Home / Browse projects / Mumbai Suburban, Maharashtra / HS Heritage
HS Heritage
RG-MH-30994 · RERA P51800079328 · Last updated on MahaRERA portal: 9 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HS Heritage is a Residential / Group Housing project by H.S.Property Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079328 on 28 Feb 2025. Possession is promised by 31 Mar 2029.
At a glance
Project
- NameHS Heritage
- TypeResidential / Group Housing
- Location
- Hutatma Chaphekar Bandhu Marg
- Mulund East
- Mulund
- Kurla
- Mumbai Suburban
- 400081
- Pincode400081
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800079328
- ReraGenie IDRG-MH-30994
Builder
- NameH.S.Property Developers
- Entity typePartnership
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Feb 2025
- Promised completion31 Mar 2029
- Revised completionNone
- Buildings2 building records
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 9 | 0 | 0 | 0 | 0 |
| B Wing | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
A Wing0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B Wing0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed217
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A Wing | 100 | 9 | 109 |
| B Wing | 100 | 8 | 108 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Neeta Apartment Building No 1 Co Op Hsg Soc Ltd | Mulund | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R P Asundaria |
| Engineer | Associated Structural Engineering LLP |
| Chartered Accountant | N B Sayed & Associates |
| Chartered Accountant | Pranav Bhaskaran & Associates |
| Partner | Role in project |
|---|---|
| H.S.Property Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2029
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: HS Heritage Form 5- FY 2024-25.pdf | 9 Jun 2026 |
| Form 1File: Form 1 - HS Heritage as on March 2025.pdf | 23 May 2026 |
| Form 2File: Form 2 - HS Heritage as on March 2025.pdf | 23 May 2026 |
| Form 3File: Form 3 - HS Heritage as on March 2025.pdf | 23 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - HS Heritage As on mar 2025.pdf | 23 May 2026 |
| Form 1File: Form 1 - HS Heritage as on June 2025.pdf | 15 May 2026 |
| Form 2File: Form 2 - HS Heritage as on Dec 2025.pdf | 15 May 2026 |
| Form 3File: Final Form 3 - HS Heritage as on 30-06-2025.pdf | 15 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - HS Heritage as on june 2025.pdf | 15 May 2026 |
| Form 1File: Form 1 - HS Heritage as on Sep 2025.pdf | 15 May 2026 |
| Form 2File: Form 2 - HS Heritage as on Dec 2025.pdf | 15 May 2026 |
| Form 3File: Final Form 3 - HS Heritage as on 30-09-2025.pdf | 15 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - HS Heritage as on 30-09-2025.pdf | 15 May 2026 |
| Form 1File: Form 1 - HS Heritage as on Dec 2025.pdf | 15 May 2026 |
| Form 2File: Form 2 - HS Heritage as on Dec 2025.pdf | 15 May 2026 |
| Form 3File: Final Form 3 - HS Heritage as on 31-12-2025.pdf | 15 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - HS Heritage as on Dec 2025.pdf | 15 May 2026 |
| Form 1File: Form 1 - HS Heritage as on March 2026.pdf | 15 May 2026 |
| Form 2File: Form 2 - HS Heritage as on March 2026.pdf | 15 May 2026 |
| Form 3File: Form 3 - HS Heritage as on March 2026.pdf | 15 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - HS Heritage as on March 2026.pdf | 15 May 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - HS Heritage as on March 2025.pdf | 8 May 2025 |
| Other - FinanceFile: Declaration HS Heritage (1).pdf | 15 Feb 2025 |
| Copy of the legal title reportFile: Neeta Title Cert ( Adv Lalwani ) (1)_organized.pdf | 11 Feb 2025 |
| Proforma of Allotment letterFile: allotment letter hs heritage_compressed.pdf | 11 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form 3 - HS Heritage (1).pdf | 11 Feb 2025 |
| Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (58).pdf | 11 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: 002_11zon.pdf | 11 Feb 2025 |
| Proforma of Agreement for saleFile: HS Heritage FLS Agreement 21-2-25 (2) (3).pdf | 11 Feb 2025 |
| Layout approvalFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-1.pdf | 7 Feb 2025 |
| Building plan approvalFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-1.pdf | 7 Feb 2025 |
| Building plan approvalFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-2.pdf | 7 Feb 2025 |
| Building plan approvalFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-3-4.pdf | 7 Feb 2025 |
| Building plan approvalFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-5-6.pdf | 7 Feb 2025 |
| Building plan approvalFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-7-8.pdf | 7 Feb 2025 |
| PAN CardFile: H S Property Developers PAN Card.pdf | 7 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Emcumbrance - finance.pdf | 7 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Emcumbrace - legal.pdf | 7 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-1.pdf | 7 Feb 2025 |
| Declaration in FORM BFile: Form - B - Developer.pdf | 7 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Neeta First CC 29-01-2025.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-1.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-2.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-3-4.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-5-6.pdf | 7 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: F__SHAHID SHIRGAONKAR_NEETA_IOD PLAN_IOD PLAN 12-12-2024 DEFFI Model (1)-7-8.pdf | 7 Feb 2025 |
| Other - LegalFile: 1 Other - Legal (5)_rotated.pdf | 7 Feb 2025 |
| Declaration about Commencement CertificateFile: Form - D.pdf | 7 Feb 2025 |
| CERSAI detailsFile: Cersai Declaration.pdf | 7 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A) (8).pdf | 7 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Emcumbrance - finance.pdf | 7 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Emcumbrace - legal.pdf | 7 Feb 2025 |
| Other - TechnicalFile: 1 Other - Technical (25).pdf | 7 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (90).pdf | 7 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: HSPD Bank Letter for RERA Opening account.pdf | 7 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: end use hs herrrr.pdf | 7 Feb 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HS Heritage on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mulund East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 328 registered projects within 2 km.
Ekvira and Saishakti
Magnaacasa Infrastructures and Realtors Pr
SENROOFS PHASE - III
PIONEER HOUSING
THE ALTEZZA
M/s. VIPL Varasiddhi Infra Project LLP
SUPREMO PHASE I SALVIA D WING
K V BUILDHOME LLP
SUPREMO PHASE II, WING C known as SAKURA
K V BUILDHOME LLP
Aveza Phase 2
Tata Housing Development Company Limited
See every Mumbai Suburban project, with the district possession charts
Builder: H.S.Property Developers
H.S.Property Developers has 1 registration on MahaRERA, including HS Heritage. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if HS Heritage is delayed beyond 31 Mar 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HS Heritage?
The registered promoter entity is H.S.Property Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HS Heritage?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HS Heritage?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HS Heritage?
The professionals named in the filing: Architect: R P Asundaria; Engineer: Associated Structural Engineering LLP; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HS Heritage?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback