Home / Browse projects / Mumbai Suburban, Maharashtra / HOMAI MAHAL
HOMAI MAHAL
By HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED
RG-MH-29561 · RERA P51800029444 · Last updated on MahaRERA portal: 6 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 9 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HOMAI MAHAL is a Residential / Group Housing project by HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029444 on 29 May 2021. Possession was promised by 31 Dec 2023 and is now 34 months past that date. 9 complaints are on record with the regulator.
At a glance
Project
- NameHOMAI MAHAL
- TypeResidential / Group Housing
- Location
- STREET
- VILLEPARLE
- Andheri
- Mumbai Suburban
- 400057
- Pincode400057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800029444
- ReraGenie IDRG-MH-29561
Builder
- NameHOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED
- Entity typeSociety
- ChairpersonDR JITENDRA SINGH
- SecretoryMRS PRIYA KAMAT
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 May 2021
- Promised completion31 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HOMAI MAHAL | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.
HOMAI MAHAL: 51% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 7% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PRANEETA REALTY Proprietor Mr.Vikram Parmar | Andheri | Mumbai Suburban |
| ULRA SAFE SERVICES | - | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BIPIN MORE |
| Engineer | S S THATE |
| Chartered Accountant | AJAY SHUKLA & ACCOCIATES |
| Partner | Role in project |
|---|---|
| HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED | - |
Litigation declared18
| Case | Court | Status |
|---|---|---|
| Arbitration Petition/2017 | Arbitrator Farhan P dubhash | Cross Examiniation of Respondent |
| CARBP/184/2017/2017 | High Court | Disposed Off |
| 2353/2015 | Dindoshi Court | Chamber summon Rejected WP filed on Jan ten year two thousand twenty |
| WPST/375/2020/2020 | High Court | Pre Admission |
| 462/2017/2017 | Dindoshi Court one | Framing Issues |
| 461/2017/2017 | Dindoshi Court | Framing Issues |
| 460/2017/2017 | Dindoshi Court one | Framing Issues |
| 459/2017/2017 | Dindoshi Court | Framing Issues |
| NOM 433/2017/2017 | High Court | Disposed Off |
| 434/2017/2017 | High Court | Disposed Off Order Passed |
| NOM - L 335/2017/2017 | High Court | Pending |
| NOM - L 343/2017/2017 | High Court | Pending |
| 388/2018/2018 | High Court | Pending for Our written statement |
| 383 / 2018/2018 | High Court | Pending for our written statement |
| 379/2018/2018 | High Court | Pending written statement filed |
| 2546/2018/2018 | National Consumer Complaint | Pending |
| 727/2018/2018 | State Consumer Complaint | pending |
| 280/2019/2019 | Court Receiver Office HC | Pending |
Complaints filed with MahaRERA9
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000198369 | Kunal Sodhi HUF | Homai Mahal CHSL and Anr | 18/09/2021 |
| CC006000000198495 | Shilpa Sodhi and Anr | Homai Mahal CHSL and Anr | 28/09/2021 |
| CC006000000198681 | Sandip Shriram Gujar and Sharvari Sandip Gujar | Homai Mahal Premises Co-Op Society Limited | 17/10/2021 |
| CC006000000221099 | Dinesh Sanwarmal Chaudhary | Homai Mahal Premises Co. Op. Soc. Ltd. | 09/05/2022 |
| CC006000000251907 | Rakesh Kumar Patni | Praneeta Realty | 06/08/2022 |
| CC006000000292314 | Rakesh Kumar Patni | M/S. ICON BUILDERS & DEVELOPERS | 11/08/2022 |
| CC006000000292315 | POONAM PATNI | M/S. ICON BUILDERS & DEVELOPERS | 12/08/2022 |
| CC006000000292422 | ARCHANA BAHETI | M/S. ICON BUILDERS AND DEVELOPERS | 26/08/2022 |
| CC006000000303254 | Anju Dinesh Chaudhary | Homai Mahal Premises Co. Op. Hsg. Soc. Ltd. | 19/11/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 May 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 May 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 May 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 May 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CERSAI detailsFile: GetUserDocumentFileContent.pdf | 6 Feb 2025 |
| CERSAI detailsFile: GetUserDocumentFileContent.pdf | 6 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: FINA.pdf | 5 Feb 2025 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 5 Feb 2025 |
| Declaration about Commencement CertificateFile: CC H.pdf | 5 Feb 2025 |
| Details of encumbrances concerned to LegalFile: FINA.pdf | 5 Feb 2025 |
| Proforma of Agreement for saleFile: AGREEEMENT FOR SALE_RERA.pdf | 5 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: INDID.pdf | 5 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: UNSEC.pdf | 5 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: FINA.pdf | 5 Feb 2025 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 5 Feb 2025 |
| Declaration about Commencement CertificateFile: CC H.pdf | 5 Feb 2025 |
| Details of encumbrances concerned to LegalFile: FINA.pdf | 5 Feb 2025 |
| Proforma of Agreement for saleFile: AGREEEMENT FOR SALE_RERA.pdf | 5 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: INDID.pdf | 5 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: UNSEC.pdf | 5 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: ESSS.pdf | 20 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: ESSS.pdf | 20 Jan 2025 |
| Declaration about Commencement CertificateFile: 1 Details of encumbrances.pdf | 8 Jan 2025 |
| CERSAI detailsFile: 1 Details of encumbrances.pdf | 8 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Details of encumbrances.pdf | 8 Jan 2025 |
| Declaration about Commencement CertificateFile: 1 Details of encumbrances.pdf | 8 Jan 2025 |
| CERSAI detailsFile: 1 Details of encumbrances.pdf | 8 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Details of encumbrances.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 Dec 2023 |
| OtherFile: Dhrumil Index 2.pdf | 30 Apr 2022 |
| OtherFile: Mr Santosh Gupta Index 2.pdf | 30 Apr 2022 |
| OtherFile: Pyarelal Index II.pdf | 30 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC VALIDITY LETTER.pdf | 24 May 2021 |
| Layout approvalFile: SCAN-20210521_0001-RZ-reduced.pdf | 21 May 2021 |
| Layout approvalFile: SCAN_20210521_0002-RZ -reduced.pdf | 21 May 2021 |
| PAN CardFile: PAN merged.pdf | 21 May 2021 |
| Copy of Layout Approval (in case of layout)File: SCAN-20210521_0001-RZ-reduced.pdf | 21 May 2021 |
| Copy of Layout Approval (in case of layout)File: SCAN_20210521_0002-RZ -reduced.pdf | 21 May 2021 |
| Copy of the legal title reportFile: title report for rera-FORMAT-A.pdf | 17 May 2021 |
| Details of encumbrancesFile: HM_NO_encumberence_letter WITH STAMP.pdf | 17 May 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 13 May 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure A.pdf | 13 May 2021 |
| Copy of the legal title reportFile: List of matters_Homai Mahal and status-reduced.pdf | 6 May 2021 |
| OtherFile: ENCLOSING LETTER DIGITALLY SIGNED.pdf | 6 May 2021 |
| OtherFile: Resolution for Committe to Sign papers-uploaded.pdf | 6 May 2021 |
| OtherFile: resolution oct 2016.pdf | 6 May 2021 |
| OtherFile: List of matters_Homai Mahal and status-reduced.pdf | 5 May 2021 |
| Building plan approvalFile: iod plan-Reduced-1.pdf | 4 May 2021 |
| Building plan approvalFile: iod plan-Reduced-2.pdf | 4 May 2021 |
| Building plan approvalFile: homai mahal iod-reduced.pdf | 4 May 2021 |
| Layout approvalFile: Sale flats Config statement uploaded on RERA.pdf | 4 May 2021 |
| Copy of Layout Approval (in case of layout)File: Sale flats Config statement uploaded on RERA.pdf | 4 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: iod plan-Reduced-1.pdf | 4 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: iod plan-Reduced-2.pdf | 4 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: homai mahal iod-reduced.pdf | 4 May 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: FSI CALCULATIONS as certified by architect.pdf | 4 May 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 Signed by Architect.pdf | 4 May 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Flesibility Report 20 3 21- Final.pdf | 4 May 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sale flats Config statement uploaded on RERA.pdf | 4 May 2021 |
| Status of ConveyanceFile: property card.pdf | 4 May 2021 |
| OtherFile: SRO REGISTRATION CERTIFICATE.pdf | 4 May 2021 |
| Copy of the legal title reportFile: Ttile Report by Solicis lex-reduced in size.pdf | 30 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC UP TOTHREE FLOORS ATTESTED BY ARCHITECT.pdf | 30 Apr 2021 |
| Declaration in FORM BFile: Form-B-reduced size.pdf | 30 Apr 2021 |
| Proforma of Allotment letterFile: First Draft of Agreement for Sale (Homai Mahal) - February 5 2021-Reduced Size.pdf | 30 Apr 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society registration certificate-reduced.pdf | 30 Apr 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HOMAI MAHAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILLEPARLE6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 381 registered projects within 2 km.
Vijayraj Residency
Vijayraj Realtors
ZEE HAPPY VEENA
ZEE LIFESPACES
Romell Espalier
ROMELL REAL ESTATE PRIVATE LIMITED
ZEE SHAAN
TRISUL DEVELOPERS
SALE BUILDING 1 - CHAMUNDA CROWN AND SALE BUIL
Chamunda Builders & Developers
ARKADE PEARL 1
ARKADE DEVELOPERS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED
HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED has 1 registration on MahaRERA, including HOMAI MAHAL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that HOMAI MAHAL shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HOMAI MAHAL is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HOMAI MAHAL?
The registered promoter entity is HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HOMAI MAHAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against HOMAI MAHAL?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for HOMAI MAHAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HOMAI MAHAL?
The professionals named in the filing: Architect: BIPIN MORE; Engineer: S S THATE; Chartered Accountant: AJAY SHUKLA & ACCOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HOMAI MAHAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback