ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / HS PRIVITUDE

Registered No litigation declared Residential / Group Housing project

HS PRIVITUDE

By H S ASSOCIATES

RG-MH-40966 · RERA P52100047138 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 25.00 crore secured on the land, in favour of MOTILAL OSWAL HOME FINANCE LIMITED

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 22Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 90%
71 of 193Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

HS PRIVITUDE is a Residential / Group Housing project by H S ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100047138 on 10 Oct 2022. Possession is promised by 31 Dec 2026. 122 of the 193 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameHS PRIVITUDE
  • TypeResidential / Group Housing
  • Location
    • PUNAWALE JAMBE ROAD
    • PUNAWALE
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047138
  • ReraGenie IDRG-MH-40966

Builder

  • NameH S ASSOCIATES
  • Entity typePartnership
  • PartnerMEHFUZALI SAYYED
  • Other registrations2 more →

Key dates

this monthRegisteredOct 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed81 files

Current status

63%122 of 193 units booked
42.3%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA252392092
BNA252392092
Commercial BuildingNA11099

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

A36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth75%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth73%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial BuildingNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed628

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots628
Closed/Covered628
BuildingClosed/CoveredTotal
A313313
B315315

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofMOTILAL OSWAL HOME FINANCE LIMITED
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on8 Jun 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI16336.3
Proposed, not sanctioned16,331 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWHITE SQUARE HINJEWADI WAKAD ROAD PUNE MAHARASHTRA 411057
Estimated costRs 47.65 cr
Cost incurredRs 20.14 cr
Work done42.26%
BuildingWingEstimatedIncurred
BNARs 23.73 crRs 10.44 cr
ANARs 22.02 crRs 9.69 cr
-NARs 1.91 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManasvi Architect
EngineerS K Consultants and Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
H S ASSOCIATES-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603045Viola Valerian DsouzaH S ASSOCIATES23/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Plan 1 of 6.pdf28 Apr 2026
Building plan approvalFile: Plan 2 HS privitude.pdf28 Apr 2026
Building plan approvalFile: Plan 3 HS privitude.pdf28 Apr 2026
Building plan approvalFile: Plan 4 HS privitude.pdf28 Apr 2026
Building plan approvalFile: Plan 5 HS privitude.pdf28 Apr 2026
Building plan approvalFile: Plan 6 HS Privitude.pdf28 Apr 2026
Layout approvalFile: Plan 1.pdf16 Apr 2026
Building plan approvalFile: Plan 1.pdf16 Apr 2026
Building plan approvalFile: Plan 2.pdf16 Apr 2026
Building plan approvalFile: Plan 3.pdf16 Apr 2026
Building plan approvalFile: Plan 4.pdf16 Apr 2026
Building plan approvalFile: Plan 5.pdf16 Apr 2026
Building plan approvalFile: Plan 6.pdf16 Apr 2026
Commencement certificateFile: CC.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1 - H S Privitude as on 31-03-2026.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2 - HS Privitude as on Mar 2026.pdf16 Apr 2026
Withdrawal Update Form 3File: Form 3 - H S Privitude as on 31-03-2026.pdf16 Apr 2026
Withdrawal Update Form 1File: FORM-1_HS PRIVITUDE December 25.pdf4 Apr 2026
Withdrawal Update Form 2File: FORM-2_ENGINEER CERTIFICATE_HSPRIVITUDE_ DEC-2025 (1).pdf4 Apr 2026
Withdrawal Update Form 3File: Form 3 - HS Privitude as on Dec 2025_11zon.pdf4 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 of HS Privitude as on FY 24-25.pdf23 Feb 2026
Form 1File: Form 1 - HS Privitude as on June 2025.pdf17 Dec 2025
Form 2File: Form 2 - HS Privitude as on June 2025.pdf17 Dec 2025
Form 3File: Form 3 - HS Privitude as on June 2025.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - HS Privitude as on June 2025.pdf17 Dec 2025
Form 1File: Form 1 - HS Privitude as on Sep 2025.pdf17 Dec 2025
Form 2File: Form 2 - HS Privitude as on Sep 2025.pdf17 Dec 2025
Form 3File: Form 3 - HS Privitude as on Sep 2025.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - HS Privitude as on Sep 2025.pdf17 Dec 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of HS Privitude as on Fy 23-24.pdf26 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - H S Privitude as on June 2024_compressed.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - H S Privitude as on Sep 2024_compressed.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - H S Privitude as on Dec 2024_compressed.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H S Privitude as on June 2024.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H S Privitude as on Sep 2024.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H S Privitude as on Dec 2024.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - HS Privitude as on June 2024.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - HS Privitude as on September 2024.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - HS Privitude as on December 2024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H S Privitude as on 31st March 2024.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - H S Privitude as on 31st March 2024.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 22.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 23.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 23.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 23.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 2023.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H S Privitude as on 31st Dec 22.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H S Privitude as on 31st March 2023.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H S Privitude as on 30th June 2023.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H S Privitude as on 30th Sept 23.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - H S Privitude as on 31st Dec 23.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-1.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: CIRCULER 29.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - H S Privitude as on 31st Dec 22.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - H S Privitude as on 31st March 2023.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - H S Privitude as on 30th June 2023.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - H S Privitude as on 30th Sept 2023.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - H S Privitude as on 31st Dec 2023.pdf19 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-HS Privitude for FY 2022-23.pdf19 Apr 2024
Other - LegalFile: DRAFT AGREEMENT_HS PRIVITUDE_27092022.pdf29 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf28 Sep 2022
Building plan approvalFile: Plan - 23.pdf24 Sep 2022
Building plan approvalFile: Plan - 33.pdf24 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan - 23.pdf24 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan - 33.pdf24 Sep 2022
Declaration in FORM BFile: ilovepdf_merged (3).pdf19 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form Merged -HS Privitude.pdf19 Sep 2022
Layout approvalFile: Layout.pdf11 Sep 2022
Building plan approvalFile: Layout.pdf11 Sep 2022
Copy of the legal title reportFile: TITLE FLOW.pdf11 Sep 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf11 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Layout.pdf11 Sep 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNET.pdf11 Sep 2022
Proforma of Allotment letterFile: Allotment Letter.pdf11 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank account.pdf29 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation report.pdf29 Aug 2022
PAN CardFile: h s associate pan.pdf27 Aug 2022
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CERTIFICATE PUNAWALE.pdf27 Aug 2022
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE CERTIFICATE PUNAWALE.pdf27 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: commencement.pdf27 Aug 2022

How this compares with Pune

63%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HS PRIVITUDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNAWALE13,700+ in Pune

2 kmHS PRIVITUDECompleted 163Lapsed / revoked 119Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: H S ASSOCIATES

H S ASSOCIATES has 3 registrations on MahaRERA, including LAGOM and LAGOM HOMES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if HS PRIVITUDE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HS PRIVITUDE?

The registered promoter entity is H S ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HS PRIVITUDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HS PRIVITUDE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for HS PRIVITUDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HS PRIVITUDE?

The professionals named in the filing: Architect: Manasvi Architect; Engineer: S K Consultants and Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HS PRIVITUDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HS PRIVITUDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HS PRIVITUDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.