubtown Harmony Retail | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
Hubtown Harmony Retail: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed10
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | S.D. Arch |
| Architect | Naren Kuwadekar & Associates |
| Engineer | Rajivan Paramban |
| Partner | Role in project |
|---|---|
| Heet Builders Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Aug 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Aug 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Oct 2024
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Harmony - Sep 24 - Retail.pdf | 8 Nov 2024 |
| Certificates of CA (Form 3)File: Form III_HARMONY - RETAILS.pdf | 6 Nov 2024 |
| Certificates of CA (Form 3)File: Form III_HARMONY -RETAILS_Sep 24.pdf | 6 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Retail jun 24.pdf | 6 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Harmony Retail.pdf | 4 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - Harmony - Retail.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: HARMONY RETAIL.pdf | 17 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4- Retail Hubtown Harmony.pdf | 10 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 01-HARMONY FULL OC WING A AND PART OC WING B 12TH-AUG-2024 LETTER.pdf | 10 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate - Harmony - Retail _June 24.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate 3.pdf | 8 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HEET BUILDERS CERTIFICATE Retail.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3)File: Form III_Mar 24_HARMONY - RETAILS.pdf | 20 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf | 15 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Harmony retail_22-23.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Retail - Harmony - Dec 23.pdf | 22 Jan 2024 |
| Certificates of CA (Form 3)File: Form III _HARMONY Retail.pdf | 22 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Retail - Sep 23 (1).pdf | 26 Dec 2023 |
| Certificates of CA (Form 3)File: Form III_HARMONY- RETAILS_Sep 23.pdf | 26 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf | 16 Oct 2023 |
| Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-1.pdf | 23 Aug 2023 |
| Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-2.pdf | 23 Aug 2023 |
| Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-3.pdf | 23 Aug 2023 |
| Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-4.pdf | 23 Aug 2023 |
| Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-5.pdf | 23 Aug 2023 |
| Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-6.pdf | 23 Aug 2023 |
| Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-7.pdf | 23 Aug 2023 |
| Building plan approvalFile: BIT SALE BLDG DRAWING-29-07-2020-8.pdf | 23 Aug 2023 |
| Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-1.pdf | 23 Aug 2023 |
| Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-2.pdf | 23 Aug 2023 |
| Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-3.pdf | 23 Aug 2023 |
| Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-4.pdf | 23 Aug 2023 |
| Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-5.pdf | 23 Aug 2023 |
| Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-6.pdf | 23 Aug 2023 |
| Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-7.pdf | 23 Aug 2023 |
| Building Plan Approval (IOD)File: BIT SALE BLDG DRAWING-29-07-2020-8.pdf | 23 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 08-CC revalidation 06-01-2024.pdf | 23 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: BIT SALE BLDG DRAWING-29-07-2020-3.pdf | 23 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Harmony Retail - June 23.pdf | 14 Aug 2023 |
| Certificates of CA (Form 3)File: FORM III HARMONY RETAILS.pdf | 14 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERTIFICATE - Retail - March 23 (1).pdf | 19 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf | 12 Jul 2023 |
| Certificates of CA (Form 3)File: Form III_Harmony Retail March 23.pdf | 12 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900017699 - BIT -AB COMM.pdf | 10 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 RETAIL_Harmony.pdf | 21 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Harmony- Phase l_Dec 22.pdf | 9 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginners Certificate Retail Dec 22 - Harmony.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: FORM III - HARMONY RETAIL_Dec 22.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: FORM III - HARMONY RETAILS_Sept 22.pdf | 4 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate - harmony commercial - june 22_compressed.pdf | 2 Sep 2022 |
| Certificates of CA (Form 3)File: Harmony Retail CA Form 3_June 22_compressed.pdf | 30 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE HARMONY RETAIL- SEP 21_compressed.pdf | 24 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - harmony Retail.pdf | 24 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Harmony Retail.pdf | 24 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Harmony Retail_June 22.pdf | 12 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Gr fl_compressed.pdf | 15 Jun 2022 |
| Certificates of CA (Form 3)File: HARMONY FORM-III (RETAIL)_compressed.pdf | 14 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Harmony Retail_Mar 22.pdf | 15 Apr 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2303847_OC_signed (1) (1).pdf | 17 Jan 2022 |
| Certificates of CA (Form 3)File: Harmony Retails_Form III_Dec 21_compressed.pdf | 8 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Heet Mar 21 - Harmony Retail.pdf | 2 Dec 2021 |
| Certificates of CA (Form 3)File: Form_III_HARMONY Retail_March 21_compressed.pdf | 16 Aug 2021 |
| Certificates of CA (Form 3)File: Harmony Retail _Form III_June 21_compressed.pdf | 16 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 BIT Harmony architect certificate-Phase I-31122020 Vishal 010221.pdf | 2 Feb 2021 |
| Certificates of CA (Form 3)File: Heet Builders Form III March 20 Harmony Retail Part1.pdf | 8 Jan 2021 |
| Certificates of CA (Form 3)File: Heet Builders Form III March 20 Harmony Retail Part2.pdf | 8 Jan 2021 |
| Certificates of CA (Form 3)File: Heet Builders Form III March 20 Harmony Retail Part3.pdf | 8 Jan 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Harmony Retail Wing Form 5 Mar 20.pdf | 8 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BIT HARMONY PHASE I GROUND FLOOR 31 MARCH 2020.pdf | 30 Nov 2020 |
| Details of Restarting of Construction work post lockdownFile: Harmony Retail.pdf | 31 Oct 2020 |
| Building plan approvalFile: Approval Letter 29072020.pdf | 16 Sep 2020 |
| Building Plan Approval (IOD)File: Approval Letter 29072020.pdf | 16 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: FCC 30JUL2020.pdf | 16 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Hubtown Harmony Retail.pdf | 7 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: HARMONY RETAIL GROUND FLOOR JAN TO MARCH 2019.pdf | 7 May 2019 |
| Declaration in FORM BFile: Form B Harmony Retail.pdf | 22 Aug 2018 |
| Certificates of CA (Form 3)File: Harmony Retails.pdf | 22 Aug 2018 |
| Proforma of Allotment letterFile: Harmony AFS.pdf | 22 Aug 2018 |
| Building plan approvalFile: IOD harmony.pdf | 17 Aug 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Hubtown Harmony Retail on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Matunga East780+ in Mumbai City
Filed coordinates, straight-line distance. 212 registered projects within 2 km.
CODENAME MATUNGA ORIGINS
J. P. INFRA (MUMBAI) PRIVATE LIMITED
SHANTI HEIGHTS
Vipul Shantilal Nagda HUF
Balkrishna Hills
Oriental Contractors Private Limited
VERVE MANSION
SHANTI SIDDHI INFRA LLP
PRINCECARE AMARAA
PRINCECARE AMARAA LLP
Godrej Five Gardens
Godrej Projects Development Ltd.
See every Mumbai City project, with the district possession charts
Builder: Heet Builders Private Limited
Heet Builders Private Limited has 4 registrations on MahaRERA, including Heavan C Wing and Hubtown Harmony A Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that Hubtown Harmony Retail shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Hubtown Harmony Retail is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Hubtown Harmony Retail?
The registered promoter entity is Heet Builders Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Hubtown Harmony Retail?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Hubtown Harmony Retail?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Hubtown Harmony Retail?
The professionals named in the filing: Architect: S.D. Arch; Architect: Naren Kuwadekar & Associates; Engineer: Rajivan Paramban. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Hubtown Harmony Retail?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback