ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Horizon Bhumi

Registered No litigation declared Others project

Horizon Bhumi

By Majestic Horizon Bhumi Developers

RG-MH-06574 · RERA P51700053412 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Stilt Floor, 50%
56 of 97Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Horizon Bhumi is a Others project by Majestic Horizon Bhumi Developers in Thane, Maharashtra, registered with MahaRERA as P51700053412 on 31 Oct 2023. Possession is promised by 31 Mar 2028. 41 of the 97 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameHorizon Bhumi
  • TypeOthers
  • Location
    • Patlipada S V Road
    • Ghodbunder Road
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053412
  • ReraGenie IDRG-MH-06574

Builder

  • NameMajestic Horizon Bhumi Developers
  • Entity typePartnership
  • PartnersKuwar Dashrath Yadav, Omkar Manohar Satav, Mohan Baburao Shinde, Sunil Jagmal Dangi

Key dates

this monthRegisteredOct 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2023
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

42%41 of 97 units booked
16.4%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Horizon BhumiNA1919801797

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

Horizon Bhumi: 28% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure32%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed69

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots69
Closed/Covered69

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,370 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
Dev Bhakti Co Operative Housing Society LtdThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI6345.03
Proposed, not sanctioned6,192 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchACE Aviana, Ghodbunder Road, Kasarvadavli, Thane 400615
Estimated costRs 29.00 cr
Cost incurredRs 4.76 cr
Work done16.4%
BuildingWingEstimatedIncurred
Horizon BhumiNARs 23.20 crRs 4.69 cr
-NARs 5.80 crRs 6.96 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAkruti consultant
EngineerASSOCIATED STRUCTURAL CONSULTANTS
Chartered AccountantHARIYA & GANATRA
Chartered AccountantAnjali Ghatkar & Co.
PartnerRole in project
Majestic Horizon Bhumi Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Sep 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Final_FORM-1_Q3 FY 25-26.pdf22 Jun 2026
Withdrawal Update Form 1File: FORM-1 - signed.pdf22 Jun 2026
Withdrawal Update Form 2File: Final_FORM 2_Q3 FY 25-26.pdf22 Jun 2026
Withdrawal Update Form 2File: FORM-2 - signed.pdf22 Jun 2026
Withdrawal Update Form 3File: Final FORM-3_Q3 FY 25-26_11zon.pdf22 Jun 2026
Withdrawal Update Form 3File: Final_FORM 3_Q4 FY 25-26_compressed.pdf22 Jun 2026
Layout approvalFile: SANCTION_PLAN-1 (New including Parking Dets).pdf22 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Horizon Bhumi KM Developers FY 2024 25.pdf3 Dec 2025
Form 5 (FY 2023-2024)File: form 5 Mar 2024 Majestic Horizon Bhumi.pdf3 Dec 2025
Withdrawal Update Form 1File: FORM 1 Sep 25.pdf21 Nov 2025
Withdrawal Update Form 2File: FORM 2 Sep 25.pdf21 Nov 2025
Withdrawal Update Form 3File: FORM 3 Sep 25 compressed.pdf21 Nov 2025
Commencement certificateFile: cc.pdf27 Sep 2025
Withdrawal Update Form 1File: FORM1 30 06 25.pdf27 Sep 2025
Withdrawal Update Form 2File: FORM_2_-30 06 25.pdf27 Sep 2025
Withdrawal Update Form 3File: Form 3 Horizon Bhumi Compressed.pdf27 Sep 2025
Form 2A (FY 2024-2025)File: Form-2A-_Horizon_Bhumi[1] - mar.2025.pdf16 Sep 2025
Layout approvalFile: SANCTION_PLAN-7.pdf29 Jul 2025
Layout approvalFile: SANCTION PLAN 1 to 2.pdf29 Jul 2025
Layout approvalFile: SANCTION PLAN 3 to 4.pdf29 Jul 2025
Layout approvalFile: SANCTION PLAN 5 to 6.pdf29 Jul 2025
Copy of Layout Approval (in case of layout)File: SANCTION_PLAN-7.pdf29 Jul 2025
Copy of Layout Approval (in case of layout)File: SANCTION PLAN 1 to 2.pdf29 Jul 2025
Copy of Layout Approval (in case of layout)File: SANCTION PLAN 3 to 4.pdf29 Jul 2025
Copy of Layout Approval (in case of layout)File: SANCTION PLAN 5 to 6.pdf29 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-MAJESTIC-31-03-2025.pdf29 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 as on 30-06-2025.pdf29 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: CC upto 18th floor.pdf29 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: Rev CC.pdf19 Jul 2025
Details of encumbrances concerned to FinanceFile: Encumbrance letter.pdf12 Mar 2025
Details of encumbrances concerned to LegalFile: Encumbrance letter.pdf12 Mar 2025
Proforma of Agreement for saleFile: AFS.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf18 May 2024
Proforma of Agreement for saleFile: Agreement For sale_PDF_uploaded.pdf8 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Revised_Final__compressed.pdf31 Aug 2023
Other - LegalFile: Project Detalis_As per Architect.pdf29 Aug 2023
Details of encumbrances concerned to FinanceFile: Financial_and_Legal_Encumbrance_position_as_on_23-08-2023.pdf25 Aug 2023
Details of encumbrances concerned to LegalFile: Financial_and_Legal_Encumbrance_position_as_on_23-08-2023.pdf25 Aug 2023
Declaration about Commencement CertificateFile: Declaration_about_commencement_certificate.pdf25 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf25 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2_compressed.pdf25 Aug 2023
CERSAI detailsFile: Debtor based dec;lrartion.pdf25 Aug 2023
CERSAI detailsFile: Asset based dec;lrartion.pdf25 Aug 2023
CERSAI detailsFile: Debtor Based Report.pdf25 Aug 2023
CERSAI detailsFile: Asset based Report_New.pdf25 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_D_Disclosure_of_Interest SUNIL DANGI.pdf25 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure_D_Disclosure_of_Interest KUWAR YADAV.pdf25 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in oher real estate organization - Omkar Satav.pdf25 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organization - Mohan B Sinde.pdf25 Aug 2023
Proforma of Allotment letterFile: Allotment Letter_PDF.pdf25 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Acc Declration.pdf25 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation report with respect to allotment letter (As per RERA).pdf25 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report with respect to model copy of agreement (As per RERA).pdf25 Aug 2023
Layout approvalFile: Layout Plans.pdf23 Aug 2023
Building plan approvalFile: CC-Dated- 23-06-2023.pdf23 Aug 2023
PAN CardFile: PAN Card_Majestic Horizon Bhumi Developers.pdf23 Aug 2023
Copy of the legal title reportFile: Legal Title Certificate_compressed.pdf23 Aug 2023
Copy of Layout Approval (in case of layout)File: Layout Plans.pdf23 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: CC-Dated- 23-06-2023.pdf23 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC-Dated- 23-06-2023.pdf23 Aug 2023
Declaration in FORM BFile: Form_B_Compressed.pdf23 Aug 2023

How this compares with Thane

42%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Horizon Bhumi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghodbunder Road7,600+ in Thane

2 kmHorizon BhumiCompleted 83Lapsed / revoked 15Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 137 registered projects within 2 km.

Builder: Majestic Horizon Bhumi Developers

Majestic Horizon Bhumi Developers has 1 registration on MahaRERA, including Horizon Bhumi. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Horizon Bhumi is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Horizon Bhumi?

The registered promoter entity is Majestic Horizon Bhumi Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Horizon Bhumi?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Horizon Bhumi?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Horizon Bhumi?

The professionals named in the filing: Architect: Akruti consultant; Engineer: ASSOCIATED STRUCTURAL CONSULTANTS; Chartered Accountant: HARIYA & GANATRA; Chartered Accountant: Anjali Ghatkar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Horizon Bhumi?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Horizon Bhumi. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Horizon Bhumi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.