Home / Browse projects / Aurangabad, Maharashtra / HRIM SKY CITY ELITE

Registered No litigation declared Residential / Group Housing project

HRIM SKY CITY ELITE

By NARAYANII BUILDCREATION PRIVATE LIMITED

RG-MH-94028 · RERA P51500054900 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
15 of 55Construction stages doneacross 5 buildings; furthest along: Stilt Floor, 20%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

HRIM SKY CITY ELITE is a Residential / Group Housing project by NARAYANII BUILDCREATION PRIVATE LIMITED in Aurangabad, Maharashtra, registered with MahaRERA as P51500054900 on 15 Feb 2024. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameHRIM SKY CITY ELITE
  • TypeResidential / Group Housing
  • Location
    • BEED BYPASS
    • OPPOSITE MIT COLLEGE
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431010
  • Pincode431010
  • RERA no.P51500054900
  • ReraGenie IDRG-MH-94028

Builder

  • NameNARAYANII BUILDCREATION PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsASHOK JAINARAYAN BAHETI, ASHWIN JAYANARAYAN BAHETI

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Row House 1 to 5NA20000
Row House 6 To 17NA20000
Row House 18 to 31NA20000
Row House 32 to 44NA20000
Row House 54 to 60NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Stilt Floor, at 20%.

Row House 1 to 529%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor20%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House 6 To 1729%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor20%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House 18 to 3129%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor20%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House 32 to 4429%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor20%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Row House 54 to 6029%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor20%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed102

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots102
Closed/Covered51
Open Space51
BuildingClosed/CoveredOpen SpaceTotal
Row House 1 to 55510
Row House 6 To 17121224
Row House 18 to 31141428
Row House 32 to 44131326
Row House 54 to 607714

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,849 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
UDYOJAK DEVELOPERSAurangabad (M Corp.)Aurangabad
BABA SALUBA BHANDAurangabad (M Corp.)Aurangabad
ASHOKKUMAR JAINARAYAN BAHETIAurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI10878.22
Proposed, not sanctioned5,180 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBABURAJ BUILDING, KIRANA CHAWDI, SHAHAGUNJ AURANGABAD

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch Pramod Narale
EngineerJ V Structural Engineer
Chartered AccountantD M Samdani and Company
Chartered AccountantS A Samdani & Co.
PartnerRole in project
NARAYANII BUILDCREATION PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Mar 26.pdf26 May 2026
Form 2File: Form-2 Mar 26.pdf26 May 2026
Form 3File: Form-3 Mar 26.pdf26 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Mar 26.pdf26 May 2026
Form 5 (FY 2023-2024)File: 23-24 Form 5.pdf12 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf12 Feb 2026
Form 1File: Hrim Sky Dec 2025 Form 1.pdf11 Feb 2026
Form 2File: Hrim Sky Dec 2025 Form 2.pdf11 Feb 2026
Form 3File: Hrim Sky Dec 2025 Form 3 declaration.pdf11 Feb 2026
Disclosure of Sold and Booked InventoryFile: Hrim Sky Dec 2025 sold unsold.pdf11 Feb 2026
Form 1File: 1 Form-1 Sep 25.pdf29 Dec 2025
Form 2File: 2 Form-2 Sep 25.pdf29 Dec 2025
Form 3File: 3 Form-3 Sep 25.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold Sep 25.pdf29 Dec 2025
Form 1File: Form-1 Dec 23.pdf20 Dec 2025
Form 2File: Form-2 Dec 23.pdf20 Dec 2025
Form 3File: Form-3Declaration Dec 23.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Dec 23.pdf20 Dec 2025
Form 1File: Form-1 June 24.pdf20 Dec 2025
Form 2File: Form-2 June 24.pdf20 Dec 2025
Form 3File: Form-3Declaration June 24.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold June 24.pdf20 Dec 2025
Form 1File: Form-1 Sep 24.pdf20 Dec 2025
Form 2File: Form-2 Sep 24.pdf20 Dec 2025
Form 3File: Form-3Declaration Sep 24.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Sep 24.pdf20 Dec 2025
Form 1File: Form-1 Dec 24.pdf20 Dec 2025
Form 2File: Form-2 Dec 24.pdf20 Dec 2025
Form 3File: Form-3Declaration Dec 24.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Dec 24.pdf20 Dec 2025
Form 1File: Form-1 March 25.pdf20 Dec 2025
Form 2File: Form-2 March 25.pdf20 Dec 2025
Form 3File: Form-3Declaration March 25.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold March 25.pdf20 Dec 2025
Form 1File: Form-1 June 25.pdf20 Dec 2025
Form 2File: Form-2 June 25.pdf20 Dec 2025
Form 3File: Form-3Declaration June 25.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold June 25.pdf20 Dec 2025
Building plan approvalFile: 7 of 8_compressed.pdf3 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 of 8_compressed.pdf3 Feb 2024
Other - TechnicalFile: Narayani Plot Declaration.pdf3 Feb 2024
Other - TechnicalFile: CC Verification Mail.pdf29 Jan 2024
Building plan approvalFile: 8 of 8_compressed.pdf16 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 8 of 8_compressed.pdf16 Nov 2023
Declaration in FORM BFile: Form B ( Devlopers ).pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NATAYANI - Form 3.pdf16 Nov 2023
Other - TechnicalFile: APPENDIX F (1)_compressed.pdf16 Nov 2023
Copy of the legal title reportFile: Narayani - Search Report.pdf10 Nov 2023
Declaration about Commencement CertificateFile: Format D.pdf10 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep-23.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep-23.pdf10 Nov 2023
Layout approvalFile: layout_compressed.pdf3 Nov 2023
Building plan approvalFile: organized layout_compressed.pdf3 Nov 2023
PAN CardFile: Narayani Co PAN.pdf3 Nov 2023
Details of encumbrances concerned to FinanceFile: No Eng Fin.pdf3 Nov 2023
Details of encumbrances concerned to FinanceFile: No Eng Legal.pdf3 Nov 2023
Details of encumbrances concerned to LegalFile: No Eng Fin.pdf3 Nov 2023
Details of encumbrances concerned to LegalFile: No Eng Legal.pdf3 Nov 2023
Copy of Layout Approval (in case of layout)File: layout_compressed.pdf3 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: organized layout_compressed.pdf3 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Nov 2023
CERSAI detailsFile: CERSAI Declaration.pdf3 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A ( Ashwin Baheti ).pdf3 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A ( Ashokkumar Baheti ).pdf3 Nov 2023
Proforma of Allotment letterFile: Modal From Of Allotment Letter.pdf3 Nov 2023
Proforma of Agreement for saleFile: ATS Draft RERA.pdf3 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf3 Nov 2023
Deviation Report with respect to Allotment letterFile: Allotment Letter.pdf3 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Agreement To Sale.pdf3 Nov 2023

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep HRIM SKY CITY ELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPPOSITE MIT COLLEGE1,400+ in Aurangabad

Builder: NARAYANII BUILDCREATION PRIVATE LIMITED

NARAYANII BUILDCREATION PRIVATE LIMITED has 1 registration on MahaRERA, including HRIM SKY CITY ELITE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if HRIM SKY CITY ELITE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HRIM SKY CITY ELITE?

The registered promoter entity is NARAYANII BUILDCREATION PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HRIM SKY CITY ELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HRIM SKY CITY ELITE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HRIM SKY CITY ELITE?

The professionals named in the filing: Architect: Arch Pramod Narale; Engineer: J V Structural Engineer; Chartered Accountant: D M Samdani and Company; Chartered Accountant: S A Samdani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HRIM SKY CITY ELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HRIM SKY CITY ELITE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HRIM SKY CITY ELITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.