ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Homedale Imperia

Registered No litigation declared Commercial project

Homedale Imperia

By M/s. Om Shiv Sai Promoters & Developers

RG-MH-96286 · RERA P52100053792 · Last updated on MahaRERA portal: 2 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
9 of 11Construction stages donefurthest along: External plumbing and external plaster, 50%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Homedale Imperia is a Commercial project by M/s. Om Shiv Sai Promoters & Developers in Pune, Maharashtra, registered with MahaRERA as P52100053792 on 30 Nov 2023. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameHomedale Imperia
  • TypeCommercial
  • Location
    • DIAT Bypass Road
    • Khadakwasla
    • Khadakwasala
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053792
  • ReraGenie IDRG-MH-96286

Builder

  • NameM/s. Om Shiv Sai Promoters & Developers
  • Entity typePartnership
  • PartnersPravin Shevkar, Jankiram Kanade, Vinod Badhe
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Nov 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Amenity BuildingNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 50%.

Amenity Building: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes60%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes6%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered6
Open Space6

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,725 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
Om Shiv Sai Promoters & DevelopersKhadakwasalaPune
Shree Swami Samarth Co op Hsg SocKhadakwasalaPune
Kaluram Mate & othersKhadakwasalaPune
Shantaram Maruti MateKhadakwasalaPune
Deoobai Prabhakar HagwaneKhadakwasalaPune
Laxmibai Baban WanjaleKhadakwasalaPune
Raghunath Dhondiba MateKhadakwasalaPune
Pandurang Dhondiba MateKhadakwasalaPune
Shukracharya Shivaji MateKhadakwasalaPune
Kiran Shivaji MateKhadakwasalaPune
Subhadra Shivaji MateKhadakwasalaPune

Approvals and building plan

Permissible FSI3202.11
Proposed, not sanctioned2,187 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 2 3 4 Solitaire 6 Plot No 3a1 3a2 Ramnagar Colony Bavdhan Pune 411021

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCrystal Arch
EngineerMakarand Kulkarni
EngineerStructure Vizion
Chartered AccountantTanaji Chorghe
Chartered AccountantKalse & Associates
PartnerRole in project
M/s. Om Shiv Sai Promoters & Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Apr 2025

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: Form-4_OSS.pdf2 Apr 2025
Other - FinanceFile: Form-4_OSS.pdf2 Apr 2025
Other - TechnicalFile: Form-4_OSS.pdf2 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Amenity Building Completion Certificate.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1RERA ARCHITECT CERTIFICATE_AMENITY BUILDING.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory_RERA.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form_2A.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form_3.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECT CERTIFICATE_AMENITY BUILDING_Completed.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers certificate 2_Completed.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Phase III - Disclosure of sold-Booked Inventory Word_Rev1_Completed.pdf20 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineers certificate_Competed.pdf20 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineers certificate_Competed.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Homedale_Completed.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 engineers certificate.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form -2A engineers certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf20 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form-3 CA.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECT CERTIFICATE_AMENITY BUILDING_15-04-2024.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECT CERTIFICATE_AMENITY BUILDING_15-04-2024.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE OSS.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A EMGINEERS CERTIFICATE OSS.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory15032024.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Homedale Imperia.pdf15 Apr 2024
Details of encumbrances concerned to FinanceFile: homedale phase 3.pdf28 Mar 2024
Details of encumbrances concerned to LegalFile: homedale phase 3.pdf28 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Phase III.pdf27 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate - Phase III.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate form 1 phase III.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Homedale Imperia.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer Certificate Homedale phase III.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory - Phase III.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Homedale Imperia REDUCED.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Homedale Imperia REDUCED.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Homedale Imperia REDUCED.pdf16 Jan 2024
Home Buyer /Allottee Grievance Redressal CellFile: Homedale imperia redressal cell.pdf25 Oct 2023
Copy of the legal title reportFile: OSS title search report 25102023 compressed.pdf6 Sep 2023
Proforma of Agreement for saleFile: HomedaleMaster DraftRev 6.pdf3 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Adobe Scan 3 Aug 2023.pdf3 Aug 2023
Building plan approvalFile: page 18 19.pdf23 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: page 18 19.pdf23 Jun 2023
CERSAI detailsFile: cersai_OSS.pdf23 Jun 2023
Deviation Report with respect to Allotment letterFile: Allotment letter deviation phase 3 rev 2.pdf23 Jun 2023
Building plan approvalFile: Sanctioned plan page 2 to 5_compressed.pdf19 Jun 2023
Building plan approvalFile: Sanctioned plan page 17.pdf19 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned plan page 2 to 5_compressed.pdf19 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned plan page 17.pdf19 Jun 2023
Declaration in FORM BFile: form B oss reduced.pdf19 Jun 2023
Building plan approvalFile: Sanctioned plan page 1_compressed.pdf14 Jun 2023
Layout approvalFile: layout 2023 reduced.pdf14 Jun 2023
PAN CardFile: OSS PAN Card.pdf14 Jun 2023
Details of encumbrances concerned to FinanceFile: ENCUMBERANCE.pdf14 Jun 2023
Details of encumbrances concerned to LegalFile: ENCUMBERANCE.pdf14 Jun 2023
Copy of Layout Approval (in case of layout)File: layout 2023 reduced.pdf14 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned plan page 1_compressed.pdf14 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: CC COMPRESSED.pdf14 Jun 2023
Declaration about Commencement CertificateFile: commencement declaration.pdf14 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf14 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PForm - 2 (1).pdf14 Jun 2023
Disclosure of sold/ booked inventoryFile: unsold inventory disclosure.pdf14 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (1).pdf14 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: kanade other proj disclosure.pdf14 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: sandeep other project disclosure.pdf14 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: pravin other proj disclosure.pdf14 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure vinod other projects.pdf14 Jun 2023
Proforma of Allotment letterFile: Allotment letter phase 3.pdf14 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration separate bank account.pdf14 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GrasslandS.No. 15 P and others Kolhewadi Khadakwasla Pune 411041228CompletedMar 2018Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Homedale Imperia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khadakwasla13,700+ in Pune

2 kmHomedale ImperiaCompleted 18Lapsed / revoked 8Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: M/s. Om Shiv Sai Promoters & Developers

M/s. Om Shiv Sai Promoters & Developers has 3 registrations on MahaRERA, including Homedale and HOMEDALE PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Homedale Imperia is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Homedale Imperia?

The registered promoter entity is M/s. Om Shiv Sai Promoters & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Homedale Imperia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Homedale Imperia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Homedale Imperia?

The professionals named in the filing: Architect: Crystal Arch; Engineer: Makarand Kulkarni; Engineer: Structure Vizion; Chartered Accountant: Tanaji Chorghe; Chartered Accountant: Kalse & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Homedale Imperia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Homedale Imperia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Homedale Imperia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.