ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / Horizon Grande Wing 01

Registration lapsed No litigation declared Residential / Group Housing project

Horizon Grande Wing 01

By Metric Homes Private Limited

RG-MH-88334 · RERA P52900048514 · Last updated on MahaRERA portal: 12 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
10 of 11Construction stages donefurthest along: Slabs of Super Structure, 98%
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

Horizon Grande Wing 01 is a Residential / Group Housing project by Metric Homes Private Limited in Sindhudurg, Maharashtra, registered with MahaRERA as P52900048514 on 3 Jan 2023. Possession was promised by 31 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameHorizon Grande Wing 01
  • TypeResidential / Group Housing
  • Location
    • Waradkarwadi
    • Near Post Office Wayari
    • Wayari
    • Malwan
    • Sindhudurg
    • 416606
  • Pincode416606
  • RERA no.P52900048514
  • ReraGenie IDRG-MH-88334

Builder

  • NameMetric Homes Private Limited
  • Entity typeCompany
  • DirectorsSiddhesh Pramod Hendre, Reshma Siddhesh Hendre
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

22 months past promisethis monthRegisteredJan 2023PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed112 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Horizon Grande Wing 01NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 98%.

Horizon Grande Wing 01: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered25
Open Space25

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area259 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Reshma Siddhesh HendreMumbai CityMumbai City
Siddhesh Promod HendreMumbai CityMumbai City

Approvals and building plan

Permissible FSI1293.65
Proposed, not sanctioned1,294 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKolhapur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAlternate Angle Architects Pvt Ltd
EngineerEr Rajendra Suresh Vankudre
Chartered AccountantCA Deepen M Kapadia
PartnerRole in project
Metric Homes Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Oct 2024

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING 1 FULL Complection certificate Arch Cert.pdf12 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WING 1 FULL Complection certificate Arch Cert.pdf12 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WING 1 FULL Complection certificate Arch Cert.pdf12 Jan 2025
Disclosure of sold/ booked inventoryFile: WING 1 FULL Complection certificate Arch Cert.pdf12 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Wing 01 completion.pdf18 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Arch Cert Wing 01 completion.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arch Cert Wing 01 completion.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arch Cert Wing 01 completion.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arch Cert Wing 01 completion.pdf18 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Arch Cert Wing 01 completion.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Arch Cert Wing 01 completion.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Arch Cert Wing 01 completion.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OC wing 01.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OC wing 01.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for17 Jul 2024
Disclosure of sold/ booked inventoryFile: OC wing 01.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: OC wing 01.pdf17 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC wing 01.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: 13 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH WING 01 APR 2024.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing 1 Eng Apr 24.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENG QUALITY WING 01.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: asda.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: WING 01 SOLD UNSOLD APR 24.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT WING 01 (1).pdf14 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT WING 01 (1).pdf14 Jan 2024
Disclosure of sold/ booked inventoryFile: WING 01 SOLD UNSOLD (1).pdf14 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT WING 01 (1).pdf14 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC WING 01.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAN WING 01 ARCH CERT.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAS ARCH 2023 WING 01.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING 01 ARCH AMJ 2023_11zon (1).pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing 01 Engineer Cert 10th April 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing 01 Engineer Cert 10th July 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JAS ENG 2023 WING 01.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JAS CA 2023 WING 01 ADD DATE N QTR.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Wing 01.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Wing 01.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Wing 01.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Wing 01.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Wing 01.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Wing 01.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT WING 01 JFM 2023.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing 01 Engineer Cert 10th April 2023 (1).pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Wing 01 Engineer Cert 10th July 2023.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Wing 01 Quality Assuance.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Wing 01 Quality Assuance.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: wing 01 self declaration 10th April 23.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: wing 01 self declaration 10th July 23 (1).pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC WING 01.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert wing 01 PDF.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance wing 01 PDF.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Wing 01 sold N unsold.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wing 01 self declaration.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate 01.pdf22 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate 01.pdf22 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate - Wing 01.pdf22 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate - Wing 01.pdf22 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Wing 01.pdf24 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold - Wing 01.pdf24 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 wing 01-Malvan Project.pdf21 Jun 2023
Disclosure of sold/ booked inventoryFile: Wing 1 Sold unsold Malvan.pdf6 Jun 2023
Declaration in FORM BFile: Form B Promoter notary_compressed.pdf2 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_11zon.pdf2 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginer Certificate.pdf2 Dec 2022
CERSAI detailsFile: cersai report.pdf2 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Final_11zon.pdf2 Dec 2022
Proforma of Allotment letterFile: Allottment Letter - New.pdf2 Dec 2022
Proforma of Agreement for saleFile: Building Agreement to Sell as per RERA Act.pdf2 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf2 Dec 2022
Deviation Report with respect to Allotment letterFile: No Deviation Report - Allotment Letter.pdf2 Dec 2022
Deviation Report with respect to model copy of AgreementFile: No Deviation Report - Agreement.pdf2 Dec 2022
Layout approvalFile: Layout.pdf1 Dec 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationStatusPromisedDelivered
Horizon Grande Wing 02p52900048513Survey No.29 Hissa No.5/1-5/29,5/31,5/32, Waradkarwadi, Near post Office wayari, Wayari, Malwan, Sindhudurg, 416606, MAHARASHTRACompletedDec 2025Oct 2024
Horizon Grande Wing 01p52900048514Survey No.29 Hissa No.5/1-5/29,5/31,5/32, Waradkarwadi, Near Post Office Wayari, Wayari, Malwan, Sindhudurg, 416606, MAHARASHTRACompletedDec 2024Oct 2024

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is among them

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Horizon Grande Wing 01 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Post Office Wayari530+ in Sindhudurg

Builder: Metric Homes Private Limited

Metric Homes Private Limited has 3 registrations on MahaRERA, including Horizon Grande Wing K and Horizon Grande Wing 02. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What does it mean that Horizon Grande Wing 01 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Horizon Grande Wing 01 is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Horizon Grande Wing 01?

The registered promoter entity is Metric Homes Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Horizon Grande Wing 01?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Horizon Grande Wing 01?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Horizon Grande Wing 01?

The professionals named in the filing: Architect: Alternate Angle Architects Pvt Ltd; Engineer: Er Rajendra Suresh Vankudre; Chartered Accountant: CA Deepen M Kapadia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Horizon Grande Wing 01?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Horizon Grande Wing 01. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Horizon Grande Wing 01 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.