Home / Browse projects / Thane, Maharashtra / HORIZON FLORA
HORIZON FLORA
RG-MH-96846 · RERA P51700008084 · Last updated on MahaRERA portal: 3 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 46 months past the filed date
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HORIZON FLORA is a Others project by K M ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700008084 on 18 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. The completion date has moved by 18 months from the original filing.
At a glance
Project
- NameHORIZON FLORA
- TypeOthers
- Location
- GHODBUNDER ROAD
- KASARVADAVALI
- Thane (M Corp.)
- Thane
- 400607
- Pincode400607
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700008084
- ReraGenie IDRG-MH-96846
Builder
- NameK M ENTERPRISES
- Entity typePartnership
- Other registrations2 more →
- Completed1 of 3
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Aug 2017
- Promised completion30 Dec 2022
- Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
- Buildings3 building records
- Documents filed123 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ABELIA AS PER APPROVED PLAN BUILDING A | NA | 22 | 0 | 0 | 0 | 0 |
| BAILEYA AS PER APPROVAL BUILDING B | NA | 9 | 0 | 0 | 0 | 0 |
| BUILDING C | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
ABELIA AS PER APPROVED PLAN BUILDING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BAILEYA AS PER APPROVAL BUILDING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed89
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| ABELIA AS PER APPROVED PLAN BUILDING A | 0 | 6 | 6 |
| BAILEYA AS PER APPROVAL BUILDING B | 1 | 7 | 8 |
| BUILDING C | 69 | 6 | 75 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AKRUTI CONSULTANTS |
| Partner | Role in project |
|---|---|
| K M ENTERPRISES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThane Municipal Corporation had withheld permission for additional construction on projects abutting Ghodbunder Road & Sought clarifications from Urban Development Department of Maharashtra Government. The Sanction was therefor withheld for period of approx. 18 Months.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Nov 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Oct 2023
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: 1 Architect’s Certificate on Completion of Project (Form 4).pdf | 3 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 22 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 2 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 2 Apr 2024 |
| Certificates of CA (Form 3)File: 21 Certificates of CA (Form 3).pdf | 2 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 18 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 27 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 27 Oct 2023 |
| Certificates of CA (Form 3)File: 18 Certificates of CA (Form 3).pdf | 27 Oct 2023 |
| Certificates of CA (Form 3)File: 19 Certificates of CA (Form 3).pdf | 27 Oct 2023 |
| Certificates of CA (Form 3)File: 20 Certificates of CA (Form 3).pdf | 27 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 Occupancy Certificate Completion Certificate Architect certificate of completion for plo | 27 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 28 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 28 Aug 2023 |
| Certificates of CA (Form 3)File: 17 Certificates of CA (Form 3).pdf | 28 Aug 2023 |
| Certificates of CA (Form 3)File: 14 Certificate of CA (Form 3 ).pdf | 28 Jan 2023 |
| Certificates of CA (Form 3)File: 15 Certificate of CA (Form 3).pdf | 28 Jan 2023 |
| Certificates of CA (Form 3)File: 16 Certificate of CA (Form 3).pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KME - FORM - 5.pdf | 21 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 16 Certificate of Architect (Form 1).pdf | 5 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16 Cerificate of Engineer (Form 2).pdf | 5 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 15 Certificates of Architect (form 1) (Mandatory for only ongoing project).pdf | 12 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 15 Certificates of Engineer(form 2) (Mandatory for only ongoing Project).pdf | 12 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2022 KME SCAN.pdf | 5 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31-03-2022 kme scan_compressed (1).pdf | 5 Jul 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration certificate Flora.pdf | 2 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 KM ENTERPRISES 20-21_compressed.pdf | 30 May 2022 |
| Certificates of CA (Form 3)File: Form 3 30-06-2021 KME_compressed.pdf | 21 May 2022 |
| Certificates of CA (Form 3)File: Form 3 30-09-2021 KME_compressed.pdf | 21 May 2022 |
| Certificates of CA (Form 3)File: Form 3 31-12-2021 KME_compressed.pdf | 21 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_30-09-2021 KME.pdf | 11 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2021 KME_compressed.pdf | 11 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_30-09-2021 KME.pdf | 11 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-2021 KME.pdf | 11 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-21 KME.pdf | 11 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30-6-21_KME.pdf | 11 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-21 KME.pdf | 11 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_30-06-21_KME_compressed.pdf | 11 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 31-03-2021 KME.pdf | 3 Mar 2022 |
| Building plan approvalFile: OC Plans KME 17-11-2021.pdf | 30 Nov 2021 |
| Building Plan Approval (IOD)File: OC Plans KME 17-11-2021.pdf | 30 Nov 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC A and B wing Flora.pdf | 26 Nov 2021 |
| Declaration about Commencement CertificateFile: Declaration of CC OF KME.pdf | 2 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: SOLED INVENTORY A Bldg_compressed.pdf | 2 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory KME B Bldg.pdf | 2 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory KME C Bldg.pdf | 2 Sep 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Commercial Up To 2nd Floor Horizon Flora.pdf | 2 Sep 2021 |
| Layout approvalFile: Layout Plan.pdf | 28 Aug 2021 |
| Building plan approvalFile: 01-_Page_2.pdf | 28 Aug 2021 |
| Building plan approvalFile: 01-_Page_3.pdf | 28 Aug 2021 |
| Building plan approvalFile: 01-_Page_4.pdf | 28 Aug 2021 |
| Building plan approvalFile: 01-_Page_5.pdf | 28 Aug 2021 |
| Building plan approvalFile: 01-_Page_6.pdf | 28 Aug 2021 |
| Building plan approvalFile: 01-_Page_7.pdf | 28 Aug 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 28 Aug 2021 |
| Building Plan Approval (IOD)File: 01-_Page_2.pdf | 28 Aug 2021 |
| Building Plan Approval (IOD)File: 01-_Page_3.pdf | 28 Aug 2021 |
| Building Plan Approval (IOD)File: 01-_Page_4.pdf | 28 Aug 2021 |
| Building Plan Approval (IOD)File: 01-_Page_5.pdf | 28 Aug 2021 |
| Building Plan Approval (IOD)File: 01-_Page_6.pdf | 28 Aug 2021 |
| Building Plan Approval (IOD)File: 01-_Page_7.pdf | 28 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_C-Bldg 12-08-2021.pdf | 21 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A KME_ (2019-20).pdf | 11 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5_KME_1-4-17 to 31-3-18.pdf | 6 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_KME_1-4-18 to 31-3-19.pdf | 6 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_KME_1-4-19 to 31-3-20.pdf | 6 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM - 2A KME 20-21_compressed.pdf | 8 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- KME.pdf | 24 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 KME.pdf | 24 Feb 2021 |
| Certificates of CA (Form 3)File: Form_3_-_KME.pdf | 24 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 KME.pdf | 5 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 KME.pdf | 5 Nov 2020 |
| Certificates of CA (Form 3)File: Form_3.pdf | 5 Nov 2020 |
| Certificates of CA (Form 3)File: Form_3.pdf | 4 Nov 2020 |
| Certificates of CA (Form 3)File: Form_3.pdf | 4 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf | 27 Aug 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HORIZON FLORA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KASARVADAVALI7,600+ in Thane
Filed coordinates, straight-line distance. 158 registered projects within 2 km.
Hiranandani Westgate Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Forestville - Phase 1
Oberoi Realty Limited
DOSTI WEST COUNTY - PHASE 4- DOSTI PINE
DOSTI ENTERPRISES
Y SQUARE
SHREE MALLINATH ENTERPRISE LLP
Primera
Agile Real Estate Dev Private Limited
UNIQUE VISTAS MHADA BUILDINGNO. 4 5 6 7
MADHU HARSHAD DOSHI
See every Thane project, with the district possession charts
Builder: K M ENTERPRISES
K M ENTERPRISES has 3 registrations on MahaRERA, including K M AVENUE and K M ENTERPRISES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that HORIZON FLORA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HORIZON FLORA is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HORIZON FLORA?
The registered promoter entity is K M ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HORIZON FLORA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HORIZON FLORA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HORIZON FLORA?
The professionals named in the filing: Architect: AKRUTI CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HORIZON FLORA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback