Home / Browse projects / Sindhudurg, Maharashtra / Horizon Grande Wing K

Registered No litigation declared Residential / Group Housing project

Horizon Grande Wing K

By Metric Homes Private Limited

RG-MH-97748 · RERA P52900048510 · Last updated on MahaRERA portal: 19 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
38 of 49Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 161 documents Report an error

Horizon Grande Wing K is a Residential / Group Housing project by Metric Homes Private Limited in Sindhudurg, Maharashtra, registered with MahaRERA as P52900048510 on 3 Jan 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 11 of the 49 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameHorizon Grande Wing K
  • TypeResidential / Group Housing
  • Location
    • Near Post Office
    • Waradkarwadi
    • Wayari
    • Malwan
    • Sindhudurg
    • 416606
  • Pincode416606
  • RERA no.P52900048510
  • ReraGenie IDRG-MH-97748

Builder

  • NameMetric Homes Private Limited
  • Entity typeCompany
  • DirectorsSiddhesh Pramod Hendre, Reshma Siddhesh Hendre
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed161 files

Current status

22%11 of 49 units booked
90.4%Work done, per cost certificate

Figures as on 19 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Horizon Grande Wing KNA6649049

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Horizon Grande Wing K: 99% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 19 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered29

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area434 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Dec 2025
LandownerVillageDistrict
Mr Siddhesh Pramod HendreMumbai CityMumbai City
Mrs Reshma Siddhesh HendreMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityTown planning office Oras Sindhudurg
Permissible FSI867.72
Proposed, not sanctioned868 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCentral Mall Mahavir Nagar Kandivali west Mumbai 400067
Estimated costRs 3.52 cr
Cost incurredRs 3.18 cr
Work done90.37%
BuildingWingEstimatedIncurred
Horizon Grande Wing KNARs 3.22 crRs 2.97 cr
-NARs 30.00 lakhRs 21.50 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAlternate Angle Architects Pvt Ltd
ArchitectBhavesh Sutar
EngineerEr Rajendra Suresh Vankudre
EngineerNarayanmurthi Swami Swami
Chartered AccountantCA Deepen M Kapadia
Chartered AccountantM K Mulay
PartnerRole in project
Metric Homes Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05122518554Dec 2025 → Dec 2026

Reason as filed by the promoterRespected team, We, the promoters of Metric Homes Malvan Project (MAHARERA Registration No. P52900048510), humbly submit this detailed note to explain the reasons for the delay in completion of the project and to provide a transparent update on the current status of construction. We wish to assure the Authority that the delay was not due to negligence or lack of intent, but rather due to extraordinary climatic conditions in the Konkan region, coupled with unavoidable logistical challenges. • Konkan region has witnessed significant climatic shifts in recent years, with monsoons becoming more un

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600042Bhakti AchrekarMetric Homes Private Limited10/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed161

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: OC K wing.pdf19 Jul 2026
Withdrawal Update Form 1File: OC K wing.pdf19 Jul 2026
Withdrawal Update Form 1File: OC K wing.pdf19 Jul 2026
Withdrawal Update Form 2File: OC K wing.pdf19 Jul 2026
Withdrawal Update Form 2File: OC K wing.pdf19 Jul 2026
Withdrawal Update Form 2File: OC K wing.pdf19 Jul 2026
Withdrawal Update Form 3File: OC K wing.pdf19 Jul 2026
Withdrawal Update Form 3File: OC K wing.pdf19 Jul 2026
Withdrawal Update Form 3File: OC K wing.pdf19 Jul 2026
Building plan approval or NA orderFile: NA order 2022.pdf18 Apr 2026
Withdrawal Update Form 1File: Arch Cert JFM 2026.pdf18 Apr 2026
Withdrawal Update Form 2File: Engineer OND 2025.pdf18 Apr 2026
Withdrawal Update Form 3File: CA JFM 2026.pdf18 Apr 2026
Form 2A (FY 2026-2027)File: Eng 2026 below 5 MB.pdf18 Apr 2026
Form 5 (FY 2025-2026)File: CA JFM 2026.pdf18 Apr 2026
Building plan approvalFile: Local authority approval.pdf29 Jan 2026
Building plan approvalFile: Building approval diagram 1.pdf29 Jan 2026
Building plan approvalFile: Town planning approval for 7 floors.pdf29 Jan 2026
Withdrawal Update Form 1File: Arch Cert OND 2025.pdf29 Jan 2026
Withdrawal Update Form 2File: Engineer OND 2025.pdf29 Jan 2026
Withdrawal Update Form 3File: CA Cert Oct 25.pdf29 Jan 2026
Withdrawal Update Form 1File: Arch Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 1File: Arch Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 1File: Arch Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 1File: Arch Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 2File: Quality Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 2File: Quality Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 2File: Quality Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 2File: Quality Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 3File: CA Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 3File: CA Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 3File: CA Cert Oct 25.pdf5 Dec 2025
Withdrawal Update Form 3File: CA Cert Oct 25.pdf5 Dec 2025
Form 2A (FY 2024-2025)File: Quality Cert Oct 25.pdf5 Dec 2025
Form 2A (FY 2022-2023)File: Engineer Cert K wing JAS 2024.pdf5 Dec 2025
Form 2A (FY 2023-2024)File: Engineer Cert K wing JAS 2024.pdf5 Dec 2025
Form 2A (FY 2025-2026)File: Quality Cert Oct 25.pdf5 Dec 2025
Form 5 (FY 2022-2023)File: CA Certificate K wing JAS 2024 revised.pdf5 Dec 2025
Form 5 (FY 2023-2024)File: CA Certificate K wing JAS 2024 revised.pdf5 Dec 2025
Form 5 (FY 2024-2025)File: CA Certificate K wing JAS 2024 revised.pdf5 Dec 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert AMJ 2025 July 2025.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert AMJ 2025.pdf11 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert cum declaration AMJ 2025.pdf11 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Wing K July 2025.pdf11 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 20250417181744.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert JFM 2025 April.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert JFM 2025 April.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng cert JFM 2025 April.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold JFM 2025 April.pdf17 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: CA Cert JFM 2025 April.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert JFM 2025 PDF.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert JFM 2025.pdf12 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert JFM 2025.pdf12 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold JFM 2025 below 3 MB.pdf12 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch k wing JAS 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate K wing JAS 2024 revised.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert K wing JAS 2024.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Report CA 2023 2024.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold unsold K wing JAS 2024.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch K Wing.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Wing K July.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Wing K Inventory.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA K Wing.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch wing K.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA wing k.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT APR 24 K WING.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT K APR 24.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENG QUALITY WING K.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2510.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: WING K SOLD UNSOLD APR 2024.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH WING K CERT.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG WING K.pdf9 Jan 2024
Disclosure of sold/ booked inventoryFile: 3 Disclosure of sold_ booked inventory (2) (2).pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT WING K.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAN WING K ARCH CERT.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING K AMJ 2023_compressed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAS ARCH CERT 2023 WING K.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing K Engineer Cert 10th April 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing 02 Engineer Cert 10th July 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JAS ENG CERT 2023 WING K.pdf20 Oct 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationStatusPromisedDelivered
Horizon Grande Wing 02p52900048513Survey No.29 Hissa No.5/1-5/29,5/31,5/32, Waradkarwadi, Near post Office wayari, Wayari, Malwan, Sindhudurg, 416606, MAHARASHTRACompletedDec 2025Oct 2024
Horizon Grande Wing 01p52900048514Survey No.29 Hissa No.5/1-5/29,5/31,5/32, Waradkarwadi, Near Post Office Wayari, Wayari, Malwan, Sindhudurg, 416606, MAHARASHTRACompletedDec 2024Oct 2024

How this compares with Sindhudurg

22%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 12 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Horizon Grande Wing K on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Waradkarwadi530+ in Sindhudurg

Builder: Metric Homes Private Limited

Metric Homes Private Limited has 3 registrations on MahaRERA, including Horizon Grande Wing K and Horizon Grande Wing 02. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if Horizon Grande Wing K is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Horizon Grande Wing K?

The registered promoter entity is Metric Homes Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Horizon Grande Wing K?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Horizon Grande Wing K?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Horizon Grande Wing K?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Horizon Grande Wing K?

The professionals named in the filing: Architect: Alternate Angle Architects Pvt Ltd; Architect: Bhavesh Sutar; Engineer: Er Rajendra Suresh Vankudre; Engineer: Narayanmurthi Swami Swami; Chartered Accountant: CA Deepen M Kapadia; Chartered Accountant: M K Mulay. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Horizon Grande Wing K?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Horizon Grande Wing K. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Horizon Grande Wing K to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.